Section 24(2)(iv) in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014
(iv)the rate of return of a new project shall be reduced by 1% for such period as may be decided by the Commission, if the generating station or transmission system is found to be declared under commercial operation without commissioning of any of the Restricted Governor Mode Operation (RGMO)/ Free Governor Mode Operation (FGMO), data telemetry, communication system up to load dispatch centre or protection system: