National Green Tribunal
Rajesh Kumar Singh S/O Sh. Ramjanam ... vs Union Of India on 10 May, 2022
Item No.2
BEFORE THE NATIONAL GREEN TRIBUNAL
CENTRAL ZONE BENCH, BHOPAL
(Through Video Conferencing)
Original Application No. 78/2021 (CZ)
Rajesh Kumar Singh. Applicant(s)
Versus
Union of India & Ors Respondent(s)
Date of Hearing: 10.05.2022
CORAM: HON'BLE MR. JUSTICE SHEO KUMAR SINGH, JUDICIAL MEMBER
HON'BLE DR. ARUN KUMAR VERMA, EXPERT MEMBER
For Applicant(s): None
For Respondent(s) : Dr. Sapna Aggarwal, Adv
Ms. Parul Bhadoria, Adv
Mr. Yadvendra Yadav, Adv
Mr. Sachin K. Verma, Adv
ORDER
1. Issues raised in this application are illegal mining, loading and storage of sand by some private contractors and sand mafias by deploying heavy machines for sand mining from the sanctioned quarries in the river Narmada causing environmental and ecological imbalance in violation of Madhya Pradesh Sand (Mining, Transportation, Storage and Trading) Rules.
2. The matter was taken up on 29th October, 2021, and a Committee was constituted with direction to submit the Factual and Action Taken Report. The members of the Committee visited the site and submitted the report as follows:
"The Joint committee has visited the Sand Mines dated 30.11.2021 located at River Narmada. The committee first visit the sand mine at Village-Sagda Jhapni located at Khasra No. l/l Area2.023 Hect & Village-Saliwada located at Khasra No. 464 Area 4.0 Hect to verify the claims made by the applicant in the petition regarding the illegal Mining & use of heavy machineries' The day of inspection 1 mine was found closed and no heavy machineries such as poclain, or any other heavy machinery were being used.
The current status of 09 sand mines located at River Narmada is as follows:
Sr. no Name of the Quantity CTO Quantity EC Consent Status mines (M3) (M validity driving
3) filed visit 1 Dhartikachhar 40000 40000 25.10.2021 Not in Sand Mine operation Khasra No. 01 Area 4.0 Hect 2 Belkhedi Sand 60000 60000 31.01.2022 Not in Mine operation Khasra No. 339, Area 13.450 hect 3 Dharampura 45000 45000 31.08.2022 Not in Sand Mine operation Khasra No. 415, Area 3.0 hect 4 Kushali Sand 42862 42862 31.08.2022 Not in Mine operation Khasra No. 481, Area 10.890 hect 5 Malkachar 57000 57000 31.05.2022 Not in Sand Mine operation Khasra No. 152, Area 2.0 hect 6 Neemkheda 60000 60000 30.04.2022 Not in Sand Mine operation Khasra No. 326, Area 22.070 hect 7 New Chargawa 25000 25000 31.05.2022 Not in Sand Mine operation Khasra No. 414, Area 22.070 hect 8 Sagda Jhapni 23000 23000 31.05.2022 Not in Sand Mine operation Khasra No. 415, Area 3.0 hect 9 Saliwada Sand 60000 60000 31.05.2022 Not in Mine operation Khasra No. 464, Area 4.0 hect A brief on the mining lease in River Narmada M/s Aaradhya Logistic Solution Pvt. Ltd., 1967 Right Town Jabalpur District- Jabalpur was awarded Jabalpur district 2 contract for sand mining as per the Madhya Pradesh Sand Mining Policy, 2019 in the year 2020 as per the tendering process. There are 16 mining leases is allotted out of l6 sand mine 09 sand mine located at River Narmada, remanding sand mine is located at River Hiran.
Field observations of the Committee
1. M/s Aaradhya Logistic solution Pvt. Ltd. has granted EC at river Narmada out of 16 Sand Mine for manual operation.
2. The Joint committee has visited the Sand Mines dated 30.11.2021 located at River Narmada. The committee first visit the sand mine at Village Sagda Jhapni located at Khasra No. 1/1 Area 2.023 Hect & Village- Saliwada located at Khasra No. 464 Area 4.0 Hect to verify the claims made by the applicant in the petition regarding the illegal Mining & use of heavy machineries. The day of inspection mine was found closed and no heavy machineries such as poclain, or any other heavy machinery were being used.
3. The Joint committee has visited the Sand Mines dated 04.12.2021 located at River Narmada. The committee first visit the sand mine at Village- Dhartikachar located at Khasra No. 01 Area 4.0 Hect & Village- Neemkheda located at Khasra No. 326 Area 22.070 Hect to verify the claims made by the applicant in the petition regarding the illegal Mining & use of heavy machineries. The day of inspection mine was found closed and no heavy machineries such as poclain, or any other heavy machinery were being used.
4. The committee has also visited the sand mine located at River Nannada Bhadpura Khasra No. Area 13.240. The mine has not granted EC and Consent for the same. During inspection mine was found not in operation.
5. On the day of field visit i.e.06112l?021, the sand mine Belkhedi located at Khasra No. 339 Area 13.450 Hect, Village- Kushli Khasra No. 481 Area 10.890 Hect & Village-New chargawa Khasra No. 414 Area 13.730 Hect. of Narmada river. The day of inspection mines was found closed and no heavy machineries such as poclain, or any other heavy machinery were being used.
6. No illegal pathway was found during the field visit in above sand mines.
37. The Plantation on the river bank was found poor for protection from soil erosion.
8. During inspection mining in two meter depth was observed in the village Sagda Jhapni and Saliwada Sand Mine. However it was not possible to committee to comments whether mine was done illegally are by the contractor.
9. The demarcation mining lease area was done in some places by the stone ports (Munare) The Mining Department has filed 04 Cases for illegal mining, 20 Cases for illegal stock and 149 cases for illegal transportation from the river Narmada during 2020-21 against the accused. There is no case reported against M/s. Aaradhya Logistic Solution Pvt. Ltd for illegal mining.
Recommendations:
i. District administration needs to ensure the effective vigilance on sand mining with respect to the mid-stream mining, use of heavy machineries by installing CCTV cameras at strategic location.
ii. To suppress the dust pollution during summer, and heavy vehicle transportation, contractor shall arrange regular water sprinkling, and ensure that the vehicle engaged in sand transportation and mining has valid PUC certificate. Contractor may also ensure that the transportation of the sand be done in covered vehicles.
iii. District administration has to initiate strict action as stipulated in O.A. 360/2015 against illegal mining & transportation, if any.
iv. The plantation on the river bank is to be done as per environmental management plan.
v. The demarcation of lease area should be visible from distance.
Mining department should ensure Stone post with Red flag, to make the lease area visible from distance.
vi. As per claims made by applicant in &e petition regarding the illegal Mining & use of heavy machineries along with photographs it is clear that the photographs & claims made by applicant which is mainly involved other than Jabalpur district. However some Sand Mine located at Narmada River 4 Inspected by committee in compliance of NGT order dated 29.10.2021."
3. The matter was again taken up on 07th February, 2022, and this Tribunal observed the deficiencies as follows:
"
i. On the day of inspection mine was found not in operation. ii. The committee submitted the status of 09 sand mines, which were found on the date of inspection as not in operation. iii. All above 09 units have environment clearance with Consent to Operate (CTO) and quantity of sand as envisaged in environment clearance has been mentioned in the report. iv. During inspection, mining in 2 meter depth was observed in the village. However, it was not possible for committee to comments whether mine was done illegally or by the contractor.
v. The demarcation of mining lease area by the stone ports (Munare) was done in some places.
vi. The mining department has filed 04 cases for illegal mining, 20 cases for illegal stock and 149 cases for illegal transportation from the River Narmada.
2. The perusal of report reveals the contradictory views on the point that on the day of inspection, there was no mining or there was no use of machinery or units were not in operation, in-spite of that there were mining in 02 meters depth and there were cases registered for illegal mining and transportation. We further observe that the concerned department, State Pollution Control Board failed to perform the duties sincerely, fairly and honestly by non-issue of show-cause notice or calculation and realisation of environmental compensation according to the parameters laid- down by the CPCB or the NGT in the matter of O.A. No. 360/2015 and there are continuous loss to the exchequer.
3. Learned counsel appearing for the State and the Pollution Control Board suggested the method of surveillance by CCTV camera. There are provisions in the MoEF&CC Guidelines i.e. Sustainable Sand Mining Management Guidelines, 2016 & The Enforcement and Monitoring Guidelines for Sand Mining issued in 2020 and there are specific directions from the Courts and this Tribunal for monitoring mechanism but the authorities for the reasons best known to them are not enforcing the guidelines and also are not making any surveillance and control on the illegal 5 sand mining or illegal transportation of sand mining. The guidelines issued by the MoEF&CC and the Rules framed thereunder in the Environment (Protection) Act, 1986 are required to be enforced strictly in letter and spirit by the authorities who are responsible to implement it. For the negligence of those to whom public duties have been entrusted, can never be allowed to cause public mischief. The report on the one hand that there is no mining and on the other hand there is a first information report for illegal mining and illegal transportation and mining up to the depth of 02 meters are the examples of gross violation of rules and failure of mechanism or enforcement agencies to enforce it, causing loss to the State revenue and promoting illegal sand mining.
4. Accordingly, we are of the view to hear personally the Regional Officer and Mining Officer concerned with regard to the contradictory report, on the point of loss of revenue, non- enforcement of the Rules and Guidelines issued by the MoEF&CC and also on the point that if there is no mining then what is use of Environment Clearance.
4. In view of the order dated 07.02.2022, the Regional Officer, State Pollution Control Board and Mining Officer were present during the course of hearing on 09.03.2022 and after hearing, this Tribunal observed as follows:
"The Regional Officer, State Pollution Control Board and Mining Officer are present and attended the proceeding on video conference. During the course of hearing nothing was replied by both the officers with regard to control of illegal mining and how to save the state revenue. There are more than 149 cases for illegal transportation from the River Narmada and there are 04 cases for illegal mining and 20 cases for illegal stock Inspite of that the report says that there is no mining on the date of inspection. Both the reports are self-contradictory. There are issues of environmental clearance but the officers posted there are of the view that there is no mining at all. On the one hand they say there is no mining and on the other hand they say that there is illegal transportation. Permitting the illegal transportation and illegal mining are directly causing loss to state revenue and thus both the officers are working against the State interest and helping the persons who are involved in illegal mining. Not a single case has been reported by the Regional Officer, Pollution Control Board in which environmental compensation has been realised or assessed.6
The concept of rule of law is that the State is governed by the law not by the man. The Constitution of India intended for India to be a country governed by the rule of law. It provides that the constitution shall be the supreme power in the land and the legislative and the executive derive their authority from the Constitution. For the negligence of those to whom public duties have been entrusted, can never be allowed to cause public mischief.
Through the perusal of the report it reveals that there are guidelines issued by the CPCB and the guidelines under rule framed and issued by State Government but inspite of all these things due to inaction on the part of the officers concerned in the district of Jabalpur, the illegal mining are continued, causing great loss to the state exchequer. The authorities at the district headquarter have permitted the illegal mining to be continued and not taken adequate action. The officers are the part and parcel of State machinery and the persons responsible to execute the law and ensure the existence of rule of law. The Mining Officer and the Regional Officer, Pollution Control Board have simply submitted the report and not taken any action.
When the law protector becomes the law violators, how law will be protected. The basic principle of rule of law is to follow rule/ law and not to break or violate it. For the negligence of those to whom public duties have been entrusted can never be allowed to cause public mischief. Public servants if committing wrong in discharge of statutory functions and later on if it was found not be in accordance with law within the knowledge of the officer concerned then it cannot be said to be the work and duty within the definition of State Act.
No action on illegal mining, transportation and storage is not only disregard to the law, but it is negation of the authority of the State by the public official doing the act and expending the budget in accordance with their wishes. An action specifically punitive action does lie for doing what the legislature has authorized if it is done negligently, carelessly and in violation of the law. Under our Constitution sovereignty vests in the people. Every limb of the constitutional machinery is obliged to be people oriented. No functionary in exercise of statutory power can claim immunity, except to the extent protected by the statute itself. Public authorities acting in violation of constitutional or statutory provisions are accountable for their behaviour before authorities created under the statute like the commission or the courts entrusted with responsibility of maintaining the rule of law. Each hierarchy in the Act is empowered to entertain a complaint by the consumer for value of the goods or services and compensation. Any act by any officer in violation of the rules is abuse of power, deliberate maladministration, and perhaps also other unlawful acts causing injury. The servants of the 7 government are also the servants of the people and the use of their power must always be subordinate to their duty of service. A public functionary if he acts maliciously or oppressively and the exercise of power results in harassment and agony then it is not an exercise of power but its abuse. No law provides protection against it. He who is responsible for it must suffer it. Compensation or damage as explained earlier may arise even when the officer discharges his duty mala-fidely and not in accordance with the guidelines, when it arises due to arbitrary or capricious behaviour then it loses its individual character and assumes social significance. Crime and corruption thrive and prosper in the society due to lack of public resistance. Nothing is more damaging than the feeling of helplessness. An ordinary citizen instead of complaining and fighting succumbs to the pressure of undesirable functioning in offices instead of standing against it. Therefore the award of compensation for harassment by public authorities not only compensates the individual, satisfies him personally but helps in curing social evil. It may result in improving the work culture and help in changing the outlook.
Absence of arbitrary power is the first essential of the rule of law upon which our whole constitutional system is based. In a system governed by rule of law, discretion, when conferred upon executive authorities, must be confined within clearly defined limits. The Rule of Law means that the decisions should be made by the application of known principles and rules, such decisions should be predictable and the citizens should know where he is. If decision is taken without any principle or without any rule, it is unpredictable and such decision is the anti-thesis of a decision taken in accordance with the Rule of Law. Even where there is no ministerial duty as above, and even where no recognised tort such as trespass, nuisance, or negligence is committed, public authorities or officers may be liable in damages for malicious, deliberate or injurious wrong-doing. There is thus a tort which has been called misfeasance in public office, and which includes malicious abuse of power, deliberate maladministration, and perhaps also other unlawful acts causing injury.
An ordinary citizen or a common man is hardly equipped to match the might of the State or its instrumentalities. That is provided by the rule of law. It acts as a check on arbitrary and capricious exercise of power.
The perusal of the report submitted by the Committee reveals total violation of Sustainable Sand Mining Management Guidelines, 2016 and the Enforcement and Monitoring Guidelines for Sand Mining, 2020 and there is no scientific and sustainable sand mining.8
In view of the above, we direct the Collector concerned to monitor personally and to direct the mining department and State Pollution Control Board to submit the report on the following points:
(a) The status of 09 sand mines located at river Narmada which is contained in the Joint Committee Report from Sr. no. 1 to 9 with regard to the quantity of EC permitted and the quantity of sand mines excavated and the revenue which has been deposited to the State Treasury.
(b) Total number of mining cases filed before the Court for prosecution.
(c) Total numbers with details of the mines permitted.
(d) List of the cases in which Show Cause Notice has been issued and the environmental compensation has been assessed and realised with details in the districts.
(e) Total number of cases and amount in which the penalty has been realised by the Mining Department and the amount has been deposited in the State Treasury with the Challan number.
(f) Total quantity excavated by the illegal mining, who have deposited the fund and the value of the illegal mining.
(g) Action taken by the State Pollution Control Board for illegal transportation and the seizure of the vehicle involved in the illegal transportation and the penalty of realese in accordance with the parameter laid down by the CPCB as mentioned in the case of O.A. No. 360 of 2015 decided by the Principal Bench of this Tribunal.
(h) Suggestions by the department to control the illegal mining.
The further Action Taken by the State Pollution Control Board and the Mining Department must be submitted before the next date of hearing.
5. In compliance thereof, Action taken Report has been filed by the Respondents.
We have heard learned counsel for the parties and perused the record.
6. Sh. Sachin K. Verma had submitted the reply on behalf of most of the respondents starting from R-2 to R-27 and R-11 and R-12 which are similar in nature as follows:
"The State Government of Madhya Pradesh had imposed a complete ban on sand mining in Narmada river vide order dated 22/05/2017 thereafter, after imposing certain regulations has again allowed sand mining in Narmada 9 River by manual method and practice of sand mining in River Narmada and whenever any incident of using or utilizing heavy machineries for excavation of sand in River Narmada is reported penal actions is initiated against the culprits/violators.
Under rule 3(6) of the Rules of 2019 the Government of Madhya Pradesh has imposed complete ban on sand mining particularly for River Narmada The relevant rule is quoted below:-
"There shall be complete ban on mining, loading and storage of sand by machines from the sanctioned quarries in river Narmada. Sand mining, loading and storage from quarries having area upto 5.00 hectare situated on other rivers shall be done by the committee of local labourers and quarries having area more than 5,000 hectare, local labourers shall be given priority for sand mining, loading and storage. The use of machines for sand mining in other rivers may be given depending upon the requirement and approval in mining plan and environmental clearance."
7. It has further been submitted that the State has complied the guidelines issued by the MoEF & CC which is as follows:
IMPACT S.NO. ENVIRONMENTAL CONDITIONS PRESENT STATUS IN CATEGORY THE STATE OF MADHYA PRADESH Stakeholder 1. In the case of private land not owned by the Compliant lease holder an affidavit Engagement should be Engagement obtained regarding consent of the concerned land owner (s) for carrying out the mining operation.
2. Stakeholder awareness and ability to raise Compliant concerns and getting it to be addressed.
3. Implementation of Action Plan on the issues Compliant raised during the Public Hearing. The Proponent shall complete all the tasks as per the Action Plan submitted with the budgetary provisions during the Public Hearing.
4. Having valid lease and all the permits is very Compliant 10 much needed.
5. To establish a Monitoring Committee including Local Panchayat, to check on traffic due to transportation and submit an annual report on the same.
6. The directions given by the Hon'ble Supreme Compliant Court of India vide order dated 27.02.2012 in Deepak Kumar case [SLP(C) Nos. 19628-19629 of 2009] and order dated 05.08.2013 of the Hon'ble National Green Tribunal in application No. 171/2013 may be strictly followed.
7. All the provisions made and restrictions Compliant imposed as covered in the Minor Mineral Rule, shall be complied with, particularly regarding Environment Management Practices and its fund management and Payment of compensation to the land owners.
Sustainable 8. District level Survey Report should be prepared Compliant and area suitable for Mining and area prohibited Mining for mining be identified.
Practices
9. The depth of mining in Riverbed shall not Compliant exceed one meter or water level whichever is less, provided that where the Joint Inspection Committee certifies about excessive deposit or over accumulation of mineral in certain reaches requiring channelization, it can go up to 3 meters on defined reaches of the River.
10 No River sand mining be allowed in rainy Compliant season.
11 To submit annual replenishment report certified Compliant
by an authorized agency. In case the
replenishment is lower than the approved rate of production then the mining activity / production levels shall be decreased / stopped accordingly till the replenishment is completed.
12 Ultimate working depth shall be up to 3.0 m Compliant from Riverbed level and not less than one meter from the water level of the River channel whichever is reached earlier. In hilly terrain this depth be preferably restricted to one meter 13 In River flood plain mining a buffer of 3 meter to Under Consideration be left from the River bank for mining.
14. In mining from agricultural field a buffer of 3 Under Consideration meter to be left from the adjacent field.
15. Mining shall be done in layers of 1 meter depth Under Consideration to avoid ponding effect and after first layer is excavated, the process will be repeated for the next layers.
1116. To maintain safety and stability of Riverbanks Under Consideration i.e. 3 meter or 10% of the width of the River whichever is more will be left intact as no mining zone.
17. No stream should be diverted for the purpose of Compliant sand mining. No natural water course and/ or water resources are obstructed due to mining operations.
18. No blasting shall be resorted to in River mining Compliant and without permission at any other place.
19. Depending upon the location, thickness of sand, Compliant deposition, agricultural land/Riverbed, the method of mining may be manual, semi-
mechanized or mechanized; however, manual method of mining shall be preferred over any other method.
Identification and 20. Mining should be done only in area / stretch Compliant Preparation of identified in the District Level Survey Report Mining site suitable for mining and so certified by the Sub Divisional Level Committee after site visit
21. Mining should begin only after pucca pillar Compliant marking the boundary of lease area is erected at the cost of the lease holder after certification by the mining official and its geo coordinates are made available to the District Level Committee.
22. The top soil in case of surface land mining shall Compliant be stored temporarily in an earmarked site and concurrently used for land reclamation Monitoring the 23. The EC holder shall keep a correct account of Compliant Mining of Mineral quantity of mineral mined out, dispatched from and its the mine, mode of transport, registration Transportation number of vehicle, person in-charge of vehicle and mine plan. This should be produced before officers of Central Government and State for inspection
24. For each mining lease site the access should be Compliant controlled in a way that vehicles carrying mineral from that area are tracked and accounted for.
25. The State / District Level Environment Compliant Committee should use technology like Bar Coding, Information and Communications Technology (ICT), Web based and ICT enabled services, mobile SMS App etc. to account for weight of mineral being taken out of the lease area and the number of trucks moving out with the mineral.
1226. There should be regular monitoring of the Compliant mining activities in the State to ensure effective compliance of stipulated EC conditions and of the provisions under the Minor Mineral Concessions Rules framed by the State Government.
Noise 27. Noise arising out of mining and processing shall Compliant
be abated and controlled at source to keep
Management
within permissible limit.
28. Restricted working hours. Sand mining Under Consideration
operation has to be carried out between 6 am to 7 pm. Air Pollution and 29. The pollution due to transportation load on the Compliant Dust environment will be effectively controlled and water sprinkling will also be done regularly. Management
30. Air Pollution due to dust, exhaust emission or Compliant fumes during mining and processing phase should be controlled and kept in permissible limits specified under environmental laws.
31. The mineral transportation shall be carried out Under Consideration through covered trucks only and the vehicles carrying the mineral shall not be overloaded. Wheel washing facility should be installed and used.
Management of 32. The mining operations are to be done in a Under Consideration Visual Impact systematic manner so that the operations shall create a major visual impact on the site.
Bio-Diversity 33 Restoration of flora affected by mining should be Under Consideration done immediately. Twice the number of trees Protection destroyed by mining to be planted preferably of indigenous species. Each EC holder should plant and maintain for lease period at least 5 trees per hectare in area near lease.
34. No mining lease shall be granted in the forest Compliant area without forest clearance in accordance with the provisions of the Forest Conservation Act, 1980 and the rules made thereunder.
35. Protection of turtle and bird habitats shall be Compliant ensured.
36. No felling of tree near quarry is allowed. For Compliant mining lease within 10km of the National Park / Sanctuary or in Eco-Sensitive Zone of the Protected Area, recommendation of Standing Committee of National Board of Wild Life (NBWL) have to be obtained as per the Hon'ble Supreme Court order in I.A. No. 460 of 2004.
37. Spring sources should not be affected due to Compliant mining activities. Necessary Protection 13 measures are to be incorporated Management of 38. 8 Removal, stacking and utilization of top soil in Under Consideration Instability and mining are should be ensured. Where top soil Erosion cannot be used concurrently, it shall be stored Erosion separately for future use keeping in view that the bacterial organism should not die and should be spread nearby area.
39. The EC should stipulate conditions for adequate Compliant steps to check soil erosion and control debris flow etc. by constructing engineering structures
40. Use of oversize material to control erosion and Compliant movement of sediments
41. No overhangs shall be allowed to be formed due Compliant to mining and mining shall not be allowed in area where subsidence of rocks is likely to occur due to steep angle of slope.
42. No extraction of stone / boulder / sand in landslide prone areas.
43. Controlled clearance of riparian vegetation to be Compliant undertaken Waste Management 44. Site clearance and tidiness is very much needed Compliant to have less visual impact of mining.
45. Dumping of waste shall be done in earmarked Compliant places as approved in Mining Plan
46. Rubbish burial shall not be done in the Rivers. Compliant Pollution 47. The EC holder shall take all possible Compliant Prevention precautions for the protection of environment and control of pollution.
48. Effluent discharge should be kept to the Compliant minimum and it should meet the standards prescribed.
Protection of 49. Mining shall not be undertaken in a mining Compliant Infrastructure lease located in 200-500 meter of bridge, 200 meter upstream and downstream of water supply / irrigation scheme, 100 meters from the edge of National Highway and railway line, 50 meters from a reservoir, canal or building, 25 meter from the edge of State Highway and 10 meters from the edge of other roads except on special exemption by the Sub-Divisional level Joint Inspection Committee.
50 For carrying out mining in proximity to any Compliant bridge or embankment, appropriate safety zone (not less than 200 meters) should be worked out on case to case basis, taking into account the structural parameters, location aspects and flow rate, and no mining should be carried out in the safety zone so worked out.
1451 Mining activities shall not be done for mine Compliant lease where mining can cause danger to site of flood protection works, places of cultural, religious, historical, and archeological importance.
Enhancement Road 52 Vehicles used for transportation of sand are to Compliant Safety be permitted only with of fitness and PUC Certificates.
53 Junction at takeoff point of approach road with Compliant main road be properly developed with proper width and geometry required for safe movement of traffic by concession holder at his own cost.
54 Project Proponent shall ensure that the road Compliant may not be damaged due to transportation of the mineral; and transport of minerals will be as per IRC Guidelines with respect to complying with traffic congestion and density.
55 No stacking allowed on road side along National Compliant Highways.
Closure and 56 The Project Proponent shall undertake phased Not required Reclamation of restoration, reclamation and rehabilitation of Mined Out Area land affected by mining and completes this work before abandonment of mine.
57 Restoration, reclamation and rehabilitation in Compliant cluster should be done systematically and jointly by each EC holder in that cluster. This should be appropriately reflected as EC condition in each EC in cluster.
58 Site specific plan with eco-restoration should be Compliant in place and implemented Health and Safety 59 Health and safety of workers should be taken Compliant care of.
60 Transport of mineral will not be done through Compliant villages / habitations.
61 The Project Proponent shall make arrangement Compliant for drinking water, first aid facility (along with species specific anti-venom provisioning) in case of emergency for the workers.
62 Project Proponent shall implement the Disaster N.A. Management Plan if the mine lease area is located in Seismic Zone-IV. Project Proponent shall appoint a Committee to have a check over any disaster to warn workers well before for the safety of the workers. Emergency helpline number will be displayed at all levels.
63 Project Proponent shall appoint an Occupational Under Consideration Health Specialist for Regular and Periodical medical examination of the workers engaged in the Project and records maintained; also, Occupational health checkups for workers 15 having some ailments like BP, diabetes, habitual smokers, etc. shall be undertaken once in six months and necessary remedial/preventive measures taken accordingly. Recommendations of National Institute for Labour for ensuring good occupational environment for mine workers would also be adopted.
Monitoring the 64 The Project Proponent shall report monitoring Compliant Impact of Mining data on replenishment, traffic management, levels of production, River Bank erosion and maintenance of Road etc. Mineral 65 Use of alternate material such as M-sand in Partly implemented in Conservation place of natural River sand shall be encouraged Govt. projects in order to reduce stress on natural eco-system.
8. It is further submitted that in the financial year 2021-22, the District Mining Branch Raisen has registered 28 cases for illegal mining and the penalty of Rs 24,27,439/- is recovered. Further, in the financial year 2021-22 for illegal transportation 102 cases are registered against the vehicle owner/driver and the penalty of Rs 29, 60,000/-within the provisions of Rule 20 of the Madhya Pradesh Sand (Mining, Transportation, Storage and Trading) Rule 2019 is recovered and 130 cases were registered by the District Mining Branch in District Raisen against the violators wherein the total amount of penalty of Rs 53,67,439/-is recovered from the violators.
9. The reply on the same facts has been filed by the Respondent No. 28. Learned counsel appearing for the CPCB has submitted that implementations of the laws are with the statutory authorities of the State Government and they are enforcing the rules.
10. The Action Taken Report submitted by the R-6 and R-7 reveals that the sand mining lease granted has been terminated and fresh process has been initiated. It is further submitted that District Mining Branch Jabalpur has initiated prosecution lodged First Information Report against 168 persons engaged in illegal escalations, transportation or stocking of sand and minerals, details of which has been attached with the reply. The State Government, Department of Mineral and Resources has introduced a new rule to initiate stringent panel action against illegal mining activity to protect the environment by recovery of penalty for the damage to the environment. The details of 16 environmental compensation for the illegal mining as provided by the Department are quoted below:
dk;kZy; dysDVj [kfut 'kk[kk ftyk tcyiqj ¼e-iz½ vFkZ'kkfLr ,oa voS/k i;kZoj.kh;
iz- [kfut dk i;kZoj.kh;
pkyku Ø- fnukad [kfut vFkZ'kkfLr iz'keu {kfriwfrZ rFkk
dz- uke {kfriwfrZ
ek=k izdj.k iz'keu
jkf'k
1 MPTURN200420220011894 20/04/2022 jsr 4-?k-eh 7200 80000 1000 88200
2 MPTURN200420220002372 20/04/2022 jsr 5-?k-eh 9375 71429 1000 81804
3 MPTURN260420220005587 26/04/2022 MksyksekbZV 5-?k-eh 7500 30625 1000 39125
4 MPTURN250420220005361 25/04/2022 fxV~Vh 2-?k-eh 3600 28571 1000 33171
5 MPTURN250420220012411 25/04/2022 jsr 3-?k-eh 5625 25000 1000 31625
6 MPTURN3004202220003999 30/04/2022 eq:e 14-?k-eh 10500 200000 1000 211500
7 MPTURN270420220007208 27/04/2022 eq:e 3-?k-eh 2250 54545 1000 57795
8 MPTURN270420220007208 27/04/2022 eq:e 14-?k-eh 10500 200000 1000 211500
9 MPTURN3004202220004081 30/04/2022 jsr 3-?k-eh 5625 25000 1000 31625
1
0 MPTURN280420220007080 28/04/2022 eq:e 14-?k-eh 10500 200000 1000 211500
1
1 MPTURN3004202220003082 30/04/2022 eq:e 14-?k-eh 10500 200000 1000 211500
1
2 MPTURN300420220002342 30/04/2022 jsr 4-?k-eh 7500 80000 1000 88500
1
3 MPTURN200420220011898 20/04/2022 jsr 3-?k-eh 5625 50000 1000 56625
96300 1245170 13000 1354470
e/;izns'k [kfut ¼ voS/k [kuu]ifjogu rFkk Hk.Mkj.k dk fuokj.k ½ fu;e 2022 dk la'kks/ku jkti= esa la'kks/ku fnukad 08@04@2022 ds ckn ls {kfriwfrZ jkf'k tek djkbZ tk jgh gSA
11. It is further submitted that for steps to curb and control the illegal sand mining activities the District Mining Jabalpur has sanctioned permission for sand stone crushing units which is the best available substitute to the river sand so as to cater and shift the river sand supply load for the construction activities, the district mining branch Jabalpur has accorded 4 such permission for sand stone crushing units. The District Mining Branch, District Jabalpur has decided to install solar CCTV cameras in the sand mining blocks so as to monitor and regulate the sand mining activities, the contractor will be solely responsible for the maintenance, management and installation of the CCTV cameras to be installed at sand mining blocks and further will also ensure the safety of CCTV cameras. The contractor will provide direct real time footage/link to the District Mining Branch Jabalpur of all CCTV cameras and has been directed to report the State Government District Collector (Mines) in case of any damage or failure of CCTV cameras.
1712. In light of the facts, necessary compliance has been taken by the State and Environmental Compensation has been assessed and realized. The perusal of the report reveals that the SPCB has not taken any action for calculation and realization for environmental compensation from the date of violation of the law till the date of continuance as directed in Original Application No. 360/2015 (PB of this Tribunal) or in accordance with CPCB guidelines.
13. Accordingly, we direct the State Pollution Control Board to see the matter and ensure that the environmental compensation must be assessed from the date of violation of the law till its continuance and ensure that the environmental compensation must the realized and credited to the relevant account.
14. Directions issued in Appeal No. 25 of 2011 titled as Prabhat Mohan Pandey Vs. MP SEIAA must also be strictly observed. In view of the above, Original Application No. 78 of 2021 stands disposed off accordingly. [ Sheo Kumar Singh, JM Dr. Arun Kumar Verma, EM 10th May, 2022 O.A. No.78/2021(CZ) PU 18