Section 4(2)(c) in The Merchant Shipping (Cargo Ship Construction And Survey) Rules, 1974
(c)where there is access from the lower part of a machinery space to a water-tight shaft tunnel, the access opening shall be provided with a sliding water-tight door which shall be capable of being operated locally on both sides of the door;