Section 29(1) in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014

(1)Normative Operation and Maintenance expenses of thermal generating stations shall be as follows:
(a)Coal based and lignite fired (including those based on Circulating Fluidised Bed Combustion (CFBC) technology) generating stations, other than the generating stations/units referred to in clauses (b) and (d):
        (in Rs Lakh/MW)
Year 200/210/250 MW Sets 300/330/350 MW Sets 500 MW Sets 600 MW Sets and above
FY 2014-15 23.90 19.95 16.00 14.40
FY 2015-16 25.40 21.21 17.01 15.31
FY 2016-17 27.00 22.54 18.08 16.27
FY 2017-18 28.70 23.96 19.22 17.30
FY 2018-19 30.51 25.47 20.43 18.38
Provided that the norms shall be multiplied by the following factors for arriving at norms of O&M expenses for additional units in respective unit sizes for the units whose COD occurs on or after 1.4.2014 in the same station:
200/210/250 MW Additional 5th& 6thunits 0.90
  Additional 7th& more units 0.85
300/330/350 MW Additional 4th& 5thunits 0.90
  Additional 6th& more units 0.85
500 MW and above Additional 3rd& 4thunits 0.90
  Additional 5th& above units 0.85
(b)Talcher Thermal Power Station (TPS), Tanda TPS, Badarpur TPS Unit 1 to 3 of NTPC and Chandrapura TPS Unit 1 to 3 and Durgapur TPS Unit 1 of DVC:
    (in Rs Lakh/MW)
Year Talcher TPS Chandrapura TPS (Units 1 to 3), Tanda TPS,Badarpur TPWS (Unit 1 to 3) , Durgapur TPS (Unit 1)
2014-15 43.16 35.88
2015-16 45.87 38.14
2016-17 48.76 40.54
2017-18 51.83 43.09
2018-19 55.09 45.80
(c)Open Cycle Gas Turbine/Combined Cycle generating stations:
        (in Rs Lakh/MW)
Year Gas Turbine/ Combined Cycle generatingstations other than small gas turbine power generating stations Small gas turbine power generating stations Agartala GPS Advance F Class Machines
2014-15 14.67 33.43 41.32 26.55
2015-16 15.59 35.70 44.14 28.36
2016-17 16.57 38.13 47.14 30.29
2017-18 17.61 40.73 50.35 32.35
2018-19 18.72 43.50 53.78 34.56
(d)Lignite-fired generating stations :
    (in Rs Lakh/MW)
Year 125 MW Sets TPS-I of NLC
2014-15 29.10 38.12
2015-16 30.94 40.52
2016-17 32.88 43.07
2017-18 34.95 45.78
2018-19 37.15 48.66
(e)Generating Stations based on coal rejects :
Year O&M Expenses (in Rs Lakh/MW)
2014-15 29.10
2015-16 30.94
2016-17 32.88
2017-18 34.95
2018-19 37.15