Section 7(1)(d) in Telangana Municipal Tramways (Construction, Operation and Maintenance) Act, 2008
(d)the conditions on which any part of the tramway system may be constructed over a bridge or across a railway or a tramway carriage-way, when the carriageway over the bridge is to form part of the tramway system or when any part of the tramway system is to cross a railway or another tramway carriage-way on any level;