Legal Document View

Unlock Advanced Research with PRISMAI

- Know your Kanoon - Doc Gen Hub - Counter Argument - Case Predict AI - Talk with IK Doc - ...
Upgrade to Premium
[Cites 5, Cited by 407]

Supreme Court of India

Chairman, Board Of Mining Examination ... vs Ramjee on 3 February, 1977

Equivalent citations: 1977 AIR 965, 1977 SCR (2) 904, AIR 1977 SUPREME COURT 965, 1977 2 SCC 256, 1977 2 SCR 904, 34 FACLR 381, 1977 U J (SC) 184

Author: V.R. Krishnaiyer

Bench: V.R. Krishnaiyer, A.C. Gupta

           PETITIONER:
CHAIRMAN, BOARD OF MINING EXAMINATION &ANOTHER

	Vs.

RESPONDENT:
RAMJEE

DATE OF JUDGMENT03/02/1977

BENCH:
KRISHNAIYER, V.R.
BENCH:
KRISHNAIYER, V.R.
GUPTA, A.C.

CITATION:
 1977 AIR  965		  1977 SCR  (2) 904
 1977 SCC  (2) 256
 CITATOR INFO :
 RF	    1981 SC 873	 (72)
 RF	    1987 SC 593	 (24)


ACT:
	Coal Mines Regulations--Regulation 26--Interpretation of.
	    Rules of natural justice---Concept of reasonably  oppor-
	tunity	cannot	be  fitted into a rigid	 mould--Need  for  a
	strict liability---Code for subterranean occupations.



HEADNOTE:
	 Under	regulation 26(1) if, in the opinion of the  Regional
	Inspector,   a	person	to  whom  an  Overman's,   Sirdar's,
	Engine-driver's, Shot-firer's, or Gastesting Certificate has
	been  granted is incompetent or is guilty of  negligence  or
	misconduct  in the performance of his duties, he may,  after
	giving the person an opportunity to give a written  explana-
	tion,  suspend his certificate by an order in  writing.	 U/r
	26(2)  he shall within a week of such suspension report	 the
	fact to the Board together with all connected papers includ-
	ing  the explanation, if any received from the	person	con-
	cerned.	 U/r 26(3) the Board may, after such inquiry  as  it
	thinks fit, either confirm or modify or reduce the period of
	suspension of the certificate, or cancel the certificate.
	The  respondent,  a shot-firer in a colliery,  violated	 the
	provisions  of the Coal Mines Regulations by entrusting	 his
	risky,	technical work to an unauthorised person  which	 re-
	sulted in an accident  injuring	 one  Bhadu.  The   Regional
	Inspector u/r 26(1) gave him an opportunity for an  explana-
	tion  in writing and after considering the materials  before
	him   forwarded	 the  papers  to  the Chairman of the  Board
	together with a recommendation for cancellation of the	cer-
	tificate  under	 Regulation 26(3).  The Board  bestowed	 its
	judgment on the materials gathered which included the delin-
	quent's	 admission, and cancelled the  shot-firing  certifi-
	cate.	The High Court allowed the writ	 petition  assailing
	the orders of cancellation of the licence and held: (1)	 The
	Board  had no jurisdiction since the Regional Inspector	 did
	not  suspend the certificate first before reporting (2)	 The
	Regional  Inspector  had no power to recommend but  only  to
	report and so the Board's order influenced by the  recommen-
	dation was bad in law and (iii) the Board should have  given
	a  fresh opportunity to be heard before cancellation of	 the
	certificate and its absence violated natural justice,  void-
	ing the order.
	Accepting the Court,
	    HELD: (1 ) Law is meant to serve the living and does not
	beat  its abstract wings in the jural void.  Its  functional
	fulfilment  as 'social engineering' depends on	its  scruti-
	nized response to situation, subject-matter and the  complex
	of  realities  which require ordered  control.	 A  holistic
	understanding is simple justice to the meaning of all legis-
	lations.  Fragmentary grasp of rules can, n misfire or	even
	backfire, as in this case. [906 H, 907 A]
	    (2)	 The judicial key to construction is  the  composite
	perception of the daha and the dahi of the provision.  To be
	literal	 in meaning is to see the skin and miss the soul  of
	the Regulation. [909 A-B]
	   (3) Over-judicialisation can be subversive of the justice
	of  the	 law.  To invalidate the Board's order	because	 the
	Regional.  Inspector  did not suspend the certificate  is  a
	fallacy.  The Board's power is independent and is ignited by
	905
	the  report,  which  exists in this case,  of  the  Regional
	Inspector.  There is an overall duty of oversight vested  in
	the board to enforce observance of rules of safety. [909 D]
	    (4)	 To set aside the order on the ground that  the	 Re-
	gional	Inspector   had no power to recommend  but  only  to
	suspend	 and report that his recommendation  influenced	 the
	Board's order is to enthrone a processual nicety do dethrone
	plain  justice.	  Suspension, on a.n enquiry,  predicates  a
	prior prima-facie finding of guilt and to make that known to
	the Board implicitly conveys a recommendation.	The  differ-
	ence  between  suspension plus	report	and   recommendatory
	report is little more than between Tweedledum and Tweedledee
	Recommendations are not binding but are merely raw materials
	for  consideration.  Where there is no surrender. of  judge-
	ment  by the Board to the recommending	Regional  Inspector,
	there is no contravention of the cannons of natural justice.
						[909 E-F, 910D-E]
	    (5) Natural justice is no unruly horse, no lurking	land
	mine, nor a judicial cure-all.	If fairness is shown by	 the
	decision-maker	to  the	 man  proceeded	 against,  the	form
	features  and the fundamentals of such essential  processual
	propriety  being conditioned by the facts and  circumstances
	of   each   situation. no breach of natural justice  can  be
	complained  of.	  Unnatural expansion  of  natural  justice.
	without reference to the administrative realities and  other
	factors of a given case, can be exasperating.
	Courts cannot look at law in the abstract or natural justice
	as a mere artifact. Nor can the), fit into a rigid mould the
	concept	 of reasonable opportunity. If the totality of	cir-
	cumstances  satisfies the Court that the party visited	with
	gelverse  order has not suffered from denial  of  reasonable
	opportunity   the  Court will decline to be  punctilious  or
	fanatical  as  if the rules of natural justice	were  sacred
	scriptures.  In the instant case, the Board cannot be anath-
	ematised  as  condemning the man without being	heard.	 The
	respondent has, in the	form of an appeal against the report
	of  the	 Regional  Inspector, sent his	explanation  to	 the
	Chairman  of the Board.	 He has thus been heard dad  compli-
	ance  with Regulation 26 in the circumstances  is  complete.
	[909G-H, 910 A-G]
	    Tereaesai's case [1970] 1 S.C.R  251; Management of	 DTU
	[1973] 2 S.C.R. 114: Tandon's case [1974] 4 SCC 374 referred
	to.
	Observations:  Sensitive occupations demand  stern  juristic
	principles   to reach at scapegraces, high and low, and	 not
	mere  long drawn-out commissions whose verdicts often  prove
	dilatory  'shelter' for the men in whom Parliament  his	 en-
	trusted plenary management.  Any sensitive jurisprudence  of
	colliery  management  must make it cardinal to pt  nish	 the
	Board  vicariously  for any major  violations  and  dreadful
	disasters, on macro:considerations of responsibility to	 the
	community.   The Board must quit, as a legal pendry, if	 any
	dreadful   deviation.  deficiency,  default  or	  negligence
	anywhere  in the mine occurs.  This is a good case  for	 new
	principles of liability, based on wider rules of  sociologi-
	cal  jurisprudence  to tighten up the law  of  omission	 and
	commission at the highest levels.  Responsibility and penal-
	ty  must be the concomitants of highly-paid power vested  in
	the  top-brass.	  Any deviance on the part  of	these  high-
	powered authorities must be visited with tortious  or
	criminal liabilities. [908 F-H, 907 D-FI
	(The Court emphasised the need for evolving a code of strict
	liability  calling  to	utmost care not only  the  crowd  of
	workers	 and others but the few shall care or quit  so	that
	subterranean  occupations necessary for the nation are	made
	as risk-proof as technology and human vigilance permit).



JUDGMENT:

CIVIl, APPELLATE JURISDICTION: Civil Appeal No. 2294 1968.

Appeal from the Judgment and Order dated 25-9-1967 of the Madhya Pradesh High Court in Misc. Petition No. 595/66. L.N. Sinha, Sol. Genl, B. Datta and Girish Chandra for the Appellants.

906

S.K. Gambhir, amicus curiae, for the Respondent. The Judgment of the Court was delivered by KRISHNA IYER, J.--If the jurisprudence of remedies were understood and applied from the perspective of social effi- caciousness, the problem raised in this appeal would not have ended the erroneous way it did in the High Court. Judges must never forget that every law has a social pur- pose and engineering process without appreciating which justice to the law cannot be done. Here, the socio-legal situation we are faced with is a colliery, an explosive, an accident, luckily not lethal, caused by violation of a regulation and consequential cancellation of the certificate of the delinquent shot-firer, eventually quashed by the High Court, for processual solecisms, by a writ of certiorari. We may state at the outset that the learned Solicitor General agreed that the appellant, the Board of Mining Examination, would be satisfied if the law, wrongly laid down by the High Court, were set aside and declared a right and he was not insisting on the formal reversal of the order affecting the respondent (who is unrepresented before us). We proceed on that footing.

The few necessary facts may be narrated to bring up the legal issue in its real setting.

The respondent was a shot-firer in a colliery and being a risky, technical job, had to possess a certificate for it. He handed over an explosive to an unskilled hand who fired it, an accident occurred and one Bhadu, employed in the mine, was injured. The Regional Inspector of Mines imme- diately enquired into the cause of the accident and found, on the respondent's virtual admission, qualified by some prevarication, that the shots were fired not by himself but by a cutter, an unauthorised person for shot-firing to whom the respondent had wrongfully entrusted the work. Thereby he contravened the relevant Coal Mines Regulations. The Regional Inspector gave him an opportunity for explana- tion and, after considering the materials before him, for- warded the papers to the Chairman of the Board together with a recommendation for cancellation of the certificate under Reg. 26. The Board bestowed its judgment on the materials gathered by the Regional Inspector at the enquiry, which included the delinquent's admission, and cancelled the shot-firing certificate. The said cancellation was shot down by a writ of the Court on the ground of violation of Reg.

26. Was Regulation 26, in the context and set. tin. g of the Mines Act, misinterpreted by the High Court at all? This is the short question canvassed before .us. We permit our- selves a few observations Which serve as perspective-set- ters. Law is meant to serve the living and does not beat its abstract wings in the jural void. Its functional fulfilment as social engineering depends or its sensitized response to situation, subject-matter and the complex of realities which require 907 ordered control. A holistic understanding is simple justice to the meaning of all legislations. Fragmentary grasp of rules can misfire or even backfire, as in this case. It is a notorious fact that collieries--Indian collieries, both before and after nationalisation-are strategic sources of the nation's fuel and, operationally, areas of tragic human hazards. We need coal, we want miners to bring it from the bowels of the earth. The dangerous technology is not yet so perfect in India as to ensure risk-free extraction. And, after many lives have been lost by the neglect of operatives or supervisors or supine bosses, follows the scenario of tears and torn-down homes, a little monetary compensation, a flutter in Parliament, a longdrawn-out Commission, a routine Report about lapses and recipes and the little man's life-or death lot continuing to receive callous considera-

tion at the hands of the law, law-matter, law-enforcer---this sombre colliery disaster sequence must educate and inform the jurisprudence of high-risk opera- tions. In short, the Mines Act (and Regulations) must receive its judicial construction in the total setting, teleclogically approached, not fragmentarily dissected. The relevant regulation is only a tiny inset in the larger justice of the statute.

The Mines Act has a scheme designed to avoid accidents and ensure safety. A system of certificates, supervisions and penalties is part of this scheme. The broad responsi- bility for due enforcement of the Act rests on the Board and the relevant regulation casts liabilities on the lesser men. Any sensitive jurisprudence of colliery management must make it cardinal to punish the Board vicariously for any major violations and dreadful disasters, on macro considerations of responsibility to the community. The Board must quit, as a legal penalty, if any dreadful deviation, deficiency, default or negligence anywhere in the mine occurs. In the present case a microbreach is being punished, but when major mishaps occur the top echelons, on account of inadequacies in colliery codes, escape and make others the scapegoats. Although, in this ease, only injury, not death, has oc- curred, there is a good case for new principles of liabil- ity, based on wider rules of sociological jurisprudence, to tighten up the law of omission and commission, at the highest levels. Responsibility and penalty must be the concomitants of highly-paid power vested in the top-brass. Back to the pedestrian statement of facts. The re- spondent's curious contention, accepted by the learned Judge, is best understood after reading Regulation 26:

"26. Suspension of an Overman's, Sir- dar's, EngineDriver's, shot-firer's, or Gas-testing Certificate--
(1) If, in the opinion of the Regionl Inspector, a person to whom an Overman's, Sirdar's, Engine-driver's, Shot-firer's, or Gas-testing Certificate has been granted ii incompetent or is guilty of negligence or misconduct in the performance of his duties, the Regional Inspector may, after giving the person an opportunity to give a written expla-

nation, suspend his certificate by an order in writing.

10--206SC1/77 908 (2) Where the Regional Inspector has suspended a certificate under sub-regulation (1) he shall within a week of such suspen-

sion report the fact to the Board together with all connected papers including the expla- nation if any received from the person concerned.

(3) The Board may, after such inquiry as it thinks fit, either confirm or modify or reduce the period of suspension of the certif- icate, or cancel the certificate."

The plain purpose of the regulation is to pre-empt further harm by suspending the certificate of the shot-firer 'if in the opinion of the Regional Inspector' he 'is incompetent or is guilty of negligence or misconduct in the performance of his duties... after giving the person an opportunity to give a written explanation'. This suspension is itself a punishment liable to confirmation, modification, reduction of the period of suspension or, by way of enhancement, can- cellation of the certificate by the Board. Before taking such action by way of cessation, as it were, the Board gets a report from the Regional Inspector of the fact of suspension and makes 'such enquiry as it thinks fit'. In the present case, the Board had an explanation (styled an appeal) from the respondent, and also a recommendation by the Regional Inspector for cancellation of the certificate. The latter had not suspended the delinquent but had merely hold an enquiry, reached the prima facie view of guilt and and instead of suspension at once, only made a recommenda- tion to the Board for cancellation.

The Regional Inspector has, among his statutory duties, the supervision of the observance of the safety rules and the holding of enquiries (see sections 7 & 14). He has to report to the Board on breaches of regulations and condi- tions. The Board, in its turn, has the over-all charge of the safe management of the mine. Derelictions and viola- tions must reach its vigilant eye and be visited with prompt action. Jurisprudentially speaking, there is need to cast an obligation on the Board and the higher inspectorate not to be negligent, indifferent or insoucient in the discharge of its overall responsibility which includes anticipation of likely mishaps and introduction of the latest measures to promote safety for the men working in the dark depths at the mercy of the wicked mood of Yama. Any deviance on the part of these high-powered authorities must be visited with tortious or criminal liability. Such is the price which high position must pay for the consequences of calamitous failures. Sensitive occupations demand stern juristic principles to reach at scapegraces, high and low, and not mere long-grown-out commissions whose verdicts often prove dilatory 'shelter' for the-men-in whom Parliament has entrusted plenary management. We emphasize this matter to awaken the law-makers to evolve a code of strict liability calling to utmost care not only the crowd of workers and others but the few who shall care or quit so that subterra- nean occupations necessary for the nation are made as risk- proof as technology and human vigilance permit..

909

Unfortunately, the High Court surrendered to nar- rowness of interpretation of Regulation 26 by accepting the submission of the respondent. To be literal in meaning is to see the skin and miss the soul of the Regulation. The judicial key to construction is the composite perception of the deha and the dehi of the provision. So viewed, Reg. 26 is easy of comprehension.

The High Court held that the order of cancellation was illegal for a few reasons which strike us as untenable. The argument runs thus. Without first suspending the cer- tificate, the Regional Inspector cannot report to the Board and without such a report following upon a suspension the latter cannot take seisin of the matter. Since the Region- al Inspector did not suspend the respondent, the Board had no jurisdiction. Secondly, the Regional Inspector had no power to recommend, but only to report and so the Board's order, influenced by the recommendation, was bad in law. Thirdly, the Board should have given a fresh opportunity to be heard before cancellation of the certificate and its absence in the present case violated natural justice, void- ing the order.

All the three points serve to warn the courts how over-judicialisation can be subversive of the justice of the law. Now, how can the cancellation order by the Board be bad for failure to suspend the certificate by the Regional Inspector ? The Board's power is independent and is ignited by the report of the Regional Inspector. Such a report exists here. There is an overall duty of over sight vested in the Board to enforce observance of rules of safety. To invalidate the Board's order because the Regional Inspector did not suspend the certificate is a fallacy.

Now to the next point. The vice that vitiates the Board's order is stated to be the recommendation contained in the Regional Inspector's report. Had he suspended and reported, he would have been in order. But suspension, on an enquiry, predicates a prior prima facie finding of guilt and to make that known to the Board implicity conveys a recommendation. The difference between suspension plus report and recommendatory report is little more than between Tweedledum and Tweedledee. And to set aside an order on such a ground is to enthrone a processual nicety to dethrone plain justice.

The last violation regarded as a lethal objection is that Board did not enquire of the respondent, independently of the one done by the Regional Inspector. Assuming it to be necessary, here the respondent has, in the form of an appeal against the report of the Regional Inspector, sent his explanation to the Chairman of the Board. He has thus been heard and compliance with Reg. 26, in the circum- stances, is complete. Natural justice. is no unruly horse, no lurking land mine, nor a judicial cure-all. If fairness is shown by the decision-maker to the man proceeded against, the form, features and the fundamentals of such essential processual propriety being conditioned by the facts and circumstances of each situation, no breach of natural justice can be complained of. 'Unnatural expansion 910 of natural justice, without reference to the administra- tive realities and other factors of a given case, can be exasperating. We can neither be finical nor fanatical but should be flexible yet firm in this jurisdiction. No man shall be hit below the belt--that is the conscience of the matter.

Shri Gambir, who appeared as amicus curiae and indus- triously helped the Court by citing several decisions bear- ing on natural justice, could not convince us to reach a contrary conclusion. It is true that in the context of Art. 311 of the Constitution this Court has interpreted the quality and amplitude of the opportunity to be extended to an affected public servant. Certainly we agree with 'the principles expounded therein. But then we cannot look at law in the abstract or natural justice as a mere artifact. Nor can we fit into a rigid mould the concept of reasonable opportunity. Shri Gambhir cited before us the decisions in Teredesai(1); Management of DTU(2) and Tandon(3); and one or two other rulings. The ratio therein hardly mili- tates against the realism which must inform reasonable opportunity' or the rule against bias. If the authority which takes the final decision acts mechanically and without applying its own mind, the order may be bad, but if the decision-making body, after fair and independent considera- tion, reaches a conclusion which tallies with the recommen- dations of the subordinate authority which held the prelim- inary enquiry, there is no error in law. Recommendations are not binding but are merely raw material for considera- tion. Where there is no surrender of judgment by the Board to the recommending Regional Inspector, there is no contra- vention of the canons" of natural justice. We agree with Shri Gambhir that the adjudicating agency must indicate in the order, at least briefly why it takes the decision it does unless the circumstances are so clear that the conclud- ing or decretal part of the order speaks for itself even regarding the reasons which have led to it. It is desirable also to communicate the report of the Inquiry Officer, including that part which relates to the recommendation in the matter of punishment, so that the representation of the delinquent may be pointed and meaningful.

These general observations must be tested on the con- crete facts of each case and every miniscule violation does ,not spell illegality. If the totality of circumstances satisfies the Court that the party visited with adverse order has not suffered from denial of reasonable opportunity the Court will decline to be punctilious or fanatical as if the rules of natural justice were sacred scriptures. We are satisfied that the order of the Board cannot be anathematised as condemning the man without being heard. The appeal, on the point of law, must be allowed but, in the light of the concession made, as stated earlier, we leave the formal order of the High Court undisturbed. No costs.

	S.R.				    High Court orders  main-
	tained.
	(1) [1970] 1 S.C.R. 251.
	(2) [1973] 2. S.C.R. 114.
	(3) [1974] 4 S.C.C. 374.
	911