Section 72 in Joint Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2019

72. Auxiliary Consumption.

- 72.1 The auxiliary power consumption for MSW / RDF based power projects shall be 15%.