[Cites 0, Cited by 0] [Section 21] [Entire Act]

Union of India - Subsection

Section 21(7) in Central Electricity Regulatory Commission (Fees and Charges of Regional Load Despatch Centre and other related matters) Regulations, 2019

(7)The balance depreciable value as on 1.4.2019 shall be worked out by deducting the cumulative depreciation from the gross depreciable value of the assets appearing in the books of accounts of the Power System Operation Corporation Limited for the respective Regional Load Despatch Centre and National Load Despatch Centre.