Union of India - Subsection

Section 44(7) in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2019

(7)Shortfall in energy charges in comparison to fifty percent of the annual fixed cost shall be allowed to be recovered in six equal monthly installments:Provided that in case actual generation from a hydro generating station is less than the design energy for a continuous period of four years on account of hydrology factor, the generating station shall approach the Central Electricity Authority with relevant hydrology data for revision of design energy of the station.