Section 2(1)(k) in Bihar Electricity Regulatory Commission (Standards of Performance of Distribution Licensee) Regulations, 2006
(k)"Period of Load Shedding" means a period during which the power has to be Switched off to certain feeders to match the demand and supply as per the instructions of the respective load despatch centres.