| Voltage dips and short interruptions | Interruption from reference voltage to zero voltage for one half cycle.Interruption from reference voltage to 50% of reference voltage for two half cycles.These mains voltage interruptions shall be repeated ten times with a time interval of at least 10 seconds. |
| Object of the test: | To verify compliance with the provisions in paragraph 4(1)(iii) under conditions of short mains voltage interruptions and reductions while observing the weight indication for a static load approximately equal to the minimum capacity. |
| Test procedures in brief: | |
| Precondition: | None required |
| Condition of the EUT: | Normal power supplied and "on" for a time period equal to or greater than the warm-up time specified by the manufacturer.Adjust the EUT as close to zero indication as practicable, prior to the test. Zero-setting functions shall not be in operation. Not to be adjusted or readjusted at any time during the test except the reset if a significant fault has been indicated. |
| Number of test cycles: | At least one cycle. |
| Weighing test and test sequence: | The EUT shall be tested with a test load approximately equal to the minimum capacity.Stabilize all factors at nominal reference conditions. Apply the test load and record the following data:(a) date and time(b) temperature(c) power supply voltage(d) test load(e) indications(f) errors(h) functional performanceInterrupt the power supply to zero voltage for a period equal to one half cycle and conduct the test. During nterruption observe the effect on the EUT and record as appropriate.Reduce the power supply to 50% of nominal voltage for aperiod equal to two half cycles and conduct the test. Duringreductions observe the effect on the EUT and record, asappropriate. |
| Maximum allowable variations: | The difference between the weight indication due to the disturbance and the indication without the disturbance either shall not exceed the values given in paragraph 4(2)(v), or the EUT shall detect and act upon a significant fault. |
| Environmental phenomena | Test specification |
| Fast transient common mode | 0.5KV(peak)5/50ns T1/ThSkHz rep. Frequency |
| Environmental phenomena | Test specification |
| Fast transient common mode | 0.5kv(peak) 5/50ns T1/Th5 kHz rep. Frequency |
| Environmental phenomena | Test specification |
| Fast transient common mode | 0.5Kv(peak) 5/50ms T1/Th5 kHz rep. Frequency |
| Object of the test: | To verify compliance with the provisions in paragraph 4(1)(iii) under conditions where electrical bursts (fast transients) are superimposed on the mains voltage while observing the weight indication for a static test load pproximately equal to the minimum capacity. |
| Test procedures in brief: | |
| Precondition: | None required. |
| Condition of the EUT: | Normal power supplied and "on" for a time period equal to or greater than the warm-up time specified by the manufacturer. Reset the EUT if a significant fault has been indicated. |
| Stabilization: | Before any test stabilize the EUT under constant environmental conditions. |
| Weighing test: | With the single static load in place record the following with and without the transients:(a)Date and time(b)Temperature(c)Test load(d)Indications (as applicable). |
| Maximum allowable variations: | The difference between the weight indication due to the disturbance and the indication without the disturbance either shall not exceed the value given in paragraph 4(2)(v) of Part I, or the instrument shall detect and act upon a significant fault. |
| Environmental phenomena | Test specification |
| Electrostatic discharge | 8 kv air discharge6 kv contact discharge |
| Object of the test: | To verify compliance with the provisions of paragraph 4(1)(iii) under conditions where electrostatic discharges are applied while observing the weight indication for a static test load approximately equal to the minimum capacity. |
| Test procedures in brief: | |
| Precondition: | Normal power supplied and "on" for a time period equal to or greater than the warm-up time specified by the manufacturer. Reset the EUT if a significant fault has been indicated. |
| Stabilization: | Before any test stabilize the EUT under constant environmental conditions. |
| Weighing test: | With the single static load in place, record the following with and without electrostatic discharge:(a)Date and time(b)Temperature(c)Test load(d)Indications (as applicable) |
| Maximum allowable variations: | The difference between the weight indication due to the disturbance and the indication without the disturbance either shall not exceed the value given in paragraph 4(2)(v) of Part I or the instrument shall detect and act upon a significant fault. |