Section 56(8)(b) in The West Bengal Factories Rules, 1958
(b)If any information as to the date of construction, thickness of walls, or maximum permissible working pressure is not available, the age of such pressure vessel or plant shall be determined by the competent person in consultation with the Chief Inspector from the other particulars available with the manager.