Section 14(6)(a) in Petroleum and Natural Gas Regulatory Board (Determination of Natural Gas Pipeline Tariff) Regulations, 2008
(a)Assessment of the volume of natural gas required as line pack in the natural gas pipeline as and when commissioned shall be as specified in the relevant regulations for technical standards and specifications, including safety standards.