Section 166(3)(b) in West Bengal Municipal (Building) Rules, 2007
(b)soak pits may be constructed on the side of buildings at right angles to the slope of the land and from the building foundations. There shall be a minimum clearance of 2.1 metres between the foundation and the soak pit to minimize the chances of dampness and slope failures due to seepage from the soak pit.