Section 134(d) in Chhattisgarh Building and Other Construction Workers' (Regulation of Employment and Conditions of Service) Rules, 2008
(d)such casing and bracing are provided to a shaft at an excavation or tunnelling work up to the depth of such shaft at an excavation or tunnelling work according to the appropriate design for such casing and bracing ;