Section 14(4)(b) in Tamil Nadu Land Improvement Schemes Act, 1959
(b)construction of depression storage in the catchment to promote greater infiltration, reduce silt load in channel flows and peak flows, farm, ponds and other water harvesting measures combined with erosion and gully control works;