Section 219(1) in The Coal Mines Regulations, 2017
(1)On completion of the exploration work in the mine or part thereof, a detailed exploration report complete in all respects shall be submitted to the Chief Inspector and a copy thereof to the Regional Inspector:Provided that an interim report, if so required by the Chief Inspector, shall also be submitted from time to time.