Section 26(5)(a) in The Orissa Electricity Reform Act, 1995
(a)shall not show undue preference to any consumer of electricity, but may differentiate according to the consumer's load factor or power factor, the consumers total consumption of energy during any specified period, or the time at which supply is required;