Section 88(1)(b) in The Coal Mines Regulations, 2017
(b)once at least in every seven days, -(i)each winding rope by passing the rope at a speed not exceeding one meter per second; and(ii)the external parts of the winding engine, the guides and the signaling arrangements fitted in a shaft;