[Cites 0, Cited by 0] [Section 3] [Entire Act]

Union of India - Subsection

Section 3(56) in Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2014

(56)'Scheduled Generation' or 'SG' at any time or for any period or time block means schedule of ex-bus generation in MW or MWh, given by the concerned Load Despatch Centre;Note: - For the open cycle gas turbine generating station or a combined cycle generating station if the average frequency for any time-block, is below 49.52 Hz but not below 49.02 Hz and the scheduled generation is more than 98.5% of the declared capacity, the scheduled generation shall be deemed to have been reduced to 98.5% of the declared capacity, and if the average frequency for any time-block is below 49.02 Hz and the scheduled generation is more than 96.5% of the declared capacity, the scheduled generation shall be deemed to have been reduced to 96.5% of the declared capacity. In such an event of reduction of scheduled generation of gas turbine generating station, the corresponding drawal schedule of beneficiaries shall be corrected in proportion to their scheduled drawal with adjustment of transmission losses on post facto basis.