Section 168(d) in The Rajasthan Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Rules, 2009
(d)temporary sheet piling installed for the construction of a retaining wall after excavation is not removed except on the advice of the responsible person referred to in Rule 164 after an inspection carried out by such responsible person;