National Green Tribunal

Chaitanya Sravanthi Represented By Its ... vs The Andhra Pradesh Pollution Control ... on 1 February, 2022

Bench: K Ramakrishnan, K. Satyagopal

Item No.03:

BEFORE THE NATIONAL GREEN TRIBUNAL
SOUTHERN ZONE, CHENNAI

Original Application No. 68 of 2015 (SZ)
(Through Video Conference)

IN THE MATTER OF:
Chaitanya Sravanthi ... Applicant(s)

The APPCB,
Hyderabad and others.

ibs

&
=

GOPAL KORLAPATI, EXPERT MEN For Applicant(s):

For Respondent(s):
1. As per order dated 03.01.2022, this Tribunal has taken up the matter for consideration of further report to be filed by the Andhra Pradesh Pollution Control Board (APPCB). No report has been filed after the matter was considered by this Tribunal earlier. On that day the learned counsel appearing for Andhra Pradesh Pollution Control Board (APPCB) submitted that they have submitted the report. But office informed no such report has been received.

. The 3% respondent/Visakhapatnam Port Trust also directed to file the subsequent compliance report of complying the directions issued by the Andhra Pradesh Pollution Control Board (APPCB).

. This Tribunal also directed the Andhra Pradesh Pollution Control Board (APPCB) to consider the nature of actien taken by them on the basis of the complaint received from Mr. M ol Advocate by its letter dated 18.12.2021 and poe me case to r that purpose.

>.

: op August 2021 to 4 Quarterly report fer the period from Aumimt, 202 1 to October, 2021 in compliance to Hon'ble NGYT order dated: 05.06.2026 in the application Ne.G8/2015 Aled by Chakienye Sravanthi Organization against M/s Visakhapatnam Port Trust(¥PT}, Visakhapatnam:

Yhe Honile NOT vide Order di: G5 Stete Paflutien control Pradesh "xe period from Anuzust, NaGS/2015 is harewith submitted PRTG any > aero € follows:
G8. 2620 in the application Board to contirare directions, and to ae gearterly reports ta Hon'ble NGT. 2021 to Getober, 202) In commllance The Board Ofleials | TS.1L2021 and the status of compliance for the directions issued by the Baard MS & 92.03.2020 with regard to action man submitted by t Res HH /S078 directed Andhra the muontitoring as per previous x The spiarteriy repart for the oO order d&05.06.2020 in QLA ctad the Port Trast Arca on ord the M/a¥PY TRSpec aeiche VERE a: order cds 2: 8.42, 2 Ois §.Na Tirecticon Present stakes IMMEDIATE MEASURES:
'ye port shall cover sl the stack yards of dusty cargoes (eoal and other carfoes etc} with tarpaulins immediately and no coal stack yard shall witheat covering with tarpau exdsy fins.
Not Complied. GUS of the dusty cargs is covered with tarpaulins and the remaining dusty cargo is in feading and uninading eandition theralare the facility has ret cxvered folly.
et The port shall restrict the stack Helebt of coal piles apie 6 m as per the CFO condition and the axcess stacking shall be removed imrneniately.
Net Compled. The husight af tha. stack fs restricted to Gimps in the steck yard but few coal stack heights are mire than 6 nits was observed during inspection. Even drectest several times by the Hoard O¥fcials, M/s ¥VPT is not restricting the stack height gp to 6 nis te comply the af coal piles ;
Board directions.
mot shore any } af west of ESSAR and the existing dusty cm removed immnediataly. 3 i The dhesty £2 port sball rgo shall be fires storing any dusty cargo at and at present Me SVEP 2 M/S. VPP is not west of ESSAR storing the prarigaress are at west of ESSAR eonbdning lumps and fines. The Manganese are covered wilh tarpaulins. 4 The part shall net store any duety cargo withont MDSS system at any location in the port prenses, Not Coraptied. There are MDSS eysteme at 4} WOR area, HY S-4 area, NA) La? are i} Ra - RS area, M/s VPP cargy Le, coal cargo ab R-2, R-4¢ & B-S, FM Office. The facility has aprinklers at KZ to RO area, ig storing the rear ta city a7 kee aig ae ravi Li sprinklers TENA findown rea, 8 sprinklers at North-West Carnes 3 at WOS, 22 sprinkle:
at NH yard area and U4 no. of 2 sprinklers he facility to install provided at afd FO Godown 8 svmmed that they proposed has ink at & more areas vis, Lo area, Oppas Near MG Gate and abang Coast Guard (Nficee Road with an 3 S.No Dherectin Pp reagent sistas RsB42 Crores i proposed aad expected to be carnplered by estimated cust af fune-2022.
Ma ¥PT sup@oes to start the constriction of % covered storage sheds af size 200m x 4tyn x i? mand 200m 230m w i?m at Rae i RO areas for storing the dusty carge from SLGZo2G. MésVPT submitted that they proposed te ronstruct ene covered storage shed of sive 400 mits X 40 mits & £7 mits at Rid area for storing the dusty carge with ag estimated cast of Rs28.61 crores apd issued e-protarement notice invilhig tender{é-NEB} on 30.04.2021. The period af sammpletion of uae work. efated in lender ig 12 imonths. The facility bas informe that the finalization of the tender will be completed by 31.08.2021 and the expected date of conipletion of work is 30.08 2022. In tids regard, iris to submit that the faciihy has not complied with the Roard direction within stipglated time.
at Fhe port shal} aint store ary dusty cargm at Hed] area, The facdity hae preposed te construct | coversd storage shed of sige 400 m 3 40 m X 74 min R-LD area and expected date af completion af wark is 30.00.2022.
* lan for reorganization af caal ards, which are pear to terface bamediately.
The port shall submit an action | isubmitted by M/s. VPT on action plan 28 U2. 2020, the coal stacking yards propuged to be shifted | to tee areas created by the denmilitien of | abandoned bufidings of port area, At present, chal stacks at R2 tu BS areas are proposed to shift to newly developed arse af 28.200 Sq mt near duck main gate by dignmantiing the existing building and another area of about 42,200 sq mt, but the managemaat af M/s. VPP fras not shited the caal stacking yards to the new proposer] location. The facility has provided MDSS at 82 to RS area.

Not Compliied. As per 'fhe port shall submit an action plan for reorganization af all the chusty stacking yards and submit the stacking yard plan within i8 days, Not Cormplied. As per the submitted by M/s.V¥PT on 24 ' cou stacking yards pragosed to be shifted ta the arpas created by the demalition af abandoned buildings of part area present coal stacks at Wa to RS areas prnposed to shut to newly developed area of 19,200 Sq mt near deck main gate by dismaniling the existing building and another area of about 42,200 sy nat, ina the management of M/s. VPY bas aah shifted tins coal stacking yards fo the new proposed lucation. The facility has opravided MDS eystem at AZ to AS area and requested to permit to handle eaal at RZ to AS area.

Direction Present stains nk fy The port shall submdt an action plan for mechanisatinn of the dusty within SO days.

carga handling berths There are 5 berths in the outer harbour which are mechasigad, TRere are 21 berths in the inner harbour as detalinc Rast Gock areca: RQ} i te EQ-10 = 10 berths, West Dock area: WQ-1 te WO-6 = 8 berths. w pstern arin OR i. UR-2R PR = 3 berths.

mechantied LY EQS operates by M/s Adan. 2} EG-10 operated hy M/s AVR 3} WES ¥PT Informed thah RU-8, E-9, WO-S, WO-? & W8 are already operated with semi mechanized systera and they dropoed the 2 to EQS as it is net Hence infers.

onerated by M/s Nalco.

plan to mechanize E-

Xv tally viable, carge "Whe fertilizers, food grai f wort bas cargo, steel, granite ete. Su far given any cammitment letter fa this regard.

iy BB SHORT TERM MEASURES The port shall the inghalation and ¢ the trunk tyre washiog - factity by SL March 2018, VPY has provided Tru g Hamm aril iso Both the pe Ca oe oe facd complete the ncnTH Assign Ag shail ard mountad fog canary f unloading o 'March 2074.

The port tnatallation of the & system ad loading / dusty carga by S48 Puck Nos. af Mobile Fog deplaying fog machines at cay is having 2 and wiloading of dusty CARS loading / gus at Re berths.

72

red The port shall complete the refaurbishing all the existing MOSS and shall be operational by 22s March 2018, are working Pers.

The port shall install § CAAQM gtations and cormect to APPOB wabsite by 312 March 2074, installed three CAAQM stations at GOH webtity, R&Y area aad at Old Stadiar (GVMC} aren bal three stations are iy operation, AL 3 statharg ¢ CECB / APPUB website.

roe are connected fo r shall comply with the argets Need for the plantation ander Green Visakha Prograre.

| ae Mys. VPP has uvformed thar 30.00) ols he Bane achieve to tn The rach "has. informed 'chat they | requested District Authorities for providin 8 the vacant to pint the ba dantation.

¥ ¥ t y fared AARC S.No Direction Preset status & The port shall procure | The fkellity fs varryimg? out sweeples Mechanical sweeping ruachine by Sts March ZOES.

through 3 Mechanical Sweeglog Ma ' MEDIUM TERM MEASURES:

i Comvent The port shai complete the constraction of concrete wall of 7.5 m height and 1.7 KM long Le from the sea Horse fineti Runcting af © interface by Si R uly 2016.

The port has genstracted 7.50. ra height compuund wed) to alengt 8 of 1.00 KM fruni Convert in. to Kobbar ighe ba Poo ard O70 8M from Kobbarithota jn. ta Sea Horse in. at the eity hateriace.

"P The port shall complete me i VPY upgraded STP with Hypo dosing upgridation of the ATP to handle i system for distafecthan. 1GMLD with proper guality ontpart to meet to the standards ofthe hoard by SI july 2046.
2 The yort shall prov @ Ch | Jostailed Ch cameras acd aut con nec ted £0 'Cameras at rhe coi yard and | APPCH website. VET tated that the connect if to Website of APPCB [connectivity is not possible to APPCE for dissemination of information | website in view of the Serurity and Satety of to the public the areas because af the Maversents through Part.
LONG TERM MEASURES:
i Dismantii ing and rcecomstruction | Nut camplied. a? West Quay berthe be. from | yp management has informed that it is aot pars af WO-Z to WQS for] seonomical to reechanize the fawer draft haraling 14.50 om draft vessels | perths fike WOQ-2 to Wi4 in view of with f fully mechanized bandlin he shikting of dusty EREEOS ee) bigher drakk facilities fer handling OulK | vessels WO-5 berth is folly m echaniz zed and CaP ROCs, l ouersted by PPP operator. VPP informed | tharthey planned ta handle most of the coal and other dusty cargos at higher draft berths ifke WO-7, Wi which will be praposed | to mechanized PPP made by i apd of 2028, 2 EG-5 and EQ-6 berths Not Complie d. VPP mot machanived B)-4 banding 14.80 mi draft ve and ED-& so far and they have sat with fnlly yaechanized handing | submitted any action plan.

i for harding ho th.

cargos. Mechanization af carga | handling at &O6 berth, 3 | Replacement of existing FQ-2 to | Nor complied. €Q-5 berths to cater 'to VASO Bt WEP infarmed that dey have dropped plan trait vessels with folly oro mechanige EG-2 to BOSS as it is not jyechanized hands ng facies | commercially vistle and decided te operate far handling tadk cargos in immer | with semi mechaniaation by de "ploving t the arbour of Vis akhapatnarn Pork harbor mobile cranes by Heading only duet free carge like fertilizers, fond grains, hanged caren, Ereel granike ete., a Development of West Guay! At present, M/s. VET handling the farge in North (WO? & WO-3) berth with yaechanized handing facilities fer handling bulk ORE SOS send mechanized rare atwi = propased te mechanization of thace berths 2023.

abe WOR? & WO-S complete by the the gy id af wuplanes states order dt: 02.03.202 apatnam Port Trust vide Sineckions Compliance S.Nea.

M/s. VPT shall install MDSS at all dusty carge areas within 6 3anths, Not Compiled. There are MYSSS systems at Woe aren, i) Sd area, i) L-TY area and iv} HS - RS ares. M/s.VPT is storing the dusty cargo ie, cea) carfe near to city interface at R-2, Red. & R-S, AOR yards at TM Office, The facility pas provided 27 sprees | ab RZ to RS area, Th sr lers Godown area, 3 _ panes at ot Carner at WOR, 22 sprinklers at NE yard area ard 14 noe. "of aprinklers provided at aid. POY Godown. The fartiby infurrned that they proposed ta imetail MGASS at € more areas vie, LY area, OUppusizs TM Ofce, Near MG ate art along Coast Guard Office Road with sa estimated cost of Reade Crores is proposed ane axprsctedd to he caniglered by fune-2822, The facility suppose ta start the construction of 2 cave red at torage sheds of sige 20fim »4din s lf mand 260 yo «S0n x LY at RO-RO areas for s ing the dusty cares from 30 LM2OZ8. M ' submitted that they proposed ts OE covered storage shed of size 400 mts A 40 ois X LP ote at Rid area fer ot oving the he dusty carga with an estiwatcal cost of Rs.28.61 crores and issued e-procurement petice feviting tender! oN OD SQOS.2022. The period a i of the wark 'a4 ar is Ne months, fhe facility &ae infermed that the finalization af the tender will be completed f UZi and they axpactetd date of competion of werk is 203.2022.

ts t an pear the warler conmmitted action plan M/s. VeT gSippose ta comyfeke the construction of covered storage shed before, 32.08.2041, whereas, M/s ¥PT isaued natiication recently on Therefore the facility has not complied with the Board direction within stipulated COYNE, M/s ¥PP shall remove dusty cargo stored near to hablation Rd, Red & R-S, A, & feresdiately where [bere is ne MOSS System.

Nat Foals, AS per Be akon Plan sub he cont § cacking yards proposed te be shifted we the sreae created by the dersolition of sandoned bulidings of port area. AL oressot coal stacks at BR2 to RS areas are propased ta siift to mesvly developed area of 2B.2u0 Se mi tear dock riain gate by dismantling the existing beliding anc another area of about 42,200 sq mi, batt the ansgenwot of S1/s. ¥PT has nat shifted the cond shai "AIRE yards te ) oer Rew eee sgee R2 to RS area and requested to permit to handie coal at RE ho BS ares.

Pex M/s. VET shall subrnit the actlan gan for re-organization af the chisty cargo at different stacking yards within £5 days.

i gubmitted by M/s.

Not: As per the action pian VPT an 25.02.2620, the coal stacking vards will be shifted to the upecombtg apert areas due te denwlition of abandaned buildings of port arta, At gesent coal stacks ab RS te Ro areas are proposed to shill te newly developed area of 28,200 Sq mt near dock. main gate oy disrawntiing the existing building and another area af about 42.200 sq mt, bat t the management of M/s. VPT has not shifte the coal stacking pards to the new proposed location. The facility bas propased tc | construct covered storage shed of sie 400 | ya X 4 ey X70 min K-11 area and expected date of commplarion.of work jg 30,08, 2022.

Complied.

saksalt the action plan for re-creanization af the coal stacking yards which are near to the city interface within M/s ¥PT shall Not ormplied. AS per the action p sdart submitted by M/s. VPT on P5A2 2020, the coal stacking yards will be shifted to the upconling oper areas duc tu demualition of abandoned boildings of port area. AL present coal stacks at RZ to RS areas are propaged to shIR to navely developed aren of 18,200 Sq mi near dock main gate by dismantiog the existing indiding and another area of abou 2 sq mt. The b 4d Lather dusty cargo area near uy city interface is west of ESSAR. The facility has provided MOS systern at M2 to RS area and requested to pernut to handle coal at R2 ta HS area.

Ft Of £ M/s.VPT shall subunit the action plan for mechanization af partly mechanized berths{S nos} and Lather berths.

i ay BO-LG ape:

.
'There are 5 berths in the outer harbour which are mechanized.
are Zi berths in the inner harbour as detailed below:
Rast Deck area: 8O-7 to RD-1G = 10 berths. West Doch area: WQ-1 to WG-8 = = § berths. Wastern Arr GR 4 OR-2 & FB = 3 berths. Out af the shove 21 berths the fol lowing are mechanized,
4) 80-1 eperated by M fs Adaxi.

rated by M fs AVE Intra

6) WG-5 operated by M/s Nalen, VPT informed that £Q-9, £Q-9, WG-h, Wi}? & WO-8 are already operated with sera mecharized syeterm and they dropped the phn to roechanige EQ-2 to EQ-5 as is not | commercially viailie, Hence the | mariagement decided to Handle dust free cargo. Hike ferb s, food grains, bagged cargo, steel, grardte- ete, 50 far they have not | givan any coramitment letter inthis regard. | *% , he port shall handle dust free carga ike fertilizers, foo and bagged Car EO, shan sod FEE ite ad & The faciicy infurraed that they have | dropped plan to mechaize EQ-2 to EQ-5 as | it is ot commercially viable and decided to operate with semi meshanization by deploying the harbar mobile cranes by haedling enly dust free cargo Hke fertilizers, i » s, bagged cargo, steel, granite etc., M/s.VPT shall obtain amendment fir the water COMSETpELON, wastewater generation quantity in the CFG nent tthe rough onlin, M/s VPP shall obtain amermdment for the hazardous waste generation quantities and ity disposal optian in the CFO.

rwas diverted to apply for CF M/s.VPP shall provide dedicated tankers to tie stock yards which are not provided with the MDSS 3 that the entire all be sprinkled once ir fwe Hours.

has provided 15 water tankers to caver yal dusty cargo areas to eprinkie v rater.

MeV? shall install PLC based $5 ah al chishy stacking areas ial repert plementation progress «very roanth to 2G, Visakhapattani and Ha, | Visakhapatnant.

The facity sta: rig dusty cargo af varia HES places M {OS5 § ystems were provided onty & 3 areas- 1) WOR area, 2) B-4 | "~ WL? area & &) R2 to RS area, PLC | t sPLo nese MDSS not vevides unachoning af W M/s. VPP shall complete the balance plantation target af 1.02 lakhe under Green Visakha Frograrp at all the vacant maces ' avafiable in port area by yd as ivf : fe : they have vac a jand oP rogram.

r providing balance J Arial videngraphy fwith che help 7? Photos of the air fation. comiral measures / ain targeulin cavered Henbmibte feo t PPP operators of tarpaulin.

actity pe ureh:

8s 100 & akhe andy ane RE tee Are EMPOR iw 2 as and operat Ors arge from time be a yen" coal x a not procs uy med ane sich is proposed earlier by £ Mya. VEY shall ensure thet ne : af Urea, Seiphur and hosphate wiles ne rs BS through -- trociks my to cover - the cop with tarpaulins anc alsa | osely monitoring by their Security.
daht ss RuThers Stick ened es shall be followed for MIN Rug pleat ess at the jetty while handling Amraonhim Nitrate to prevent contamin ation wth any regctive substanee containing carhonaseous, h ye ne carbohaccoas material and any ather iInccanmpatible roalerial.
dity indarraed that the cargo js being | handled under supervision of # PESO, pool The district crisis eroun formed SHity hag conducted mock . driis on | under MSTINC rues shall mortar and ceview the saiety measures regarding of Animioniaim Nitrate 28 6O4.2021, ereret & SCONRCIOS.

N " 223 120 SCeNSery raeagures fo centro ' the air palintion and chall ensure q PM & PAITG dadyfmonthly and annual average values are within the standard.

aud ensure additional safety :

precantions to be taken by cond acting periodical axmck ris urmier the supervision af e District Crisis Gro VPP shall che aB the | Not complied. The fachiy has igsned work fi atder on OLO7.202U to M/s. NEGRI Hyderabad for "Abr pai apportiaranent atudy far the impact oi on ambient alr quality in & areund port area" aca coat of Bs.63 Jakhe, which is targeted fo be completed by October, 2021. Now the faciliny informed that the audy will be completed by December-Z02 1.
RSSOSSiNENt of
12) The VPT shall comply the directions issued hy the Scared 'from thas to dime os Not complied. Ths APPC B Regional 0 Visakhapatnam snbroltted staus report oe the mon complinnces ty fhe tagh Force, Board Office for takiag farther necesary aokiog, lution and soured | isakhapatnam Port Qperations :
fice, The VPP shall submib the perforce Bank Guarantee of an amxrert of Rs LO Creare tor cempleting all the works required to be done.
TR.
Submitted bank guarantee for 8s.L0 Crore which is valiti up te 31.07 2022. The fsciity bag aisé paid enviroameatal compensation af 8s, LO? crores to APPCB one P4077 2020. we Sorther i is to subst that stations lnder NAAMP ard 3 mer ralions are bod nied ta M/s. Visakl within the vicinizy of SOQ to 750 meter: 8 APPR is DRED, 3; fram port activities. arly THORENS armblent air } tort monitoring. Dat ef TE stati activities Shaions ap arul 2 The amaai average wen, ¥ort a {P Mig} values : PRED urad at 13 locations areas falas: values are expressed In pesos 10 x Laration Sia TSSES TRIN PSRTS TSBEe TGS T Opts T teas TRF Tupi Pane Tanee" No j ANC COLGNYLER ao | $a | Pas S68: $5.7 | 454 0 802 | GAO | SEO | Fea | lane (| HOSTAL) 2 | RINDI go PSTS Dees Soe PS22 Teas Pens Peée f asa Tia f PAR
- go | 98S | BER Pate |b ba4 Peta DELS | 6a7 | 683 aa4 {S62 > ; gO FOO VIP 2 Dasa Sas ear [Sea | we? p Fae pine | ses | goa 4 5 8B S24 5 G59 | 636 | O50 1 728 & RAMRY 68 HAS i yaad { G24 | Tks ft SkS Part activinias comribution le additt + | GRANAPERAM A' eg (era [snr [ons | 94a | ons ia POLIER BARRACKS 68 R61 |) ATI | BRE | SiS | Bad | FS 3 SP Alvasius Schad fess) Rte 1 Sg 328 | PLB 1 76.2 h4 4 ad 869) 882 PSA TP UGR | ORS F Lode & ES Pag i 476 [ RAS | 1S. | GBs f a4 8 7 Bispensars Y :
Note +» The APPCR dex changed the incetios: from ES? Hospital to AKL Colony it the year-sd2@ und all Meds lanuary to Detober, P Aloysias Schaal and The following are the PMig vahtes roonitered fer the peri O21 at Police Barracks, Gnanapurarn Area, Part Area Dispensary, 5 at ST John's Parish Scheol, Al the stations are located within a radius 3 of 200 meters ty 29 5G meters from port operations towards downwind ¥ ward direction, 1 SNe, Ration Standard | fam f Fels > Max | Agrif [ Maw i feue i fale. ) Bug | Sage Gee Name (te RHEL | aper | exe | aper | zoey | gpzy i sez i gage | zeta | agea Hoarty jana i HGO/G0 | 1Sf ) 448 f LRE RT Fd 7S &3 gi 63 Rey Rarrae kes 2 i Guansparam ) UG | Tae U2 t ree : 24s 92 g? Fa Oo bt 7S Area 3 100 / ab 233): 278 ¢ 166 4. 76 FQ 80 a3 FP a 4 SY Aloysius. | 200/80 | E24 1 V1 f Tse Fee RE ee 88 78 FY ee Schou Su SY dotin's UA oh is2 {28 { 163 PF 6F Os 98 488 83 93 Barish seheal As per the above air quality data, the reonthly average PMr values a" hon vey standare of 100 pe /Nm* and eseeeding the annual standard of 80 ne/t ter Sugust-2021 to Geroher-202 1.

As per the directions of AF. Pollution Central Board, M/s. Visakhapate: am Port trast has installed 3 CAAGM stations incated at R & § Ares, (0B area aad at GYMC stadium. The folowing are the monthly averages fer the last three rants, Manth Lacation GYMC Stadiuns GCS ares R&D YARD Parameter PMs PBye PMs BM cg Pos PM Standard eM GO/AU TDG F 6OYSO LOS eDYAO | 100/60 {24 Hourly? Aparal Aug 20a) 23.82 be 26.23 2.16 Sepreeg2t 24.73 S789 24.58 28.54 55.92 Cet 2021 2409 Be? 1 33.20 33.05 S20 Note: all values are expressed in ug ym As per the above air quality data, the monthly average PMyo values are within the the 24 hourly standard of 100 pe/NreS and excesding the 3 cnnoal standard of 60 pe /NreS ead during the quarter Aug 2027 te Ock- 2021. Qhservations and Semarke:

4. There are MDSS syshems at TP WO area, | us Noo? area, M/s VPP is storing the dusty Cargo Le., eal carge near ta a city interface af R-2, R-A & B-5, AO ac TM Office. There is no MDSS 8 at A. B vards at TM Office. The tachi 3g ont wetting throagh mobile water tankers at A, B at TM ONice.

area, HO LT? area and iv} Ha - RS M/a¥PT has provided 11 sprinklers at TINA Gadown area, 8 sprinklers at NorthWest Carner at WER, 22 Sorinkfers at NH yard area and 14 au, of sprinklers prowice af atald PCL Gadown. The port has proposed to install MBSS at 4 more areas viz. LY area, Cpposite TM Office, Near MG Gete and alang Coast Guard Gfice Road at art estimated be cost of Rg.4.42 Crares is praposed and expected tp ed by fune-2022.

ha BS SS % a "$5 foal ye pa © o.

uM red net a3 nee Fey 0% ae pee oes ng ad st] ee _ M/s.¥PT suppose te start the construction of 2 covered sh ' 40rqa x17 mand 200 m x 30m x 1¥im at H6-R8 areas for staring che dnety & caren Foe RG. 2020, Now, M/s. VPT subroitted that they pr opased tp epnstract one covered storage shed of size 400 mts X 40 mts. X 17 miteat Ril area for storing Ute dust a oe arg with an astimeted cost of RS. 28.61 crares and M/s. VPT iesued e-procurement tad 11 y

21. Pherefors the facility has not cavnnlied with the

4. The aver 2 CAAGM shatians metalied by Ma. VPP shows the monthly average FMiy "yale "g aye within the the 24 hourly standard of TiN) pg /Now and of 66 ag/Nee during the quarter Aug-2027 to Oet-

exceeding the arma 2gel.

§. Ag per the APPCE Air Quality Monite sring data, the mumthly average PMyo values are exceeding the daily standard of: > sed Nes' during the perind fanvary- Ao) S021 and within the daily standard of LOG pg/Nmes during the period May- 202%, The average PMjg values are exceeding the annual standard ai GO nef Nr seriod homary- 2084 to ch 202.. &. nat complying with the Heard directions. The APPCR, Regional OMice am suinniited latest s stahis repr on che nent campliances to the Task yes on 15.08 202) fur taking further necessary achon, "the APPCB has 'issued ; meyesd gee . Pe OE Tareas awe ty vide grder db O2 OSU and inmeses t 3 ithe ivhustry has padi Ruvironmants a he period from esh Pollution laint received gh A vecate on >the 2021, ex ile oe : Vp 01.2022 which 12 aed; "od oe os : 1 an ns g os 'ee 4 ER of Fee a mes fee we 4 z oo mB gE a Bors bees [oa Bt ye LG * oa 4 : be 6 BB te a tet Eee ion & ee ay 4 4 s a oo .

" (oa Gat a sy %G wu oe me i G we 4 oa MS SE raat i" tg ae Bee ui A o TA het Sp a % A _ bee z A 5 ye ma & 5 tea, and m & & % oy we ttt Sh fre, ang 4 % a & cm eee wen Cr yon iA oe a nes 3 we 4, end ub aA wy OE pees we ore a is ~ , es ; = on a va Pe fee fo Fad. Sant mn "ee i & * 4 7 fe _ ,_* 4 & Raa Ka Wg rd eat bees pas es @i fom we, a, wm & er Soe Pag y Soe orn, > 2had $ me Sead ww ws " yee bd cel "Ss a ay Soe Ns py ye Nae "oe id £ Z on pee * ee? ca abet re Hh A eee BOK : . y Mee oh ta coe a ee, oh ee on os ws a mm SS xk 45 ree ke ty On ee ae pons S, ost a "23 wn oe te ey ba " *, ge a re " 4y rm trea efee Gf ee w ot oe a go on Bea peaoe oA B ge, Boo tes nd wep re Be bee eS wk bee} 7. en be, at oe pee) Soe ; bey pa 2 os OF oy me ; ay a ¥ 2 CO S £ f, ie & cy, bad 3 S s es ond a a am or rood wt Jee Feed a ae, 3 oA aw Ba i be Sg f es eS cad wm pa _ ok ty ; ee pas "YS ts me ant *¢% ag te oo vont Sh 4 bs wn se Q vr wa ins oe hee be iva) ae as & oes eee, z a wa + ad 554 nto on i we bey = ' y ao per, Sey ia wet . ed Ya Bn # & fe x fe he i & & BY me iio "3 et & & mm w ser, a Sea! Bel tee " en : ' zs : We . Ee ; ;
mm pei 64 ood Food " wot paas GB , eg ed o Sed tod rer ne poe % roe ~ heat re « pes 166 , ed oy be Sha a" ah oe a vee ey % a ee foe ms at. GA ged oe aA w fae eb ws, ven Ww ts, ~ hy fet bet past ce ~ ow wa fy SR yD "te . wine vent Bo% ae S sre u3 £% aad Cr as "a Yb wot, on oy an od Sei meet i casreca SPE tae pf x go Oe i eee we ki es a & fg one wet fe io yO 2 ~ Ga gad OH we ty OM y Bo bt Soy, ae whet ax " , ' bee i wee ER eet le ee FO Bey a) A esi aon RD om os fe Zi yh eee tee wa (BB ey < es a v4 * a 2 A oi Px oe an oo me mf pod he as - ree . wn its Fee} fap a on it Cy ke ; Za rd ; a we Pe , We 4 a Ck aig weed wr aan) cr oS ta : Oe oe : tae 4 . ° Be B rk 4 om SF oa 3 nerd few, 74 Pred ong Net napa, hin Laan ws Eiagl ge "; ve it os i vy . Ga te psa t eo A iad 2 wy S a Bat heirs, ee ae * 0% ry pas bcd & oo a a fe " @ WE a no '¢, ae: Ben z. eet tre haat te, es 4 a pee ' "08 . f we OU Oh ia @ its) 2 on n> ane 7 ¢ } a cr ne te MA SE SN B 5 Ry 4 em % Se : , oy * yes ore, fee gt Me ENS As pees hed gS ' rd re Bom ey fon Ped ee ; 32 be iA Foi TF coed y on ee BR a i" = oy te Ee we " Bs a, lod eee sed oe bod Pon bes rons pea ret) oan on = te q rae Ww = nad we hae ae + nd fy %y iS x ba ae We en oem tes we Fat 2 " oe fat od no ts Ne eG wD uA er uy eh ee Se Aas oR oo OS EE CP a FE Sn ben m Be 13 9% SOREL vw Fe th CHAPRE bo reecl xy 14 iP ty REx y.

FE é ut AY bees v3 Cy x ABBE é te 15 poscesneasenes * , i a SS a veenee 7 as :

Te he i or % : _ oes oe Ss ; oe de ° he ag tong Mat ns 2 '3 bee is " ee vet a oi ae my oo ox ay i $1 4 "7 'a nas vad & Soe on 3 e ; i es A ae > ion whe ai
-

Bd pe es va - "hes , ao 85 "fe ox oad aes: oa iR iad ys a ick a, 05 ay Sag oh trl aa ¥ : we | 2 baw & a : oe ors ' lee ~ 3 Peas, od : ed cod : a me i tet we "ee t Ls '" ae het 3 i 2 :

nti wh :
the :
% .
% wie pa DB te wh :
cA oy pe hay :
a i : ooh Lu te sty 350 g pr oer Ay he 2E>) bet RL Cov OOveLr pee PY, PEPVETAL 2 17 ibmitted that he is newly appointed a coursel "f
6. The counsel appeatiy he report subm itted by the Andhra Pradesh ection to t 1 some to file their ob Pollution Control Board (APPCB) and also he wanted to file a separate lf apart from itse their objection to the report submitted by the Andhra Pradesh Pollution compliance report filed by the Visakhapatnam Port Trust Control Board (APPCB) ime can be granted to the ing the circumstances, we feel that some t
7. Consider Visakhapatnam Port Trust to submit their objection to the committee report 18 and also compliance report according to them _ regarding the recommendations made and they are directed to file the same on or before 25.02.2022 by e-filing in the form of searchable PDF/OCR Supportable PDF and not in the form of Image PDF along with necessary hardcopies to be produced as per rules.
8. The Registry is directed to communicate this order to the official respondents through e-mail immediately for their.information and for compliance of the direction.

_(D8°Satyagopal Korlapati) O. A. No.68/2015, (SZ) 01.02.2022,5r.

19