Section 5(6)(a) in The Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Petroleum and Petroleum Products Pipelines) Regulations, 2010
(a)entity has paid the application fee along with the application-cum-bid as specified for trunk-lines as specified under regulation 3 of the Petroleum and Natural Gas Regulatory Board (Levy of Fee and Other Charges) Regulations, 2007 as amended from time to time by the Board: