Section 191(d) in U.P. Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules, 2009
(d)such casing and bracing are provided to a shaft at an excavation or tunneling work upto the depth of such shaft at an excavation or tunneling work according to the appropriate design for such casing and bracing;