Supreme Court - Daily Orders

Apex Heights Pvt. Ltd vs Ram Kishor Arora on 5 February, 2026

                                       IN THE SUPREME COURT OF INDIA
                                        CIVIL APPELLATE JURISDICTION

                                       CIVIL APPEAL NO. 2626 OF 2025

       APEX HEIGHTS PVT. LTD.                                                APPELLANT(S)
                                                    VERSUS
       RAM KISHOR ARORA & ANR.                                              RESPONDENT(S)

                                                    WITH

                                       CIVIL APPEAL NO. 2778 OF 2025

                                       CIVIL APPEAL NO. 2662 OF 2025

                                       CIVIL APPEAL NO. 2648 OF 2025

                                       CIVIL APPEAL NO. 3724 OF 2025

                                       CIVIL APPEAL NO. 3952 OF 2025

                                    CIVIL APPEAL NO.             OF 2026
                                  (ARISING OUT OF DIARY NO. 4654 OF 2025)

                                       CIVIL APPEAL NO. 2240 OF 2025

                                       CIVIL APPEAL NO. 3260 OF 2025

                                       CIVIL APPEAL NO. 2627 OF 2025

                                   CIVIL APPEAL NO.              OF 2026
                                  (ARISING OUT OF DIARY NO. 5072 OF 2025)

                                       CIVIL APPEAL NO. 3498 OF 2025

                                       CIVIL APPEAL NO. 2598 OF 2025

                                   CIVIL APPEAL NO.             OF 2026
                                 (ARISING OUT OF DIARY NO. 27385 OF 2025)

                                  CIVIL APPEAL NO.                OF 2026
                                  (ARISING OUT OF DIARY NO. 28909 OF 2025

                                                 O R D E R
Signature Not Verified Digitally signed by

1. NITIN TALREJA Date: 2026.02.10 16:41:55 IST Applications for permission to file appeal(s) are allowed.

Reason:

2. Delay condoned. Leave granted.

1

3. These appeals arise from the judgment dated 12.12.2024 passed by the National Company Law Appellate Tribunal (for short, “NCLAT”), Principal Bench, New Delhi. The aforesaid order was passed in an interim application in Company Appeal (AT)(INS) No.406/2022, which in turn, was directed against the order dated 25.03.2022 of the National Company Law Tribunal (for short, “NCLT”), New Delhi, while admitting an application under Section 7 of the Insolvency and Bankruptcy Code, 2016 (for short, the “IBC”) filed by the Union Bank of India against the corporate debtor, namely, M/s. Supertech Limited.

4. To briefly set out the factual backdrop of these appeals, the corporate debtor, M/s. Supertech Limited, is a real estate company engaged in the construction of various housing and certain commercial projects in Noida, Greater Noida, Yamuna Expressway and Gurugram, among others. The projects were launched in different years, mostly between 2010 and 2012. As the projects could not be completed, the commitment to various financial creditors was also not honoured, and one of the financial creditors, namely the Union Bank of India, initiated Section 7 proceedings under the IBC. The insolvency application having been admitted, the order of admission was challenged in an appeal before the NCLAT.

5. For the limited purpose of disposal of these matters, it may be noted that the controversy revolves around non-completion of the following 16 projects by M/s. Supertech Limited:

(i) Sports Village, Greater Noida.
     (ii)        Hilltown, Gurugram.
     (iii)       Romano, Noida.
     (iv)        Rivercrest, Rudrapur, Uttarakhand.
     (v)         Meerut Sports City, Meerut.

                                            2
       (vi)       Green Village, Meerut.
       (vii)      Eco Village-3, Greater Noida.
       (viii)     UP Country, Greater Noida.
       (ix)       Eco Village-2, Greater Noida.
       (x)        Araville, Gurugram.
       (xi)       Micasa, Bengaluru.
       (xii)      Czar Suits, Greater Noida.
       (xiii)     Eco-Citi, Noida.
       (xiv)      Eco Village-1, Greater Noida.
       (xv)       Capetown, Noida.
       (xvi)      North Eye, Noida.

6. Though, according to the principal appellant (management of M/s. Supertech Limited), the total residential units in these projects were approximately 40,000, learned counsel for the home buyers, however, submits that the number of such units was over 51,000. It is also asserted before us that prior to the commencement of the insolvency proceedings in the year 2022, certain units had been completed and handed over to the allottees, whereas some more units have been completed and transferred to the allottees during the pendency of these appeals before this Court, whereupon the impugned order of NCLAT came to be stayed vide order dated 21.02.2025.
7. In the appeal(s) before the NCLAT, IA No.6557/2024 was seemingly argued at length with a view to explore the mechanism for completion of 16 subject projects (except Doon Square). It seems that the desperate home buyers who have been endlessly waiting for over two decades have either contacted and/or suggested that NBCC India Ltd. be engaged to complete the pending projects. It further appears that the project management consultant and the Interim Resolution Professional (IRP), after due deliberations with NBCC, also supported the plight of the home buyers. This consequently 3 led the NCLAT to issue various comprehensive directions in this regard, as set out in paragraph 85 of the impugned judgment. Some of the salient features of these directions are as follows:
“(1) Under TOR, paragraph 1.4 (c) Note; the Condition-I is satisfied on passing of this order. Conditions II, II V, VI be completed by all concern on or before 31.03.2025. The NBCC shall start process of award of work as per Condition-IV, prior to 31.03.2025 and complete the award of contract within one month thereafter and construction shall commence w.e.f. 01.05.2025.

(2) The statutory Authorities whose sanction is required for renewal/grant of building plan and other necessary sanctions, registration/renewal of Projects state, consider and communicate their decisions within 30 days of IRP making requisite applications.

(3) The NBCC (I) Ltd. cannot be allowed exemption from complying statutory requirements under different statutes regulating building regulations and RERA Act 2016.

(4) The Homebuyers/commercial unit holders, who have already been allotted units by the Corporate Debtor, which allotments are subsisting, shall not be subjected to any escalation of cost, except the dues which are required to be paid by them as per Builder Buyers Agreements.

(5) The purpose of NBCC for distribution of surplus as contained in Paragraph a(x) of TOR is not approved. Repayment of land Authorities, Banks and Financial Institutions shall simultaneously begin as per the date and manner decided by Apex Court Committee. The balance amount in a Project apart from 70% amount which is to be used for construction, may be used for repayment. The payment for land cost can also be debited from 70% amount as per Section 4(2)(D) of RERA Act and as per the decision of the Apex Court Committee. Any proposal for repayment of land Authorities, Banks and Financial Institutions emanating from the Project Court Committee shall require approval of Apex Court Committee for implementation.

(6) We direct for constitution of an Apex Court Committee and Project-wise Court Committee for each Project as detailed in Paragraph 78 of this order. The above Court Committees be constituted in the manner as noted in paragraph 78 and shall perform their functions as noted in paragraph 78. In the Project-wise Court Committee, 4 NBCC (1) Ltd. shall also nominate one Member in each Project-wise Court Committee, who will be added in that Committee. After completion of constitution of Apex Court Committee and Project-wise Court Committee, IRP shall upload the constitution of Committees on the website as early as possible. The suggestions of IRP regarding constitution and functioning of above Committee is approved, subject to modification as noted above.

(7) The suggestions of IRP under Heading "B. Directions to NBCC for Implementation of construction Proposal and Mechanism for repayment of dues of stakeholders" as noted above in paragraph 79 of the order are approved.

8) The Apex Court Committee is empowered to take decision for transferring surplus amount from one Project to other Project after obtaining necessary details from concerned Project-wise Court Committee.

(9) Project-wise account be maintained in which all receivables from the concerned Project be deposited and account can be debited only with the approval of Project- wise Committee/Apex Court Committee. The accounts shall be operated by joint signatories, i.e. IRP and one nominee of NBCC (I) Ltd.

(10) A separate account, in the name of "NBCC (I) Ltd. - Supertech Unfinished Project" as suggested by NBCC shall be opened and operated by NBCC through its authorised signatories with joint signature of IRP. All funding and finance received by the NBCC/ Apex Court Committee for completion of the Project shall be credited in the above designated account. The above account shall be under direction and control of Apex Court Committee.

(11) NBCC shall obtain necessary finance of Rs.100 crores as suggested and deposit in the above designated account to be spent as per decision of Apex Court Committee for carrying out the Project.

(12) In reference to TOR as suggested by NBCC regarding its fee of 8% as PMC Fee, we are of the view that marketing fee of 1% as suggested shall be included in 8% fee and no separate marketing fee shall be chargeable.

(13) Directions sought for by IRP as suggested under Heading "C. Directions to various stakeholders, Lenders, Land Authorities, Promoters" are approved insofar as "C.1, С.2, C.3, C.4" are concerned (As noted in paragraphs 80, 81 and 82 of this order).

(14) The TOR as contained in IA No.6557 of 2024 (NBCC (I) Ltd. Application) as modified by revised proposal dated 5 11.11.2024 stand approved, subject to directions and modifications as contained in this order.”

8. As per the material on record, after these directions were issued, some operational creditors sought a modification of the above-stated order to include their claims as well. The NCLAT, vide an order dated 18.03.2025, declined to pass any order on the merits of the operational creditors’ claim, in light of the fact that this Court had meanwhile stayed the operation of the judgment dated 12.12.2024. This is how certain appeals in this batch are directed against a subsequent order dated 18.03.2025.

9. We have heard Mr. Shyam Divan, learned senior counsel and other learned senior counsel/counsel on behalf of the appellants, who have vehemently urged that NCLAT exceeded its jurisdiction by impleading a third-party entity, namely, NBCC, for the completion of projects. It is their case that the statutory scheme under IBC does not give NCLAT the power to entrust the project to a third-

party entity without the consent of the original project proponent and the creditors. Their principal contention, however, is that as of now, almost 25,000 housing units have been handed over to the allottees, and if given some more time, the remaining approximately 20,000 units shall also be completed and allotted to the remaining home buyers.

10. Per Contra, learned counsel for the home buyers, who are still awaiting possession of the units, vehemently opposed the prayer and the suggestions made on behalf of M/S. Supertech Limited. All these home buyers reiterate their submission that NCLAT rightly brought in NBCC as an alternative developer to complete projects 6 that have remained at a state of standstill for decades. We may, however, hasten to add that there is another group of home buyers, presumably those who have obtained allotment/possession of units and oppose the assignment of responsibility for project completion to the NBCC. There are other contesting respondents, namely, the statutory authorities like Noida Authority, Greater Noida Industrial Development Authority, and Yamuna Expressway Industrial Development Authority, who are also aggrieved by the order of the NCLAT as their dues as per the original terms and conditions of allotment have not been paid and in some of the cases, which led to the cancellation of the lease.

11. Mr. Raju Ramachandran, learned senior counsel and some other learned senior counsel/counsel representing the consortium of banks fairly submit that though they had supported the proposal of bringing NBCC for completion of the projects before the NCLAT, however, during pendency of these proceedings, a one-time settlement has been proposed by M/s. Supertech Limited, which they find may ultimately have a better outcome in comparison to what was proposed or projected to be paid to them under the order passed by the NCLAT.

12. A somewhat similar stance has been taken by statutory authorities such as the Noida Authority and the Greater Noida Industrial Development Authority.

13. On the other hand, Mr. Ranjit Kumar, learned senior counsel appearing for Yamuna Expressway Industrial Development Authority, submits that since the lease of the allotment and lease in respect of the land meant for commercial and institutional projects has 7 been cancelled, the said authority is entitled for return of the land earmarked for these projects and undertakes to develop those projects on its own.

14. We have considered the rival submissions and perused the relevant record with the able assistance of the learned senior counsel/counsel for the respective parties.

15. The primary consideration before the NCLAT and this Court is to protect the interests of home buyers and ensure they can secure a modicum of shelter comprising the residential unit for which they have been eagerly waiting for more than two decades. Their hard-

earned money has been emptied into the coffers of M/s. Supertech Limited, a substantial part of which appears to have unfortunately been misutilised. If that is the central consideration, it goes without saying that the other competing claims of secured creditors, operational creditors or the land owners, including Noida, Greater Noida, and Yamuna Expressway, will have to be, for the time being, considered secondary. Once the predominantly completed projects, namely residential units, are handed over to each allottee along with all basic amenities such as sewage, water supply, electricity, road access, parks, and other facilities as committed by the developer, the surplus amount can then be distributed among the other claimants using the pari passu principle or any other mechanism deemed fair and equitable by the NCLAT/NCLT, as the case may be. Such a recourse adopted by the NCLAT does not warrant any interference by this Court, especially when any equitable, fair, and transparent judicial order, which rightly deserves protection under the umbrella of Article 142 of 8 the Constitution, is in place, given the peculiar facts and circumstances of this case.

16. Having observed so, we find that the order passed by the NCLAT in bringing NBCC on record for completion of the pending projects, per se, is neither unfair nor contrary to any express provision of the IBC. As noted earlier, the projects are intended for home buyers and having found that their projects remain incomplete for an indefinite period, they approached NBCC and/or suggested that a Government of India entity be brought into the picture to complete these 16 pending projects.

17. NBCC is represented before us by its learned senior counsel, who have given an assurance that all pending works shall be undertaken on a war footing and that the projects shall be completed within the stipulated timeline. We, thus, direct the NBCC to deploy its resources to ensure the pending projects are completed within the prescribed timeline. The Apex Committee constituted by NCLAT will also provide the requisite aid and assistance to NBCC to complete the projects.

18. At this stage, we may hasten to add that the completion of residential projects and entrustment of the allotted units to the home buyers will not cause any prejudice to the claims of Noida Authority, Greater Noida Industrial Development Authority, Yamuna Expressway Industrial Development Authority or any other housing authority or even the creditors, including the operational creditors. Those claims will be determined by the Tribunal in due course, taking into account the prevailing circumstances, and all claims of the home buyers will be settled.

9

19. To ensure there is no impediment to the completion of the housing projects, it is directed that no Tribunal or Court, including the High Court, shall pass any interim order or directions stopping any project from being commenced by NBCC. If there is any grievance by any entity, they shall, however, be at liberty to approach this Court for appropriate direction.

20. In order for smooth compliance of the directions issued by the NCLAT along with those directions issued hereinabove and with a view to assist the Tribunal besides monitoring/supervision of the ongoing projects, we have requested Mr. Rajiv Jain, learned senior counsel along with Mr. Amarendra Kumar, learned counsel (Mob.-

8797870797) to assist the Tribunal as Amicus Curiae and submit their valuable recommendations/opinions to the Apex Committee or the Tribunal, as the case may be. In the event any other impediment arises in compliance with the directions, the learned Amicus Curiae shall be at liberty to seek further clarification from this Court.

21. The honorarium payable to the learned Amicus Curiae shall be in terms of the order dated 02.12.2025 passed in W.P. (Civil) No. 160 of 2024, and the fee payable to Mr. Amarendra Kumar, learned assisting counsel, is fixed at Rs. 1,00,000/- (Rupees One Lakh only) per month.

22. In view of the foregoing discussion, we do not find any merit in these appeals, which are accordingly dismissed. The impugned order of the NCLAT is upheld, except to the extent it has been modified/clarified hereinabove. Ordered accordingly.

10

23. It goes without saying that the directions issued by the NCLAT in the impugned order to the statutory authorities shall be complied with within a period of four weeks, and if such sanction/permission has expired, the same shall be renewed/revived within the above-stated period.

24. Alongside the residential projects, the integrated non-

residential projects shall also be entrusted and completed by NBCC and not by M/s. Supertech Limited. If there is any issue with respect to the assessment of the allotment price or disposal of such non-residential project, commercial units, etc., the concerned parties may submit their respective claims to the learned Amicus Curiae, who shall make the recommendations to the Apex Committee/Tribunal for adjudication thereof.

25. We are also cognizant of the fact that NBCC had serious objections to certain terms and conditions imposed by the NCLAT in the impugned order, and it is highlighted that while negotiating with the home buyers or the IRP, the NBCC did not agree to conditions that would ultimately render its proposal unviable. In this regard, we do not express any opinion; however, we grant NBCC the liberty to move an application before NCLAT and may seek clarification.

26. During the hearing, it was also pointed out that several IAs have been filed by home buyers, etc., in respect of projects other than the 16 projects that are the subject matter of these appeals.

All these applications are disposed of with liberty to the applicant(s)/home buyers/other interest holders to approach the 11 NCLT/NCLAT in the pending proceedings and seek appropriate directions.

..........................CJI (SURYA KANT) ..........................J. (JOYMALYA BAGCHI) NEW DELHI;

FEBRUARY 05, 2026.





                                    12
ITEM NO.18                COURT NO.1                  SECTION XVII-B

               S U P R E M E C O U R T O F     I N D I A
                       RECORD OF PROCEEDINGS

                  Civil Appeal   No(s).   2626/2025

APEX HEIGHTS PVT. LTD.                                Appellant(s)

                                 VERSUS

RAM KISHOR ARORA & ANR.                               Respondent(s)

(IA No. 17425/2026 - APPOINTMENT OF AMICUS CURIE/FREE LEGAL AID, IA No. 72749/2025 - APPROPRIATE ORDERS/DIRECTIONS, IA No. 108815/2025

- APPROPRIATE ORDERS/DIRECTIONS, IA No. 24667/2026 - APPROPRIATE ORDERS/DIRECTIONS, IA No. 95488/2025 - APPROPRIATE ORDERS/ DIRECTIONS, IA No. 86947/2025 - APPROPRIATE ORDERS/DIRECTIONS, IA No. 18438/2026 - APPROPRIATE ORDERS/DIRECTIONS, IA No. 44221/2025 - EX-PARTE STAY, IA No. 44223/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT, IA No. 333743/2025 - INTERVENTION APPLICATION, IA No. 18400/2026 - INTERVENTION APPLICATION, IA No. 83932/2025 - INTERVENTION/IMPLEADMENT, IA No. 82719/2025 - INTERVENTION/ IMPLEADMENT, IA No. 273469/2025 - INTERVENTION/IMPLEADMENT, IA No. 117526/2025 - INTERVENTION/IMPLEADMENT, IA No. 24384/2026 - INTERVENTION/IMPLEADMENT, IA No. 86925/2025 - INTERVENTION/ IMPLEADMENT, IA No. 52525/2025 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/FACTS/ ANNEXURES and IA No. 44222/2025 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/FACTS/ ANNEXURES) WITH MA No. 1847/2022 in C.A. No. 5041/2021 (III-A) (IA No. 149701/2022 - APPLICATION FOR PERMISSION) CONMT.PET.(C) No. 737/2022 in C.A. No. 5041/2021 (III-A) Diary No(s). 4120/2023 (III-A) (IA No. 20233/2023 - CONDONATION OF DELAY IN FILING, IA No. 20234/2023 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) CONMT.PET.(C) No. 623/2023 (III-A) CONMT.PET.(C) No. 624/2023 (III-A) CONMT.PET.(C) No. 753/2023 in C.A. No. 5041/2021 (III-A) Diary No(s). 8749/2023 (III-A) (IA No. 44814/2023 - CONDONATION OF DELAY IN FILING, IA No. 44812/2023 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) CONMT.PET.(C) No. 754/2023 (III-A) (IA No. 46738/2023 - EXEMPTION FROM FILING PAPER BOOKS, IA No. 13 261167/2023 - PERMISSION TO FILE APPLICATION FOR DIRECTION and IA No. 46716/2023 - PERMISSION TO FILE APPLICATION FOR DIRECTION) CONMT.PET.(C) No. 847/2023 in C.A. No. 5041/2021 (III-A) CONMT.PET.(C) No. 955/2023 in C.A. No. 5041/2021 (III-A) CONMT.PET.(C) No. 956/2023 in C.A. No. 5041/2021 (III-A) CONMT.PET.(C) No. 1011/2023 in C.A. No. 5041/2021 (III-A) (IA No. 100954/2023 - APPLICATION FOR PERMISSION and IA No. 100945/2023 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) CONMT.PET.(C) No. 1012/2023 in C.A. No. 5041/2021 (III-A) (IA No. 100974/2023 - APPLICATION FOR PERMISSION and IA No. 100966/2023 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) CONMT.PET.(C) No. 1061/2023 in C.A. No. 5041/2021 (III-A) Diary No(s). 28143/2023 (III-A) (IA No. 221274/2023 - APPLICATION FOR PERMISSION) Diary No(s). 33747/2023 (III-A) (IA No. 164074/2023 - EXEMPTION FROM FILING O.T.) Diary No(s). 53812/2023 (III-A) (IA No. 985/2024 - CONDONATION OF DELAY IN FILING, IA No. 982/2024

- EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT and IA No. 53036/2024 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/FACTS/ ANNEXURES) Diary No(s). 17416/2024 (III-A) (IA No. 190455/2024 - CONDONATION OF DELAY IN FILING) Diary No(s). 25613/2024 (III-A) (IA No. 128703/2024 - CONDONATION OF DELAY IN FILING) Diary No(s). 44907/2024 (III-A) (IA No. 5941/2025 - APPLICATION FOR PERMISSION, IA No. 224284/2024

- APPLICATION FOR PERMISSION, IA No. 224286/2024 - APPROPRIATE ORDERS/DIRECTIONS, IA No. 275772/2024 - CONDONATION OF DELAY IN FILING and IA No. 5945/2025 - INTERVENTION/IMPLEADMENT) CONMT.PET.(C) No. 257/2025 in C.A. No. 5041/2021 (III-A) (IA No. 246523/2024 - EXEMPTION FROM FILING SPARE COPIES) Diary No(s). 53382/2024 (III-A) (IA No. 264932/2024 - APPLICATION FOR PERMISSION, IA No. 16318/2025

- CONDONATION OF DELAY IN FILING and IA No. 264930/2024 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) Diary No(s). 56159/2024 (III-A) (IA No. 279004/2024 - APPLICATION FOR PERMISSION, IA No. 16320/2025 14

- CONDONATION OF DELAY IN FILING and IA No. 279000/2024 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) C.A. No. 2778/2025 (XVII-B) (IA No. 48216/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) C.A. No. 2662/2025 (XVII-B) (IA No. 45812/2025 - EX-PARTE STAY and IA No. 45815/2025 - PERMISSION TO FILE ADDITIONAL DOCUMENTS/FACTS/ANNEXURES) C.A. No. 2648/2025 (XVII-B) (IA No. 45412/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) C.A. No. 3724/2025 (XVII-B) (IA No. 35999/2025 - EX-PARTE STAY and IA No. 36001/2025 - EXEMPTION FROM FILING O.T.) C.A. No. 3952/2025 (XVII-B) (IA No. 54678/2025 - STAY APPLICATION) Diary No(s). 4654/2025 (XVII-B) (IA No. 45480/2025 - EX-PARTE STAY, IA No. 45481/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT and IA No. 45478/2025 – PERMISSION TO FILE APPEAL) C.A. No. 2240/2025 (XVII-B) C.A. No. 3260/2025 (XVII-B) (IA No. 45186/2025 - EX-PARTE STAY and IA No. 44986/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) C.A. No. 2627/2025 (XVII-B) (IA No. 44228/2025 - EX-PARTE STAY, IA No. 44229/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT) Diary No(s). 5072/2025 (XVII-B) (IA No. 100972/2025 - CONDONATION OF DELAY IN REFILING/CURING THE DEFECTS, IA No. 100965/2025 - EX-PARTE STAY, IA No. 100966/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT and IA No. 100969/2025 - PERMISSION TO FILE APPEAL) C.A. No. 3498/2025 (XVII-B) C.A. No. 2598/2025 (XVII-B) Diary No(s). 27385/2025 (XVII-B) (IA No. 186532/2025 - CONDONATION OF DELAY IN REFILING/CURING THE DEFECTS, IA No. 186528/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT and IA No. 186531/2025 - EXEMPTION FROM FILING O.T.) 15 Diary No(s). 28909/2025 (XVII-B) (IA No. 165645/2025 - EXEMPTION FROM FILING C/C OF THE IMPUGNED JUDGMENT, IA NO. 165646/2025 - CONDONATION OF DELAY IN FILING and IA No. 165647/2025 - CONDONATION OF DELAY IN REFILING/CURING THE DEFECTS) Date : 05-02-2026 These matters were called on for hearing today.

CORAM : HON'BLE THE CHIEF JUSTICE HON'BLE MR. JUSTICE JOYMALYA BAGCHI For Appellant(s) : Mrs. Archana Pathak Dave Ld. ASG Ms. Manisha Ambwani, AOR Mr. Gudipati Gayatri Kashyap, Adv. Mrs. Apoorva Pandey, Adv.

Mr. Rose Verma, Adv.

Mr. Rahul Yadav, Adv.

Mr. Ronvijay Gohain, Adv.

Ms. Anam Ahmad, Adv.

Ms. Mansi Jaiswal, Adv.

Mr. Krishnamohan K., AOR Mr. Chaitanyashil Priyadarshi, Adv. Ms. Priya, Adv.

Mr. Rajeev Singh, Adv.

Mr. Samant Singh, Adv.

Ms. Anu H Kirutthika, Adv.

Mr. Rohit Singh, Adv.

Mr. Rajeev Singh, AOR Mr. Amit Pawan, AOR Mr. R. Chandrachud, AOR Mr. K Parameshwar, Sr. Adv.

Mr. Akash Chatterjee, AOR Mr. Palash Singhai, AOR M/S. Legal Options, AOR Ms. Kanchan Yadav, Adv.

Ms. Sonia Dube, Adv.

Ms. Saumya Sharma, Adv.

Mr. Tanishq Sharma, Adv.

Mr. Narendra Hooda, Sr. Adv.

Mr. Lokesh Malik, Adv.

Ms. Atika Chaturvedi, Adv.

Mr. Shubham Jain, AOR Mr. Sanjay Kumar Yadav, Adv.

Mr. Prithvi Pal, AOR 16 Mr. Bhupinder Yadav, Adv.

Mr. Neeraj, Adv.

Mr. Manoj Jain, Adv.

Ms. Rupa Rani, Adv.

Mr. Ritwik Parikh, AOR Mr. Rajat K. Mittal, Adv.

Ms. Heena Khatun, Adv.

Ms. Kritika, Adv.

Mr. Shashank Shekhar, AOR Mr. Ranjit Kumar, Sr. Adv.

Mr. Amar Gupta, Adv.

Mr. Divyam Agarwal, AOR Mr. Mohit Sharma, Adv.

Mr. Anirudh Vats, Adv.

Mr. Sanjeev Sagar, Sr. Adv.

Mr. Rishabh Malik, Adv.

Ms. Jaspreet Gogia, AOR Ms. Iptisha, Adv.

Mr. Tushar Mehta, Solicitor General Mr. Sameer Jain, Adv.

Mr. Suvigya Awasthy, Adv.

Mr. Vivek Joshi, Adv.

Mr. Deepesh Raj, Adv.

Ms. Sanya Gagar, Adv.

Mr. Yash More, Adv.

Mr. Soayib Qureshi, AOR Mr. Rudreshwar Singh, Sr. Adv.

Mr. Sumit Srivaastava, AOR Mr. Karmveer, Adv.

Mr. Kumar Abhishek, Adv.

Mr. Neeraj Kishan Kaul, Sr. Adv.

Mr. Ramji Srinivasan, Sr. Adv.

Mr. Nikhil Mehndiratta, Adv.

Ms. Nidhisha Choksi, Adv.

Mr. Amrit Bhatia, Adv.

Mr. Arjun Bhatia, Adv.

M/S. Dua Associates, AOR Ms. Km Monika, Adv.

Mr. Krishna Kr. Sharma, Adv.

Ms. Munisha Anand, Adv.

Mr. Pankaj Gupta, Adv.

Mr. Vishwa Pal Singh, AOR Mr. Fateh Chand Sharma, Adv.

17

Mr. Pramit Saxena, AOR Mr. Abhishek Kumar Singh, Adv.

Mr. Sriram P., AOR Mr. S Ragasandesh, Adv.

Ms. J Joe Anton Beno, Adv.

Mr. Mukul Rohatgi, Sr. Adv.

Mr. Parag Tripathi, Sr. Adv.

Mr. Shyam Divan, Sr. Adv.

Mr. Mudit Sharma, AOR Ms. Nandini Sharma, Adv.

Mr. Vishal Gosai, Adv.

Mr. Parvez Alam Khan, Adv.

Mr. Kanishk Sachdeva, Adv.

Mr. Ritesh Dhyani, Adv.

Mr. Manish Raghav, AOR Mr. K. Parameshwar, Sr. Adv.

Ms. Prachi Johri, AOR Mr. Dipak Kumar Jena, AOR Mr. Prasanna Kumar Parhi, Adv.

Mr. Pramod Kumar, Adv.

Ms. Smita Kumari, Adv.

Mr. Debasis Bhattacharya, Adv.

Mr. Om Parkash Yadav, Adv.

Ms. Kirti Yadav, Adv.

Mr. Sandip Munian, Adv.

Mr. Ashutosh Singhdeo, Adv.

Mr. Raj Shekhar Jena, Adv.

Mr. Alok Raj, Adv.

Mr. Manish Grewal, Adv.

Mr. Wyomesh Tripathi, Adv.

Mr. Harish Pal, Adv.

Ms. Pragya Mishra, Adv.

Ms. Garima, Adv.

Mr. Aham Saha, Adv.

Mr. Abraham C Mathew, Adv.

Mr. Nishe Rajen Shonker, AOR Mr. Vivek Paul, Adv.

Mr. Shaji J Kodankadath, Adv.

Ms. Shashi Bala, Adv.

Mr. Praveen Chaudhary, Adv.

Mr. Praveen Agrawal, AOR Mr. Vipul Agrawal, AOR Mr. Anshuman Nayak, Adv.

18

Mr. V Giri, Sr. Adv.

Mr. Abhishek Kaushik, Adv.

Mr. Shrirang Bharat Varma, AOR Mr. Anilendra Pandey, AOR Mr. Kamlesh Upadhyay, Adv.

Mr. Ashutosh Gupta, Adv.

Ms. Archna Jain, Adv.

Mr. Sumit Agarwal, Adv.

Mr. Siddharth Agrawal, Adv.

Mr. Yashasvi Sharma, Adv.

Ms. Damini Vishwakarma, Adv.

Mr. Achyut Saxena, Adv.

Ms. Neha Malik, AOR For Respondent(s) : Mr. Sumit Srivaastava, AOR M/S. Khaitan & Co., AOR Mrs. Vanita Bhargava, Adv.

Ms. Vanita Bhargava, Adv.

Mr. Ajay Bhargava, Adv.

Ms. Wamika Trehan, Adv.

Mr. Siddhant Kumar, Adv.

Mr. Dinesh Kumar Garg, AOR Mrs. Archana Pathak Dave Ld. Asg Ms. Manisha Ambwani, AOR Mr. Gudipati Gayatri Kashyap, Adv. Ms. Apoorva Pandey, Adv.

Mr. Rose Verma, Adv.

Mr. Rahul Yadav, Adv.

Ms. Mansi Jaiswal, Adv.

Mr. Ranvijay Gohain, Adv.

Ms. Anam Ahmad, Adv.

Mr. Krishnamohan K., AOR Mr. Chaitanyashil Priyadarshi, Adv. Ms. Priya, Adv.

Mr. Mareesh Pravir Sahay, AOR Ms. Yaman Verma, Adv.

Ms. Chitra Chanda, Adv.

Mr. Kartik Jindal, Adv.

Mr. Kartik Virmani, Adv.

Mr. Sougat Sinha, AOR Ms. R. Gayathri Manasa, Adv.

Mr. Navneet Kumar, Adv.

Mr. Vishal Majumdar, Adv.

19

Mr. R. Gopalakrishnan, AOR Mr. Nitin Mishra, AOR Mr. Raju Ramachandran, Sr. Adv.

Mr. O. P. Gaggar, AOR Mr. Sachindra Karn, Adv.

Mr. Mohammed Afeef, Adv.

Ms. Shruti Narayan, Adv.

Ms. Nida Khan Salim, Adv.

Mr. Anish Agarwal, AOR Mr. R. Chandrachud, AOR Mr. Rohit Kumar Singh, AOR Mr. Lal Babu Singh, Adv.

Mr. Rana Prashant, Adv.

Mr. Akash Kumar, Adv.

Mr. Mahender Rathour, Adv.

Ms. Niharika Ahluwalia, AOR Mr. Nakul Dewan, Sr. Adv.

Ms. Kanika Singhal, AOR Ms. Deepshikha, Adv.

Mr. Satyender Saharan, Adv.

Ms. Ananya Patwardhan, Adv.

Mr. Bhakti Vardhan Singh, AOR Mr. Rajeev Kumar Dubey, Adv.

Mr. Ashiwan Mishra, Adv.

Ms. Aditi Mishra, Adv.

Mr. Kamlendra Mishra, AOR Mr. Shaurya Sahay, AOR Mr. Aman Jaiswal, Adv.

Mr. Tarun Gupta, AOR Mr. Sunil Kumar Sharma, AOR Mr. Navin Pahwa, Sr. Adv.

Mr. Devansh Srivastava, AOR Mr. Ankit Banati, Adv.

Mr. Saurabh Mishra, Sr. Adv.

Mr. Mohit Arora, AOR Mr. Sunil Mathews, Adv.

Ms. Charu Khandelwal, Adv.

Mr. Arjun Garg, AOR 20 Mr. K. Parameswar, Sr. Adv.

Mr. Rajesh P., AOR Mr. Arpit Dwivedi, Adv.

Ms. Sakshi Kapoor, Adv.

M/S. Khaitan & Co., AOR Mrs. Vanita Bhargava, Adv.

Ms. Vanita Bhargava, Adv.

Mr. Ajay Bhargava, Adv.

Ms. Wamika Trehan, Adv.

Mr. Siddhant Kumar, Adv.

Mr. Ajit Kumar Sinha, Sr. Adv.

Mr. Sanjay M. Nuli, Sr. Adv.

Mr. Govind Jee, AOR Mr. Omanakuttan K K, Adv.

Ms. Rambha Singh, Adv.

Ms. Laiba Arif, Adv.

Ms. Ankur Kumar, Adv.

Ms. Sonal Gupta, AOR Mr. Milan Singh Negi, Adv.

Mr. Nikhil Jha, Adv.

Ms. Sweta Rani, AOR Mr. Sahil Sethi, Adv.

Mr. Samriddh Bindal, Adv.

Mr. Vikash Kumar, Adv.

Ms. Swikriti Singhania, AOR Mr. Abhijeet Sinha, AOR Dr. Sandeep Singh, Adv.

Mr. Vishal Arun Mishra, AOR Mr. Vikrant Rana, Adv.

Mr. Prashant Malik, Adv.

Mr. Ashutosh Rai Sharma, Adv.

Mr. Rohit Sharma, Adv.

Ms. Divya Chaudhary, Adv.

Mr. Krishnamohan K., AOR Mr. Chaitanyashil Priyadarshi, Adv. Ms. Priya, Adv.

Mr. Palash Singhai, AOR Mr. Pawan R Upadhyay, Adv.

Mrs. Sharmila Upadhyay, Adv.

Mr. Sarvjit Pratap Singh, Adv.

Mr. Anmol Wadhwa, Adv.

Ms. Aditi Anup, Adv.

21

M/s Unuc Legal Llp, AOR Mr. Gopal Jha, AOR Mr. Nitish Massey, AOR Mr. Navin Pahwa, Sr. Adv.

Mr. Devansh Srivastava, AOR Mr. Ankit Banati, Adv.

Mr. Kedar Nath Tripathy, AOR Mr. Aditya Narayan Tripathy, Adv.

Mr. Luv Virmani, AOR Mr. Mareesh Pravir Sahay, AOR Ms. Yaman Verma, Adv.

Ms. Chitra Chanda, Adv.

Mr. Kartik Jindal, Adv.

Mr. Kartik Virmani, Adv.

Mrs. Sangeeta Bharti, Adv.

Mr. Kumar Mihir, AOR Mr. Gunjan Sharma, Adv.

Mr. Himanshu Shekhar, AOR Mr. Ml Lahoty, Adv.

Mr. Anchit Sripat, Adv.

Mr. Arvind Kumar, Adv.

Ms. Siddhi Bohra, Adv.

Ms. Aakriti Jain, AOR Mr. Vk Sharma, Adv.

Mr. Shanker Chhabra, Adv.

Mr. Sunil J. Mathews, Adv.

Ms. Ashtami Khatri, Adv.

Ms. Jyoti Chib, Adv.

Ms. Achint Priya, Adv.

Mr. Rajeev Singh, AOR Mr. Venancio D. Costa, Adv.

Ms. Gauri Goel, Adv.

Mr. Faisal Sherwani, AOR Mr. Ajay Bansal, Adv.

Mr. Gaurav Yadav, Adv.

Ms. Veena Bansal, Adv.

Mr. Sourav, Adv.

UPON hearing the counsel the Court made the following 22 O R D E R M.A. No. 1847/2022 in C.A. No. 5041/2021, Diary No(s). 4120/2023, CONMT.PET.(C) No. 623/2023, CONMT.PET.(C) No. 624/2023, CONMT.PET. (C) No. 753/2023 in C.A. No. 5041/2021, Diary No(s). 8749/2023, CONMT.PET.(C) No. 1061/2023 in C.A. No. 5041/2021, Diary No(s). 28143/2023, Diary No(s). 33747/2023, Diary No(s). 53812/2023, Diary No(s). 17416/2024, Diary No(s). 25613/2024, Diary No(s). 44907/2024, CONMT.PET.(C) No. 257/2025 in C.A. No. 5041/2021, Diary No(s). 53382/2024, Diary No(s). 56159/2024, CONMT.PET.(C) No. 737/2022 in C.A. No. 5041/2021, CONMT.PET.(C) No. 754/2023, CONMT.PET.(C) No. 847/2023 in C.A. No. 5041/2021, CONMT.PET.(C) No. 955/2023 in C.A. No. 5041/2021, CONMT.PET.(C) No. 956/2023 in C.A. No. 5041/2021, CONMT.PET.(C) No. 1011/2023 in C.A. No. 5041/2021 and CONMT.PET.(C) No. 1012/2023 in C.A. No. 5041/2021 De-tag these cases from the rest of the matters.

List on 25.03.2026.

Civil Appeal No. 2626 of 2025, Civil Appeal No. 2778 of 2025, Civil Appeal No. 2662 of 2025, Civil Appeal No. 2648 of 2025, Civil Appeal No. 3724 of 2025, Civil Appeal No. 3952 of 2025, Civil Appeal arising out of Diary No. 4654 of 2025, Civil Appeal No. 2240 of 2025, Civil Appeal No. 3260 of 2025, Civil Appeal No. 2627 of 2025, Civil Appeal arising out of Diary No. 5072 of 2025, Civil Appeal No. 3498 of 2025, Civil Appeal No. 2598 of 2025, Civil Appeal arising out of Diary No. 27385 of 2025 and Civil Appeal arising out of Diary No. 28909 of 2025

1. Applications for permission to file appeal(s) are allowed.

2. Delay condoned. Leave granted.

3. The appeals are dismissed in terms of the signed order.

4. Pending application(s), if any, shall stand closed.

(NITIN TALREJA)                                 (MANOJ KUMAR)
ASTT. REGISTRAR-cum-PS                         BRANCH OFFICER

(Signed order is placed on the file) 23