Section 125(f) in The Building And Other Construction Workers '(Regulation Of Employment And Conditions Of Service) Central Rules, 1998
(f)excavated material is not stored at least zero point six five metre from the edge of an open excavation or trench and the banks of such excavation or trench are stripped of loose rocks and other materials which may slide, roll or fall upon a building worker working below such bank;