Section 146(3) in The Coal Mines Regulations, 2011

(3)The owner, agent or manger of every mine shall, within three months of the coming into force of these regulations and once at least in every month thereafter or whenever the Regional Inspector so requires by an order in writing, cause the air at every work place where airborne dust is generated, to be sampled and the concentration of respirable dust therein determined:Provided that, such measurements shall also be made immediately upon the commissioning of any plant, equipment or machinery or upon the introduction of any new work practice or upon any alteration therein that is likely to bring about any substantial change in the level of airborne respirable dust.