[Cites 0, Cited by 0]
[Section 13]
[Entire Act]
State of Rajasthan - Subsection
Section 13(3) in Rajasthan Land Revenue (Allotment of Land for Setting up of Power Plant based on Renewable Energy Sources) Rules, 2007
| I. | Company Details | |
| 1. | Name of the applicant / organization | : |
| 2. | State whether the applicant / organization is a | : |
| a) Company registered under Indian Companies Act1956; | : | |
| b) Co-operative Society; | : | |
| c) Any other corporate entity. | : | |
| 3. | Address: | |
| i) Office | : | |
| a) Telephone No. | : | |
| b) Fax No. | : | |
| c) Email Address | : | |
| ii) Name and Address of the authorised person | : | |
| a) Name | : | |
| b) Address | : | |
| c) Telephone No. | : | |
| d) Fax No. | : | |
| 4. | In case of any other corporate entity, givedetails of partners / directors/ owners | : |
| 5. | Whether income tax assessee, if yes, pleasestate the year up to which assessment mane (copies of assessmentfor last three years to be enclosed) | : |
| 6. | If answer to 5 is No, state whether the promoteris en assessee. | : |
| 7. | Income tax permanent A/c. NO. | : |
| 8. | Present activity / business carried on by theapplicant/ organisation. | : |
| 9. | Give details of the turn over of theorganization in last three years (copies of the profit and lossaccount and Balance Sheet / Annual Report to be enclosed). | : |
| 10. | Do you propose set up the plant in the name ofexisting company or propose some sister concern. | : |
| II | Proposed Power Project | |
| 1. | a) Proposed Gross Capacity (MW) | : |
| b) Auxiliary Consumption (MW) | : | |
| c) Net Capacity (MW) | : | |
| d) Plant Load Factor (PLF)% | : | |
| e) Net expected power generation per annum | : …............... lacs KWh | |
| 2. | a)Location of proposed site with details. | : |
| b) Land details of the power plant site | : | |
| i) Name of village | : | |
| ii) Khasra Nos. | : | |
| iii) Area of land from each Khasra No. | : | |
| iv) Land map with clear markings of land :required for the project. | : | |
| v) Is it Govt. land or Pvt. land | : | |
| 3. | Nearest Railway Station | : |
| 4. | Name of the manufacturer with address forsupply, installation and commissioning of the power generationsystem, if identified. | : |
| 5. | Financing Arrangement: | : |
| a) Own funds (promoters) | : | |
| b) IREDA/ PFC/REC/ Financial Institution /Commercial Banks | : | |
| c) Equity | : | |
| d) Others | : | |
| 6. | Time frame and pert chart for major activities. | : |
| i) Acquisition of land | : | |
| ii) Signing of PPA | : | |
| iii) Expected financial closure | : | |
| iv) Date of commissioning / synchronization | : | |
| v) Proposed Commercial Operation Date (COD) | : | |
| 7. | Power Plant proposed to be set up for | : |
| a) Captive use | : | |
| b) Sale to RVPN/DISCOM on approved rate | : | |
| c) Third party sale at mutually agreeable rateson payment of approved wheeling charges to RVPN. | : | |
| 8. | Please tick the Non Conventional Source ofEnergy on which the project is proposed to be based | : |
| a) Biomass | : | |
| b) SPV SPY - Wind Hybrid | : | |
| c) Wind | : | |
| d) Mini-Small Hydel | : | |
| e) Biogas | : |
| III | Details of Proposed Power Projects | |
| a) | For Biomass based Power Plants: | |
| i) | Biomass proposed to be used (i.e. Rice husk,mustard stalk,wood chips, saw dust, coconut shell, groundnuthusk, woodwaste fire wood industrial waste of paper millsplywood industry etc. | : Name and type of Biomass |
| ii) | Name of Technology (Pyrolysis, Gasification,Incineration/Palletisation/ Briquetting, through gas/ Steamturbine, duel fuelengine/gas engine route or combination thereof/ Bagasse /Biomass Cogeneration) | : |
| iii) | Required quantity of Biomass | :..................... MT per year |
| iv) | Available quantiiy of Biomass | :..................... MT per year |
| a) | From own sources year | :..................... MT per year |
| b) | From other sources | :..................... MT per year |
| v) | Calorific value of proposed biomass to be used | :....................Kcal/Kg |
| vi) | Cost of biomass to be used | : Rs. ...............per tone |
| vii) | Is the biomass available for 10 years | : Yes/No...................... |
| c) | Solar Photovoltaic Power Plant(SPV)/SPV-Wind Hybrid: | |
| i) | No. of Solar Modules proposed | : |
| ii) | Capacity of PCU | : |
| iii) | Battery bank proposed | : Yes/No |
| iv) | If yes, its capacity: | : |
| v) | Duration and time of day during which supply ofpower is proposed : | : |
| d) | Wind farms : - | |
| i) | Total capacity of the proposed Wind Farm, alongwith Micro siting plan as per C-WET guidelines. Type testapproval and Power Curve of WEG proposed should also be enclosed. | : |
| ii) | No. of Wind Energy Generators (with capacities)proposed to be installed along with individual capacity ofgenerators (Technical Parameters of WEG should be indicated). | : |
| iii) | Location at which Wind Farm is proposed alongwith category of Land i.e. Revenue/ Forest, Khasra wise area andJama bandi map (only out of eight potential locationsauthenticated by C-WET). | : |
| iv) | Wind assessment, Feasibility report, DPR ofproposed site is enclosed. (Applications not accompanied withFeasibility report will not be entertained). Feasibility reportshould include Site details, Wind assessment data, Basis/Sourceof Wind Data Estimated generation on the basis of Power Curve ofWEG proposed and cash flow analysis including profitabilitystatement, assumptions made etc. | : |
| v) | Please furnish the details of previousexperience in the field of wind power generation and ormanufacturing of WEGs, or experience in generation of gridquality power. | : |
| e) | Hydel Power Plant: | |
| i) | Capacity of proposed Mini/Micro Estimatedannual generation | : |
| ii) | Design head discharge | : |
| iii) | No. of turbines their capacity | : |
| iv) | Type of turbine | : |
| v) | Generation voltage | : |
| vi) | Location of proposed plant: | : |
| a) | Dam/Canal/River | : |
| b) | Village | : |
| c) | District | : |
| vii) | Whether feasibility report of proposed site isenclosed (without feasibility report application will not beentertained). Format is enclosed | : |
| f) | Biogas Plants: | |
| i) | Type of fuel used(i.e. cattle dung / digested slurry / Kitchenwaste/ Agro waste etc.) | : |
| ii) | Required quantity of bio-fuel | : ...............MT per year |
| iii) | Available quantity of bio-fuel | : |
| a) | From Own Source | : ...............MT per year |
| b) | From Other Source | ...............MT per year |
| iv) | Cost of bio-fuel available for 10 years | :...................Rs./MT |
| v) | Is the bio-fuel available for 10 years | :...................Yes/No |
| IV. | Electrical Details | |||
| 1. | Transmission of Power Evacuationplan/interconnection facility for the proposed plan | : | ||
| 2. | Interfacing scheme proposed | : | ||
| 3. | For captive power plant | |||
| i) | Present consumption of Electricity. | : | ||
| a) From Vidyut Vitaran Nigam | : | |||
| b) Captive Generation | : | |||
| ii) | Connected load of the company | : | ||
| iii) | HT/LT consumer. | : | ||
| iv) | Nearest Sub-station of RVPN/NVN and distancefrom the proposed power plant. | : | ||
| v) | Voltage ratio of the Sub-station | : | ||
| V. | Financial Details | |||
| 1 | Estimated cost of the project proposed | : | ||
| 2. | Cost of power generation per unit (Pleaseenclose Cash Flow Chart also). | : ......................Rs./kWh | ||
| 3. | How do you propose to raise the required financefor the project: | : | ||
| a) Equity share capital | : | |||
| b) Promoters contribution | : | |||
| c) Term Loans | : | |||
| 4 | Do you envisage any foreign collaboration, if soplease furnish the details | : | ||
| 5. | Details of the application/processing feeremitted | : (@ Rs 50000/- per MW) | ||
| a) Amount Rs. | : | |||
| b) Demand Draft/Cheque No. | : | |||
| c) Date | : | |||
| 6. | Detail of Security amount remitted (as perclause 15.2 of Policy 2004) - | : | ||
| • For Wind energy projects: | ||||
| (1) In Jaisalmer district | : Rs. 10 lac per MW | |||
| (2) In other districts | : Rs. 5.0 lac per MW | |||
| • For Biomass and Solar energy projects | : Rs. 1.0 lac per MW | |||
| a) Amount Rs. | : | |||
| b) Demand Draft/Cheque No. | : | |||
| c) Date | : | |||
| 7. | Detail of fee for creation of facility forreceiving station (as per clause 5.1.2 of Policy 2004) | : | ||
| a) Amount Es. | ||||
| b) Demand Draft/Cheque No. | ||||
| c) Date | ||||
| 8. | Detail of fee for Transmission and DistributionNetwork Augmentation (as per clause 5.1.4 of Policy 2004): | |||
| • Rs. 15.00 lac / MW for wind energy power plants. | ||||
| • Rs, 5.00 lac / MW for biomass power projects aswell as for wind energy power projects up to 20 MW capacitysituated outside Jaisalmer-Barmer-Jodhpur region and notutilizing the EHV network of Jaisalmer-Barmer-Jodhpur andJaisalmer-Phalodi-Jodhpur. | ||||
| a) Amount Rs. | : | |||
| b) Demand Draft/Cheque No. | : | |||
| c) Date | : | |||
| 9. | Can you help access bilateral grants/concessional loans from GoR to provide soft loan for your project(if yes, give details of the agency and preliminary terms andconditions) |