Section 145(10) in The Coal Mines Regulations, 2017
(10)In every travelling roadway, and in every airway other than those specified in sub-regulation (2), samples shall be taken in such a systematic manner and at such intervals not exceeding three months, to maintain proper check on the efficiency of the treatment thereof in terms of sub-regulation (5) of regulation 144.