Section 6(4)(c) in The Central Electricity Authority (Technical Standards for Connectivity to the Grid) Regulations, 2007
(c)participate in contingency operations such as load shedding, increasing or reducing generation, is landing, black start, providing start-up power and restoration as per the procedure decided by the Appropriate Load Despatch Centre;