Union of India - Subsection

Section 5(2) in The Electricity Rules, 2005

(2)The Appropriate Commission, on an application filed by the National Load Despatch Centre, the Regional Load Despatch Centre or the State Load Despatch Centre and after hearing the Transmission Licensee, if satisfied that the Transmission Licensee has persistently failed to maintain the availability of the transmission system, may issue such directions to the National Load Despatch Centre, the Regional Load Despatch Centre or the State Load Despatch Centre to take control of the operations of the transmission system of such Transmission Licensee for such period and on such terms, as the Commission may decide.