Section 118(2) in The Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965
(2)This application shall be accompanied by a certificate referred to in rule 117 and such amount as may be laid down from time to time by the Director and calculated on the basis of the current schedule of rates to meet the cost of proposed connection.