State of Tamilnadu - Subsection

Section 5(2)(A) in The Tamil Nadu Electricity Supply Code, 2004

(A)in case the recorded demand has not exceeded 112 KW, the existing load sanction shall, after intimation to the consumer, be revised within one month of the second occurrence to the level of recorded demand and all the relevant charges applicable to the additional load shall be included in the next bill;