Section 172(2) in The Petroleum Rules, 2002

(2)An adequate supply of water shall be available at all strategic points in the refinery by means of an independent ring main or grid provided with isolating valves. The main shall be kept constantly pressurised by two or more boosting pumps of adequate capacity preferably working automatically as any significant loss of pressure in the main occurs. At least one of the boosting pumps shall be independent of the normal power supply.