[Cites 0, Cited by 0] [Section 38] [Entire Act]

NCT Delhi - Subsection

Section 38(d) in The Delhi Electricity Supply Code And Performance Standards Regulations, 2007

(d)The meter testing team of the Licensee shall ensure testing with resistive load of sufficient capacity to carry out the testing. The testing of meter shall be done for a minimum consumption of 1 kWh. Optical Scanner shall be used for counting the pulses/revolutions. The meter testing report shall be in the format given in ANNEXE-VII or as approved by the Commission from time to time.