NCT Delhi - Subsection

Section 3(v) in Delhi Electricity Regulatory Commission (Grant of Consent for Captive Power Plants) Regulations, 2002

(v)For units of CPP proposed to be standby/stand-alone and not connected with the grid the CPP shall install inter-locking/change-over switch of proper rating to avoid parallel operation and damage to the Boards installation.