Section 186(a) in U.P. Building And Other Construction Workers (Regulation Of Employment And Conditions Of Service) Rules, 2009
(a)where the depth of a trench requires two lengths of sheet piling, one above the other, the lower piling is set inside the bottom strings or wales of the upper piling and such sheet piling is driven down and braced as the excavation continues;