Section 4(1)(b) in MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016
(b)MGO shall be entitled to supply entire quantum of electricity generated from the Micro-Grid projects to the consumers at mutually agreed tariff. Upon grid arrival, MGO shall generate and supply entire electricity generated to the Distribution Licensee at the interconnection point at FiT determined by the Commission and shall be governed by MPERC Regulations regarding Renewable Energy.