Section 134(a) in Goa Building and Other Construction Workers' (Regulation of Employment and Conditions of Service) Rules, 2008
(a)where the depth of a trench requires two lengths of shoot piling, one above the other, the lower piling is set inside the bottom strings or walls of the upper piling and such sheet piling is driven down and braced as the excavation continues;