State of Odisha - Subsection

Section 27(3) in The Orissa Irrigation Rules, 1961

(3)[ The concerned Irrigation Officer of the irrigation work shall order installation of a Flow Meter or a suitable measuring device within the period as stipulated by him not being less than thirty days from the date of such order at the cost of the applicant to measure the quantum of water to be drawn from the irrigation work and Flow Meter/measuring device shall be installed under his direct supervision or under the supervision of an Engineer not below the rank of Assistant Engineer to be specifically nominated by him, failing which the water supply shall not be given or shall be discontinued by him after giving seven days' notice.] [Substituted vide O.G.E.No. 1423 Notification No. 51010-IIIW-Legislative 39/99,- R, dated 29.9.1999.]