58. Removal of Encroachments.
- Farmer's Organisation shall exercise its power to remove encroachment on irrigation works in their respective jurisdictions through Managing Committee in the same manner as is exercised by the Tehsildar under the provision of the Rajasthan Land Revenue Act, 1956 and rules made thereunder.Form-1[See rule 5(2)]Claim Application For Inclusion of Name In The Electoral RollTo,The Electoral Registration Officer,Water Users' Association...................Sir,I request that my name be included in the electoral roll of territorial constituency No................................... of .............................. (Name of Water Users' Association)| 1. | Name (in full) | …........................................................................... |
| 2. | Father's/Mother's/Husband'sName | …........................................................................... |
| 3. | particulars of myplace of residence are | …........................................................................... |
| (a) House No. | …........................................................................... | |
| (b) Street/Mohalla | …........................................................................... | |
| (c)Town/Village | …........................................................................... | |
| (d) Post office | …........................................................................... | |
| (e) Police Station Sub division | …........................................................................... | |
| 4. | Particulars ofland holding | …........................................................................... |
| (a) Name of the Irrigation system | …........................................................................... | |
| (b) Name of the village | …........................................................................... | |
| (c) Survey No. | …........................................................................... | |
| (d) area | …........................................................................... | |
| I hereby declarethat to the best of my knowledge andbelief......................... | ||
| (i) that i am a citizen of India; | ||
| (ii) That my age on the first day of January is year and months. | ||
| (iii) That I am water User of this Water Users Association at theparticulars given above. | ||
| Place: | ||
| Date: | Signature or ThumpImpression of Claimant | |
| Copy submitted to Tehsildar..................... for information &necessary actionplace. [Ref. Rule 5(6)] | ||
| Signature or Thump | ||
| Impression of Claimant |
| S.No. | Present entry which entry has been objected | Corrected to be inserted. |
| 1. | ||
| 2. | ||
| 3. | ||
| Place :Date: | Signature or ThumpImpression of objector | |
| Copy submitted to Tehsildar for information &necessary action place. [Ref. Rule 5(6) |
| S .No. | Khasra | Area | Minor system | Territorial Constituency | Remark |
| 1 | 2 | 3 | 4 | 5 | 6 |
| 1. | Name of Officer Member, ManagingCommittee/President/Chairperson of | …................................................. |
| …................................................. | ||
| 2. | Name or number of the territorial constituency | …................................................. |
| 3. | Full name of the candidate | …................................................. |
| 4. | Father's or husband's name | …................................................. |
| 5. | Serial Number of the candidate in the Electoraroll | …................................................. |
| 6. | Age of Candidate | …................................................. |
| 7. | Sex of candidate | …................................................. |
| 8. | Occupation and Address of candidate | …................................................. |
| 9. | Full name of the proposer | …................................................. |
| 10. | Serial number of the proposer | …................................................. |
| Signature of the proposer | ||
| Candidate's Declaration | ||
| I declare that I am eligible and willing tostand for election and my age as shown above is correct. | ||
| Signature of candidate | ||
| The above declaration is solemnly affirmed beforeme......................................... (name of the officerin block letter) by….................................................who ispersonally known to me who has been identified to my satisfactionby............................................of............................. | ||
| Signature of the election officer or otherauthorised person | ||
| Nomination form should be presented in person…........................................This nominationpaper was presented to me at…................................(hrs.)on............................... (date) by shri/smt…................................candidate or proposer. | ||
| Decision of election officer accepting orrejecting the nomination paper. | ||
| Signature of the election officer or otherauthorised person |
| S.No. Alloted | Name of the Candidate | S No. of voter list |
| 1 | 2 | 3 |
| 1. | ||
| 2. | ||
| 3. | ||
| 4. | ||
| 5. | ||
| etc. | ||
| Place : | Election Officer |
| S.No. Alloted | Name of the Candidate | S No. of voter list |
| 1 | 2 | 3 |
| 1. | ||
| 2. | ||
| 3. | ||
| 4. | ||
| 5. | ||
| etc. | ||
| Place : | Election Officer |
| S.No. Alloted | Name of the Candidate | S No. of voter list | Symbol alloted/assigned |
| 1 | 2 | 3 | |
| 1. | |||
| 2. | |||
| 3. | |||
| 4. | |||
| 5. | |||
| etc. | |||
| Place :Date: | Election Officer |
| S.No. of the voter | Signature |
| No......................... | Thumb impression |
| S.No........................... | ||
| Name of the Candidate in Hindi Alphabeticalorder in the box space | Symbol allotted | Put E/mark against one name only in the boxspace provided l |
| 1. Name | ||
| 2. Name | ||
| 3. Name | ||
| 4. Name | ||
| 5. Name | ||
| 6. Name |
| Water Distribution system (Canal works) | |||||||
| 1. | Name of canal | ||||||
| 2. | Name of minor | ||||||
| 3. | Discharge at Head.,. | ||||||
| 4. | Total territorial constituency | ||||||
| 5. | Total No. Chaks: | ||||||
| 1. Outlet size CCA | Nos. Location | Type | Khasras Nos. | Total | |||
| 6. | (a) GCA | (b)CCA | (c) ICA | (d) No. of benefical Gen. Obc. Sc. St. Total | |||
| 7 | Detail of structure of minor | ||||||
| S.No. | Type | Particular | Location | Details | Remarks | ||
| 8. | Details of head regulator | ||||||
| Type | |||||||
| Size of Gate | |||||||
| No. of Gate | |||||||
| Full supply level | |||||||
| Full supply discharge | |||||||
| 9. | Particular | Parent channel | Minor | ||||
| 1. Discharge | |||||||
| 2. Bed width | |||||||
| 3. Side slope | |||||||
| 4. Full supply depth | |||||||
| 5. Free board | |||||||
| 10. | BAR-CHART Flow Diagram | ||||||
| 11. | Drainage Channel | ||||||
| (a) Name of Discharge channel | |||||||
| (b) Side of minor (Left/Right) | |||||||
| (c) Total Length | |||||||
| (d) Approximate section | |||||||
| (e) Discharge | |||||||
| (f) Out fall into | |||||||
| 12. | Land Property details including borrow area/drainage channel & minor with in canal boundaries | ||||||
| S.No. | Reach/Side | Total width of strip from centre of Minor | Part of Khasra No. | Area | Remarks | ||
| 1 | 2 | 3 | 4 | 5 | 6 | ||
| Status Of Works | |||||||
| (A) | In case of small/minor/medium Tanks (Headworks) | ||||||
| 1. | Name of Tank….................................Tehsil…..................................Distt….................................. | ||||||
| 2. | Name ofWUA…..................................….................................. | ||||||
| 3. | Capacities | Gross | Dead | Live. | |||
| (MM3) | |||||||
| 4. | Reservior Elevation (metre/fee) | ||||||
| Sill level | Full tank level | Maximum water level | Top bundh level | ||||
| 1 | 2 | 3 | 4 | ||||
| 1. | |||||||
| 2. | |||||||
| 3. | |||||||
| 5. | Details of sluices | ||||||
| S.No. | Particular | Location | Silllevel | No. of gates | size of gates | Discharge | CCA |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| 6. | Length of Bundh (m)/ch. | (a) Length of Earthen bundh | |||||
| (b) Length of surplusing arrangement | |||||||
| (i) Wier/spil way ….....................type | |||||||
| (ii) Bye-wash ….................................. | |||||||
| (iii) Gated structure …..................................No. of gates size of gates | |||||||
| (iv) Other (Khasra no.) | |||||||
| 7. | Max Height of bundh | (i) Earthen | |||||
| (ii) Masonary | |||||||
| (iii) Spillway | |||||||
| 8. | Surplus Discharge Capacity | 1. Design............... | |||||
| 2. Ma ............... observed year............... | |||||||
| 3. Flood lift (m)............... | |||||||
| 9. | Irrigation Potential (ha) | 1. G.C.A ............... No. of village benefited...... | |||||
| 2.C.C.A............... | |||||||
| 3.ICA............... | |||||||
| 4. Max. Irrigation Recorded ...............year....... | |||||||
| 5. Nos of Families benefited General OBC.SC.ST. Total | |||||||
| 6. No. of wells/lift donries............... | |||||||
| 10. | Other Relevent data. | (a) In submergence | |||||
| (b) In command ............................... |
| Name of project..................... | Name of Framer Organisation ............................... |
| Yearly Stocki/Material at Site register | |
| (For consumable/perishable goods, stationery, item etc.) |
| S.No. | Particular of item | Specification | Previous balance | Purchase durintg, quarter Ref. of M.B. Qty. | Consumed quarter Ref. of Consumption M.B. etc.Qty. | Balance available | Remarks with verification |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Name of project..................... | Name of W.U.A............................... |
| S .No. | Khasra Nos. | Total area | Name of holder | Area under lift | Location | Pump D-Diesal E-Electic O-other means | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
| Name of project..................... | Name of W.U.A............................... |
| S.No. | Name of Village | Well No. | Tube well No. | Khasra No. | Location | |
| Outside command | with in command | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| Name of the owner | Area usually irrigation | Water level elevation (Depth of water from top) | Remarks | |||
| Khasra No. | Area | Year | May | Sept. | ||
| 8 | 9 | 10 | 11 | 12 | 13 | 14 |
| Name of Project | Name of W U A................................................ | |
| Discharge-Gauge Register | GaugeReport..................................................... | |
| Date....................................hr................................................ | Date....................................hr................................................ | |
| (A) ForTanks…......................................... | 1. Name of canal…......................................... | |
| (i) Full tank elevation…......................................... | 2. Reach(Location…......................................... | |
| (ii) Gross capacity at…......................................... | 3. Design FSDat…......................................... | |
| (iii) present day elecvationhead…......................................... | ||
| (iv) Correspondingcapacity…......................................... | 4. Design discharge | |
| (v) Dead storage…......................................... | 5. Present measured | |
| Name of Canal…......................................... | ||
| FSD | 6. | |
| 1. Reach (Location) …......................................... | ||
| Corresponding discharge (fromtable)…......................................... | ||
| 2. Design FSD at head | ||
| 3. Design Discharge…......................................... | ||
| 4. Present measured FSD…......................................... | ||
| 5. CorrespondingDischarge…......................................... | ||
| (from table) | ||
| (B) For canal…......................................... | ||
| Parent channel details | 1 Name of minor…......................................... | |
| Name …......................................... | 2. Type of channel…......................................... | |
| (a) Design date …......................................... | 3. Bed width…......................................... | |
| (i) Bed width …......................................... | 4. FSD (Design…......................................... | |
| (ii) Discharge | 5. Design discharge at FSD | |
| (iii) FSD …......................................... | 6. Present FSD…......................................... | |
| (h) Present operation | 7. Corresponding discharge | |
| (i) Present dauge …......................................... | (from table curve........................... ) | |
| (ii) Corresponding flow | ||
| (c) Details of head,regulator | ||
| (i) No. of gauge opened…......................................... | ||
| (ii) Size of opening …......................................... | ||
| (iii) Discharge …......................................... | ||
| (d) Details of D/s cross regulator | ||
| (i) No. of gates opened…......................................... | ||
| (ii) Discharge passing downstream…......................................... | ||
| Sign. of WUA Representative | Sign. of Department Representative |
| Name of project..................... | Name of W.U.A............................... |
| S. No. | Name of land holder/ father name with village | No. of Territorial constituency | Chak No. | Revenue Khasra Survey No. | Type of land (Rev. classification |
| 1 | 2 | 3 | 4 | 5 | 6 |
| Area detail | Out side cornet and | Total area (ha) | Remarks | ||
| in command | |||||
| Under flow irrigation | Under lift irrigation | Total CCA | |||
| 7 | 8 | 9 | 10 | 11 | 12 |
| Name of project..................... | Name of village.................. | Name of WUA .............. |
| Name of District/minor..................... | year................................. | Crop season..............Chak No. |
| S. No. | Name of land holder | Survey No. | Total area (ha) | Name of Crop | Actual area irrigated (ha) from canal | |||
| by flow | by Eft | seja/peta | total | |||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| No. of irrigation | Water rates per ha | Water charge assesed Rs. | Other charges panelties Rs. Amount | Total dues Rs. | Remark with signature |
| 10 | 11 | 12 | 13 | 14 | 15 |
| Name of project..................... | Name of village.................. | Name of WUA ..............for the year........................... |
| S.No. | Name of land holder | Reference no. of IDA register | year of dues with crop season | Total amount due | Amount received | Reference no. of receipt book | Balance due | Remarks with signature |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| Name of project..................... | Name of village.................. | Name of WUA .............. |
| Name of District/minor..................... |
| S.No. | Name of land holder | Reference no. of IDA/IDR register | year | Crop season | outstanding | Remarks with signature | ||
| Irrigation dues in Rs. | Interest panel charges | Total dues in Rs' | ||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |
| S. No. | Type and name of structure | Particulars | Location | Description | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 |
| Name of Project…................................... | Name of WUA….......................................... |
| S. No. | Name work with location | Technical Sanction amount & reference ofsanction | Ref. of Gen. body approval | M.B. ref. | Amount bill | Paid vide cheque and amount | other detail chargeable head etc. | Remarks |
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |