Supreme Court of India

Kanoria Chemicals And Industries Ltd. ... vs State Of U.P. And Ors. And Vice Versa on 16 January, 1992

Equivalent citations: 1992 SCR (1) 151, 1992 SCC (2) 124, AIRONLINE 1992 SC 77, 1992 (2) SCC 124, (1992) 1 JT 199, (1992) 1 RRR 281, (1992) 1 JT 199 (SC), (1992) 1 SCR 151 (SC)

Bench: M. Fathima Beevi, S.C. Agrawal, R.M. Sahai

           PETITIONER:
KANORIA CHEMICALS AND INDUSTRIES LTD. AND ANR.

	Vs.

RESPONDENT:
STATE OF U.P. AND ORS. AND VICE VERSA

DATE OF JUDGMENT16/01/1992

BENCH:
RANGNATHAN, S.
BENCH:
RANGNATHAN, S.
FATHIMA BEEVI, M. (J)
OJHA, N.D. (J)
REDDY, K. JAYACHANDRA (J)
AGRAWAL, S.C. (J)
SAHAI, R.M. (J)
SAHAI, R.M. (J)

CITATION:
 1992 SCR  (1) 151	  1992 SCC  (2) 124
 JT 1992 (1)   199	  1992 SCALE  (1)107


ACT:
	  : Electricity (Supply) Act, 1948: Section 60	(As
introduced by section 7 of Electricity Laws (U.P. Amendment)
Act, 1983.
	   : Company-Electricity Board-Contract for  supply
of   electricity   at	concessional   rates   on    special
considerations-Power  of Electricity Board to revise  rates-
U.P.  Gazette Notification dated  29.10.82-Schedule-Levy  of
HV-2  rates i.e. uniform tariff applicable to  "bulk  power"
consumers  in substitution of contracted rates-Validity	 of-
Held  fixation of rates was not vitiated-Revision  of  rates
can  be	 given retrospective effect-Failure to	specify	 the
precise	 manner in which the rates were arrived at does	 not
vitiate	 the  rates  fixed-Power or  revise  tariff  can  be
exercised  more	 than once-Electricity Board can  fix  rates
higher	than HV-2 rates-But levy of rates higher  than	HV-2
rates	on  the	 Company  held	not  justified	 under	 the
circumstances.
     Section 49-Electricity Board-Revision of  rates-Factors
to be taken into account-Distinction between section 49	 and
60 explained.
     Electricity Laws (U.P. Amendment) Act, 1983 (Act 12  of
1982) : Section 7-Difference in English and Hindi version of
Act, Absence of words "for this first time" in Hindi version
of Act-Effect of.



HEADNOTE:
    The appellant-company set up a caustic soda industry at
Renukoot  involving the use of electricity as the  main	 raw
material.   On 30.9.63 it entered into a contract  with	 the
State  of  Uttar Pradesh for supply of electricity  for	 the
period of 25 years from 1.4.64, to the extent of 6.5 NW from
the  Rihand Hydel station at a fixed rate of 2.5  paise	 per
unit  and  an  additional supply of 1.5 NW  from  an  inter-
connection  at the rate of 5 NP per unit.  The terms of	 the
contract  provided  that the transmission  and	distribution
losses	were to be borne by the company and that  the  rates
could  be raised after sixteen years but any enhancement  in
rates  was  not to exceed 10 per cent of  the  rates  agreed
upon.
     Subsequently, the UP Government enacted the Electricity
Laws  (Uttar  Pradesh Amendment) Act, 1983 which  came	into
force from
						       152
20.5.1983.  Section 7 of the said Act amended section 60  of
the  Electricity Supply Act, 1948 by  inserting	 sub-section
(3)  to	 (5) with retrospective effect from April  1,  1965.
The  Amended Act enabled the State and the Board  to  modify
the  rates of supply of Electricity to appellant  under	 the
contract  of  30.9.63.	Simultaneously the  Parliament	also
amended Section 59 of the Electricity Supply Act by the	 Act
18 of 1983 enabling the Electricity Board to fix the  tariff
in such a way so as to build up a statutory surplus fixed by
the State Government.
     On	 the passing of the Amendment Act,  the	 Electricity
Board  informed	 the appellant-company that the	 rates	were
proposed to be revised and later it informed the  appellant-
company that on 28.9.83 the State Government, by its Gazette
Notification dated 29th October, 1982, had approved the levy
of  HV-2  rates	 (i.e. uniform tariff  applicable  to  `Bulk
power' consumers) in substitution of the rates mentioned  in
the  agreement of 30th September, 1963.	 The effect  of	 the
revision  was to oblige the appellant-company to  pay  57.71
paise  per  unit for 1983-84 and 61.60 paise  per  unit	 for
1984-85.   Accordingly,	 supplementary	bills  were   raised
demanding  Rs. 3.07 crores from the appellant-company.	 The
appellant  filed  a  writ  petition in	the  High  Court  of
Allahabad  assailing  the  Validity  of	 section  7  of	 the
amending  Act  and  the right of the Board  to	enhance	 the
rates.
     By	 its order dated 2.4.87 the High Court	allowed	 the
writ  petition and quashed the approval dated 28.9.83  given
by   the  State	 Government  to	 the  new  rates   and	 the
consequential  demands of the Electricity Board but left  it
to  the	 Board	and State to fix  revised  rates  afresh  by
directing  the	respondents (1) not to	charge	the  uniform
tariff	rate  for the period beginning from 20th  May,	1983
till  the rates were fixed in accordance with section  60(5)
(a);  and (ii) that the rates applicable to  the  appellants
should	be  determined	having	regard	to  the	  individual
circumstances of the appellant.
     The   Electricity	Board  and  the	  State	  Government
preferred  an appeal to this Court.  Aggrieved by  the	fact
that in applying the HV-2 rates the Board and the State	 had
not  taken into account the special factors relevant to	 the
supplies  made to it, the appellant also filed an appeal  in
this Court.
     In the meantime, pursuant to the directions of the High
Court  the Board fixed the revised rates on 28.3.88 for	 the
supply	from 20th May, 1983 which were much higher than	 the
HV-2 rates fixed earlier and
						       153
quashed by the High Court.
     The appeals came to be heard by this Court on April 10,
1991 when this Court directed that the appellant should make
a representation to the State Electricity Board setting	 out
the individual factors which should be taken into account in
fixing	the rates applicable to them within the	 meaning  of
section	 60(5)	(a)  of	 the 1948 Act  and  that  the  State
Government should reconsider the fixation after	 considering
the  recommendations  made  by	the Board  as  well  as	 the
representations of the appellant.
     Accordingly  the State reconsidered the matter  and  by
its  order  dated 31.8.92 approved the rates  fixed  by	 the
State Government on 28.3.88.
     The  appellant  challenged the validity  of  the  rates
fixed  contending  that	 (i) the fixation  of  rates  as  on
31.8.1992 was not valid because (a) the respondents have not
complied  with	this court's directions dated  10.4.1991  as
they  have neither disclosed the factors based on which	 the
rates were revised in March 1988 nor indicated the  monetary
incidence  or impact of the factors taken into account;	 (b)
in  the	 process  of refixation of the rates  there  was  no
genuine exercise to consider relevant factors in determining
the  rate under section 60 (5) (a); (c) that the  Board	 had
not  set out anywhere the precise manner in which the  rates
recommended by them were arrived at; (ii) Section 60  cannot
be interpreted so as to give power to the Board to fix rates
retrospectively because (a) such an interpretation precludes
the   Board   and  the	State  from   revising	 the   rates
prospectively;	(b)  if the power is held  exercisable	more
than   once,  it  will	permit	successive  revisions	each
superseding  the earlier one, a position that could lead  to
harassment; (c) that the Hindi version of the Amendment	 Act
is  differently worded and does not contain the	 words	"for
the first time" found in the English version and in case  of
a conflicting version between Hindi and English version	 the
Hindi text should be the key to find out the true  intention
of  the Legislature; and (iii) in view of a facts  (a)	that
the  company established its industry in a backward area  at
the  request  of the State and in public interest;  (b)	 the
transmission  and  distribution	 losses	 are  borne  by	 the
appellant  and (c) electricity is one of the  raw  materials
needed for its industry the appellant should be charged less
than the HV-2 rates.
     On	 behalf	 of the Electricity Board it  was  contended
that the
						       154
demand of rates higher than HV-2 rates was justified because
(a)  the  Company has been getting substantial	supplies  of
electricity  at	 nominal rates from 1963 to  1983;  (b)	 The
Board has incurred heavy losses over the years by  supplying
electricity  at	 concessional  rates; and (c)  there  was  a
necessity  to  build up a statutory  surplus  prescribed  by
section 59.
     Allowing  the Company's appeal in part  and  dismissing
the Electricity Board's appeal, this Court,
     HELD: 1.The fixation of revised rates is not  vitiated.
[173-E]
     2.	 Section 60 does not require the Board or the  State
Government   to	  explain  each	 and  every  step   in	 its
calculation.  All that the Electricity Board has to do is to
take  into consideration the factors relevant under  section
60(5)	and  propose  rates  for  fixation  to	 the   State
Government.    It   is	in  order  to  ensure	that   these
recommendations take into account all relevant factors	that
an opportunity has been provided to the consumer to  satisfy
the Board as well as the State Government that the  fixation
has taken into account certain relevant factors.  Therefore,
the  rate  revision proceedings were not  vitiated  for	 the
reason that the Board has not set out the precise manner  in
which the rates recommended by them were arrived at. [172 D-
E, 172-C]
     2.1  Apart	 from the general factors  which  have	been
taken  into account in fixing the general tariff rates,	 the
Board has, in making its recommendations, taken into account
the purpose  for which supply was required by the  appellant
along  with the factor of recurring losses incurred  by	 the
Board  year  after year and its	 statutory  requirements  to
maintain  a minimum surplus of 3 per cent as required  under
section 59 of the Supply Act, 1948. [173-D]
     2.2  The  rates recommended by  the  State	 Electricity
Board  and approved by the State Government were within	 the
knowledge  of the appellant-company.  The  appellant-company
filed	 its   representation.	  After	  considering	 the
representation,	 the Board made its recommendations  to	 the
State Government and a copy of the recommendations were also
available   to	the  appellant.	  The  appellant  had	full
opportunity  to	 meet  the various points  set	out  in	 the
recommendations	 of  the Board.	 The comments  of  both	 the
Board and the Appellant were taken into account by the State
Government before finally approving of the rates proposed by
the   Board.  Therefore,  the  appellant-company  had	full
opportunity  to	 place all its special	feature	 before	 the
Board and the
						       155
State Government. [171H, 172A,B, 173E]
      2.3 If one compares the two provisions viz. sections 49
and 60 one will find that most of the elements are common to
the two provisions. Both under section 49 and section 60 the
authorities  have  to  take into  account  the	geographical
position  of any area, the nature of supply and purpose	 for
which supply is required and any other relevant factor.	 The
only  difference  between the two provisions is	 that  since
section 49 deals with a general fixation while section 60(5)
deals  with  a fixation for a  particular  individual  case,
there  may be some special factors to be taken into  account
which  may  or may not be germane while fixing	the  general
tariff under section 49. [172H, 173-A]
     Indian   Aluminium	  Company  Ltd.	 v.   Kerala   State
Electricity Board, [1976] 1 S.C.R. 70; cited.
     3.	 A retrospective effect to the revision of rates  is
clearly	 envisaged by section 60. One can easily conceive  a
weighty	  reason  for  saying  so.  If	the   section	were
interpreted   as  conferring  a	 power	of   revision	only
prospectively, a consumer affected can easily frustrate	 the
effect of the provision by initiating proceedings seeking an
injunction  restraining	 the  Board  and  thus	getting	 the
revision  deferred indefinitely. Or, again, the revision  of
rates, even if effected promptly by the Board and State, may
prove  infructuous for one reason or another. Therefore,  it
would be a very impractical interpretation of the section to
say  that  the revision of rates can  only  be	prospective.
[174E-G]
     3.1 The mandate of section 60 is only that the rates to
be  charged on supplies for which payment becomes due  after
20.8.83	 shall be as fixed by the Board.  The powers of	 the
Board  in  fixing the rates-including the dates	 from  which
they  will  be operative are not restricted in	any  manner.
The Board is at complete liberty to fix different rates from
different  dates  and that scheme of fixation will  be	read
with  the contract.  Only the Board cannot revise the  rates
in respect of supplies for which payment under the  contract
fell due before the Amendment Act came into force. [175-B-C]
     3.2 The power under section 60 is exercisable more than
once.	However,  while making a  subsequent  revision,	 the
authorities  will  not	normally  tamper  with	an   earlier
revision  or alter the dates of effectiveness fixed for	 the
earlier	 revision without a valid reason to do so.  If	this
is  done,  it will be open to a court to examine  the  basis
thereof and
						       156
sustain	 it only where the earlier fixation was based on  an
error	or  misconception  or  the  like  and	called	 for
modification. [175D-E]
     3.3 Although the Hindi version of the Amendment Act  is
differently  worded and does not contain the words "for	 the
first time" found in the English version, the Hindi  version
does  not  really  alter the position; actually	 it  is	 the
presence  of the words "for the first time" in	the  English
version	 that  create ambiguity.  Without these	 words,	 the
clause clearly provides that all supply of electricity,	 for
which payment is to be made after 20.5.83, i.e. coming	into
force of the Amendment Act, will be charged at the rates  to
be fixed by the Board.	Therefore, the fixation by the Board
of rates from 20.5.83, and, at different rates for different
period of time, is unexceptionable. [175F-H, 176-A]
     Mata Badal Pandey v. Board of Revenue, (1974)  U.P.T.C.
570; referred to.
     4.	 There are no obstacles, statutory  or	theoretical,
standing  in  the  way of the Board  fixing  rates  for	 the
company	 which will be higher than the rates  applicable  to
bulk consumers.	 The provision in s. 60(5)(a) is intended to
enable	the Board and State to cut off the shackles cast  by
an  ancient contract entered into at a time when  conditions
were   totally	different.   It	 confers  an  absolute	 and
unrestricted  enabling	power  to revise  the  rates  in  an
appropriate manner. [174-A]
     While  revising  rates, the only limitation  which	 the
statute	 requires  the authorities to keep in mind  are	 the
factors mentioned in the section.  Whether the revised rates
for the consumer governed earlier by the contract should  be
higher	or lower than, or equal to, the tariff	rates  would
depend	on a large number of considerations, in	 particular,
the  basis on which, and the point of time at  which,  those
general	 rates	were  fixed.   In  principle,  it  is  quite
conceivable that, in an appropriate case, a consideration of
the relevant factors may justify even a rate higher than the
general tariff rates intended for the particular category of
consumers. [174B-D]
     4.1  However,  there  is no  material  to	justify	 any
departure from the HV-2 rates in the case of the  appellant.
The  special circumstances pleaded by the  appellant-company
have  lost their importance with the passage of	 time.	 The
conditions  that  prevailed in 1963 are not  valid  and	 the
appellant  has	had the benefit of  concessional  rates	 for
twenty years.  The consideration that electricity is a	"raw
material" in the assesee's
						       157
business  is, again irrelevant for it can mean nothing	more
than  that the appellant needs substantial quantities of the
energy	and there is no reason why it should not pay for  it
at the normal market rates.  Therefore, the appellant has no
valid justification for staking a claim to less than the HV-
2 rates. [177B-D]
     4.2 Equally, the authorities have no case to raise	 the
rates beyond the HV-2 rates.  The huge losses that the Board
has  been  incurring  and the  statutory  justification	 for
escalation  in	the rates keeping in view the  necessity  to
build  up  a surplus is an aspect of  working  which  should
affect all the consumers equally.  May be the Board can,  in
appropriate circumstances, seek to make up for a part of the
losses by hiking up the rates to one particular category  of
consumers  but	that  would not be  justified  here  as	 the
transmission  and  distribution	 losses in  respect  of	 the
supply to the appellant are borne by it and, in the  absence
of  some special vital reason, it would not be equitable  to
fix  the  rates of supply to the appellant above  the  rates
applicable to other HV-2 consumers.  Therefore, there is  no
justification  to  charge  more than  HV-2  rates  from	 the
appellant. [177EG, 178-B]
     4.3  The  determination of 1988 and 1991  are  quashed.
The  State  Electricity	 Board is  directed  to	 charge	 the
appellant-Company from 20.5.83 to 31.3.89 at the HV-2  rates
applicable to other consumers. [178-B]



JUDGMENT:

CIVIL APPELLATE JURISDICTION: Civil Appeal No. 1306 of 1988.

From the Judgment and Order dated 2.4.1987 of the Allahabad High Court in Writ Petition No. 1818 of 1984.

H.N. Salve, P.P.Tripathi, Manoj Swarup and K.J. Johan for the Appellants.

B.Sen, Gopal Subramaniam, Prashant Kumar and Mrs. S. Dikshit for the Respondents.

The Judgment of the Court was delivered by RANGANATHAN, J. There was a time when, in almost every State in India, people were invited to avail of the supply of the electric energy produced in the State and offered special concessions when they agreed to 158 do so in bulk under long-term contracts. A situation, however, has since developed when the demand for the energy increased so rapidly that, despite the quantity of available electric energy also having gone up tremendously the rates of supply agreed upon became uneconomical. The State and its instrumentalities, who were supplying the energy, found themselves without power to revise the rates to meet the altered situation until the legislature came to the rescue. It is this situation in the case of Kanoria Chemicals and Industries Ltd. (hereinafter referred to a `the appellant') which has given rise to these appeals.

The Electricity (Supply) Act, 1948, (hereinafter referred to as `the 1948 Act') entrusted the control over the generation and distribution of electric energy to Electricity Boards constituted under the Act. In the State of Uttar Pradesh, the U.P. State Electricity Board (hereinafter referred to as `the Board,) was constituted on 1.4.1959. At that time, the State Government (hereinafter referred to as `the State') was in the process of establishing the Rihand Hydro-Electric Generating Plant, which become operational w.e.f. 1.2.62, and attained an ultimate installed capacity of 300 M.W. The control of this remained with the State till 31.3.1965. Since the supply of electrical energy was then available in abundance and only the eastern area of the State was served by the plant, the State considered it expedient to enter into contracts with bulk purchasers both with a view to ensure maximum utilisation of the electricity available and with a view to the industrialisation of the eastern areas of the State. In particular the State was keen on the industrial development of the district of Mirzapur, which was considered to be an extremely backward area. The State was keen that power intensive units be set up in close proximity of Rihand so that electricity could be supplied to these units from the Rihand power plant. One feature of the supply of electricity from Rihand was that the metering was done at the point of generation so that transmission and distribution losses and costs could be borne by the consumers of electricity.

The appellant set up an industry for manufacture of caustic soda at Renukoot sometime in 1964. According to the appellant, this industry involved the use of electricity as the main raw material, the other raw material needed being salt. It is said that there were considerable disadvantages in setting up the proposed caustic soda unit in the district of Mirzapur, principally due to its distant location from areas from which salt had to be transported. The appellant, it is said, could easily have set up its factory in some other State with greater facilities and advantages but it was induced to set up the caustic soda plant at Pipri in the district of Mirzapur on account of the assurance given by the State that it will supply hydro electric 159 power to the assessee from the Rihand power plant on a long term basis at a cheap rate. It is claimed that, but for this promise, the appellant would never have chosen Pipri or the district of Mirzapur for the location of this plant.

After elaborate discussions between the State Government and the promoters of the appellant company, the plant was set up at Pipri and a contract was entered into between the State Government and the appellant on 30.9.1963 ensuring the supply of electricity from the point of generation to the appellant for a period of 25 years from 1.4.64. The supply, to the extent of 6.5 MW. was to be from Rihand hydel station at a fixed rates of 2.5 paise per unit. An additional supply of 1.5 MW was also promised from an inter-connection at the rate of 5 N.P. per unit. The rates could be revised after the first sixteen years but any enhancement in rates was not to exceed 10 per cent of the rates agreed upon.

The State agreed further to supply 4.5 MW to the appellant from the Obra Hydro-Electric Project on such rates as would be fixed subsequently. It may be mentioned that this clause gave rise to disputes which were referred to arbitration. An award was made by justice D.P. Madan, a retired judge of this Court, which was made a decree of this Court by an order dated 1.4.1987. Under the award, the rate of supply was fixed at 8.69 paise per unit. The State's grievance is that it incurred a loss of Rs. 10.55 crores by supplying electricity from Rihand between 1.4.64 and 19.5.83 at concessional rates instead of applying the uniform tariff applicable to other "bulk power" consumers, briefly referred to as "HV-2 rates." It says also that it likewise suffered a loss of 12.4 crores due to the supply at 8.69 paise instead of normal rates, from Obra between 1.4.71 and 31.3.89, when the agreement, came to an end by efflux of time.

Obviously, it was not economical to continue supplying energy at the preposterously low rates to which the State had committed itself in 1963 on account of the conditions that prevailed at the time of the agreement. The powers of the State or the Boards to revise contractual rates unilaterally were examined by this Court in Indian Aluminium Company Ltd. v. Kerala State Electricity Board [1976] 1 SCR

70. It is sufficient to say that, after considering the provisions of section 49 and 59 of the Supply Act, the Court held that the Electricity Board were not entitled to enhance charges in derogation of stipulations contained in agreement entered into between parties. This decision led to the provisions of the Supply Act being amended by various States. The State of Karnataka, Orissa and Rajasthan brought in amendments enabling the Electricity Board to supersede contracts and 160 revise the rates contained in earlier agreements. The U.P. Government, also enacted the Electricity Laws (Uttar Pradesh Amendment), Act, 1983, to vest the State's agreement with the Board and to enable the Board to revise the contractual rates. The Act came into force from 20.5.1983. Section 7 of the said Act amended Section 60 of the Supply Act, 1948 by inserting the following sub-sections (3) to (5) with retrospective effect from April 1, 1965 :

(3) All expenditure which the State Government may, not later than two months from the commencement of the Electricity Laws (Uttar Pradesh Amendment) Act, 1983, declare to have been incurred by it on capital account in connection with the purposes of this Act in respect of the Rihand Hydro Power System shall also be deemed to be a loan advanced to the Board under section 64 on the date of commencement of this sub-section and all assets acquired by such expenditure shall vest in the Board with effect from such commencement. (4) The provisions of the sub-sections (1) and (1- A) shall, subject to the provisions of sub-section (5) apply in relation to the debts and obligations incurred, contracts entered into and matters and things obliged to be done by, with or for the State Government in respect of the Rihand Hydro Power system after the first constitution of the Board and before the commencement of this sub-section as they apply in relation to debts and obligations incurred, contracts entered into, matters and things engaged to be done by, with or for the State Government for any of the purposes of this Act before the first constitution of the Board. (5) All such contracts entered into by the State Government for supply of electrical energy based on or connected with the generation of electricity from the Rihand Hydro Electric Generating Station to any consumer and any contract entered into by the Board on or after April 1, 1965 for the supply of electrical energy to such consumer shall operate subject to the modifications specified in the following clauses, which shall have effect from the date of the commencement of the Electricity Laws (Uttar Pradesh Amendment) Act, 1983 (hereinafter referred to as the said date):-
161
(a) the rates to be charged by the Board for the energy supplied by it to any consumer under any contract for which the payment will be due for the first time on or after the said date shall be such as may with the previous approval of the State Government be fixed by the Board, having due regard to the geographical position of the area of supply, the nature of the supply and purpose for which supply is required and any other relevant factor.
(b) If the State Government directs the Board under Section 22-B of Indian Electricity Act, 1910 or under any other law for the time being in force to reduce the supply of energy to a consumer and thereupon the Board reduces the supply of energy to such consumer accordingly, the consumer concerned shall not be entitled to any compensation for such reduction, and if the consumer consumes energy in excess of the reduced limit fixed under the said section 22-B or any other law for the time being in force as the case may be, then the Board shall have the right to discountinue the supply to the consumers without notice ,and without prejudice to the said right of the Board, the consumer shall be liable to pay for such excess consumption at double the normal rate fixed under clause (a);
(c) Any arbitration agreement contained in such contract shall be subjects to the provisions of this sub-section.

Parliament also, at about the same time, amended s. 59 of the Act by Act 18 of 1983. The amended s. 59(1), which is sufficient for our purpose reads thus :

59. General principles for Board's finance - (1) The Board shall, after taking credit for any subvention from the State Government under Section 63, carry on its operation under this Act and adjust its tariffs so as to ensure that the total revenues in any year of account shall, after meeting all expenses properly chargeable to revenues, including operating, maintenance and management expenses, taxes (if any) on income and profits depreciation and interest payable on all debentures, bonds and loan, leave such surplus as is not less than three per cent, or such higher percentage, as the State Government may, by notification in the official Gazette, specify in this behalf, of the value of the fixed assets of the Board in service at the 162 beginning of such year.

Explanation - For the purposes of this sub-section.

"value of the fixed assets of the Board in service at the beginning of the year" means the original cost of such fixed assets as reduced by the aggregate of the cumulative depreciation in respect of such assets calculated in accordance with the provisions of this Act and consumer's contributions for service lines.
It has been pointed out to us that the U.P. State amendment is somewhat different from those of the other States. The Karnataka legislature amended s. 49 of the 1948 Act and the Orissa and Rajasthan legislatures inserted s. 49A in the said Act. These provisions enabled the Boards' to prescribe tariffs and these rates were to prevail over those specified in the agreement. The latter two amendments actually declare the relevant clauses in the agreement void from inception. The U.P. amendment. however, retains the effectiveness of the earlier contracts and only reads into them the rates that may be prescribed by the Board. This is the first difference. The second is that while the other legislations affect all agreements entered into before a specified date, the U.P. amendment is restricted to contracts for supply of electricity from the Rihand Hydro- Electric Generating Station. We are informed that, when the above amendment was sought to be effected, the only outstanding contract of the State for the supply of electricity from the Rihand Hydro-Electric Generating Station was the contract with the appellant on the 30th of September, 1963. There had been two agreements entered into for supply of electricity from this power station but the other one with Hindustan Aluminium Company had become ineffective since that company gave up its claim to supply from the above power plant in 1975-76 having been successful in putting up a power plant for its captive use. Thus, though the Act purports to be one of general application, it was really intended to enable the State and the Board to modify the rates of supply of electricity to appellant under the contract of 30.9.1963.
At this stage it may be useful to refer also to the terms of s. 49 of the Act. It reads thus :
(1) Subject to the provisions of this Act and or regulations, if any, made in this behalf, the Board may supply electricity to any person not being a licensee upon such terms and conditions as the Board thinks fit and may for the purposes of such supply frame uniform tariffs.
163
(2) In fixing the uniform tariffs the Board shall have regard to all or any of the following factors, namely :-
(a) the nature of the supply and the purposes for which it is required :
(b) the co-ordinated development of the supply and distribution of electricity within the State in the most efficient and economical manner, with particular reference to such development in areas not for the time being served or adequately served by the licensee:
(c) the simplification and standardisation of methods and rates of charges for such supplies :
(d) the extension and cheapening of supplies of electricity to sparsely developed areas. (3) Nothing in the foregoing provisions of this section shall derogate from the power of the Board, if it considers it necessary or expedient to fix different tariffs for the supply of electricity to any person not being a licensee, having regard to the geographical position of any area, the nature of the supply and purpose for which supply is required and any other relevant factors. (4) In fixing the tariff and conditions for the supply of electricity, the Board shall not show undue preference to any person.

After the statute was thus amended, the Additional Chief Engineer of the Board wrote to the appellant on 6.2.1984 stating that, though the bills were being drawn on the basis of the agreement, the rates were subject to revision with effect from May 20, 1983 with the approval of the State Government and that a supplementary bill would be sent for the arrears as and when the rates were revised in pursuance of section 60(5) (a). On 5th April, 1984, the appellant filed Writ Petition No. 1818 of 1984 in the High Court of Allahabad assailing the validity of section 7 of the amending Act and the right of the Board to enhance the rates. While admitting the writ petition, the High Court passed an interim order to the effect that the State Government should provide an opportunity of hearing to the appellant before bringing about any change in the terms and conditions of the Agreement or tariff rates and that no revised rates shall be charged from the 164 appellant till it is heard, and the matter decided, by the State Government. On June 11, 1984, the Law Officer of the Board wrote to the appellant requesting it to give in writing the points which they wanted to urge before the rates were approved by the State Government. According to the appellant, this was not sufficient compliance with the court's order and it moved the High Court for amending its petition and made further applications to the Court. It may be mentioned that the stand taken up by the Board in the writ petition was that the writ petition was premature as the State's approval had not been obtained and no injury had been caused to the appellant. But, suddenly, on 31.1.85, the Board wrote to the appellant informing it that the State Government had approved the levy of rates as per Schedule HV-2 (as defined in the U.P. Gazette Notification dated 29th October, 1982) applicable to heavy power consumers in substitution of the rates mentioned in the agreement of 20th September, 1963. It was stated-curiously enough-that the approval of the State Government had been given on 28.9.1983. The effect of the revision was to oblige the petitioner to pay 57.71 paise per unit for 1983- 84 and 61.60 paise per unit for 1984-85. An idea of the magnitude of the revision can be had by pointing out that supplementary bills raised on the basis of the revision for the period 20.5.83 to 31.12.1984 were to the tune of Rs. 3.07 crores. The appellant's allegation is that no such approval had been given and it is asserted that the internal correspondence between Board and State would show that the legal Department of the Board had raised certain objections to the levy of HV-2 rates on the appellant, and that consequently Board had sent a fresh proposal in December 1983 seeking approval of the State Government for imposing a flat rate in respect of supplies to the appellant in place of earlier proposal. It is also stated no proposal was made, or approval sought, for imposing the revised rates w.e.f. 20.5.1983.

The Board, however, proceeded to make demands against the appellant on the basis of the revised rates. According to the Board, reference was made to a resolution dated 30.1.85 to the withdrawal on that date of the proposal for a flat rate in place of HV-2 rates. Thus, demands on the basis of HV-2 rates were sought to be sustained. The demands amounted to several crores of rupees and disconnection was threatened in case of nonpayment. The appellant obtained certain interim orders from High Court (which have been subsequently considered and modified from time to time by this court during the pendency of these appeals). It is, however, not necessary to refer to these interim orders as the final liability of the appellant will have to be decided on the basis of the orders of this Court on the appeals.

165

The writ petition was heard by a Bench of two judges. Both judges repelled the challenge to the validity of the Amendment Act but differed on some of the points which came up for their consideration. Srivastava, J. was of the opinion that the intention and purpose of the Amendment Act was to revise the existing contractual rate of energy charges and charge higher rates upto the extent of uniform tariff rates for the supply of electricity to the consumers whose contract stood modified by the said statute. The rates so fixed had to be dependent upon the factors enumerated in section 60(5). According to him, the material on record showed that the factors enumerated in section 60(5) had not been taken into account by the Board before fixing the rates or by the State Government in according its approval to the same. The Board and the Government appeared to have acted upon a consideration of the factors mentioned in section 49(2) of the Act of 1948 while framing a uniform tariff but this was not sufficient compliance with the provisions of section 60(5). On the other hand, Mathur. J. was of the opinion that the move for amendment of the Act and enforcement of HV-2 tariff was initiated by the Board and that the notings contained a detailed justification for enforcing the said tariff. It also appeared from the statement of objects and reasons of the amending bill that the supply of electricity at concessional rates despite losses and the desirability of replacing the said rate by uniform tariff came up for discussion in the State Legislature and that the Board did not act wrongly or illegally if it felt that it had no option but to apply uniform rates in view of the statement contained in the objects and reasons of the bill and the discussion in the State Legislature. He was also of the opinion that the factors contemplated by section 60(5) (a) were similar to those envisaged by section 49(2), and since consideration had been given to the latter factors while farming the uniform tariff, no consideration of factors relevant to individual consumers was called for. The two learned judges thus differed on the following two points :

(a) Whether the language of section 60 (5) (a) of U.P. Act No. 12 of 1983 required consideration of factors prescribed in section 60 (5) (a) viz., geographical position of the area of supply, the nature of supply and purpose for which supply is required and other relevant factors with reference to petitioner company for revising the existing contractual rate of H.C. tariff?
(b) Whether the factors mentioned in section 49(2) of Electricity (Supply) Act, 1948, having already been considered at the time of farming uniform tariff no fresh consideration of any factors mentioned in section 60(5)(a) of U.P. Act No. 12 of 1983 was required when the uniform tariff itself was being fixed while 166 revising the rate ?

The difference of opinion was, therefore, referred to a third Judge, Mehrotra, J. This learned Judge answered that question referred to him as follows :

(a) The language of section 60(5)(a) of U.P. Act 12 of 1983 requires consideration of factors prescribed in it with reference to the petitioner company for revising the existing contractual rate;

and

(b) Fresh consideration of the factors mentioned in section 60(5)(a) was required irrespective of the fact that factors mentioned in section 49(2) of the Electricity (Supply) Act, 1948 had already been considered at the time of framing of the uniform tariff which was being fixed for the petitioner company while revising the rates.

Consequent on the opinion of this learned Judge the writ petition was allowed and a writ of certiorari was issued quashing the approval dated 28.9.1983 given by the State Government to the new rates and the consequent resolutions, sanctions, bills and demands of the Board and the State Government. A writ of mandamus was also issued commanding the respondents not to charge the uniform tariff rate for the period beginning from 20th May, 1983 till the rates were fixed in accordance with section 60(5) (a) of U.P. Act no. 12 of 1983. The Order disposing of the Writ petition finally is dated 2.4.1987.

Immediately the judgement was pronounced the State Electricity Board and the State Government sought a certificate of fitness for preferring an appeal to this Court and the High Court granted the certificate, as prayed for. This appeal has not been numbered on account of delay. Though the High Court had quashed the revision of the rates, it had left it to the board and State to fix revised rates afresh. That apart, the appellant had also a grievance that, in applying the HV-2 rates which were applicable to other consumers, the Board and the State had not taken into account the special factors relevant to the supplies made to it. The appellant also, therefore, filed S.L.P. No. 13967 of 1987 for leave to appeal from the judgement dated 2.4.1987. Leave has been granted by this Court on 8.4.1988 and the appeal of the company had been registered as C.A. 1306 of 1988.

In the meantime the Board and State were, apparently carrying on an 167 exercise for the revision of the rates afresh as directed by the High Court and, on 28.3.1988, the Board purported to fix the following revised rates for the supply from 20th May, 1983.

	 Period			      Rate (Paise per unit)
	   20.5.1983 to 31.3.1984     70.21
	   1.4.1984 to 31.3.1985 74.93
	   1.4.1985 to 31.3.1986 85.14
     1.4.1986 to 31.3.1987	       88.60

It will be observed that rates thus fixed, and said to have been approved by the State Government, were much higher than the HV-2 rates fixed earlier, objected to by the appellant and quashed by the High Court. Having done this, this Board sought leave to withdraw the appeal preferred by it. So far the appellant's appeal was concerned, it was contended that the appellant's remedy was to challenge the revision of 28.3.1988, if so advised, in fresh proceedings. This was the position when these appeals came to be heard by us on April 10, 1991.

We heard the appeals at length and reserved orders. In doing so we passed the following order :

"The appeals pertain to the fixation of tariff rates for supply of electricity to the appellants caustic soda plant at Renukoot. The appellants originally came to court challenging the levy of the electricity charges on the basis of HV-II rates applicable generally to consumers drawing supply from the U.P. State Electricity Board. However, the High Court held that the rates applicable to the appellants should be determined having regard to the individual circumstances of the appellants. This was by a majority judgement in the High Court. Subsequently, the Electricity Board had proposed, and the State Government has approved, certain rates for the period from 20.5.1983 to 31.3.1987 which are somewhat higher than the HV-II rates originally approved. This is the bone of controversy between the parties. We find that the State Government and Board have filed no counter affidavits in regard to the challenge by the appellants to the revision of rates effected subsequent to the High Court 168 judgment. In the circumstances, before we pronounce our judgment we think that, in the interests of justice, it would be proper to direct the State Board and the State Government to reconsider the fixation effected by them on the basis of the following directions :
1. Within a period of three weeks from today, the appellants will file before the State Electricity Board (with a copy to the State Government) a representation setting out what, according to them, are the individual factors which should be taken into account in fixing the rates applicable to them within the meaning of section 60(5)(a), 1948 as amended in 1983.
2. The State Electricity Board will consider this representation and make appropriate recommendations to the State Government. However, before doing so, and particularly if the Board intends to take into account any factors other than those mentioned in the appellants' representation, they should indicate the factors which they so wish to take into account, in their recommendations to the State Government. A copy of the recommendations should be forwarded to the appellants within seven weeks from today.
3. On receipt of the recommendations made by the Board, the appellants may submit to the State Government, if they so desire, any representation which they wish to make regarding the recommendations within a period of three weeks thereafter.
4. The State Government will consider the recommendations of the State Board as well as the representations made by the appellants to the Board as well as to themselves and approve of the rates which they consider proper in the circumstances of the case by a reasoned order, giving a board indication of the factors which they have taken into account in fixing the rates. This decision should be arrived at within a period of four weeks from the date of the receipt of the representation of the appellants.
5. As indicated above, since the High Court has decided that in fixing the rates the individual circumstances of the appellants should be taken into account, the State Board as well as the State Government should take into consideration the special 169 circumstances of the appellants in fixing the rates.
6. The Government's order may also, in case different rates for different periods are fixed, indicate the respective dates from which the several rates will come into operation. The rates and dates so fixed by the Government, will naturally be subject to the decision on these appeals."

Subsequent to our order, the appellant made a representation to the Board on 29.4.91. The Board made its recommendations thereon to the State Government on 26.6.91. Thereafter the appellant made its representation to the State Government on 22.7.91. The State Government has subsequently passed an order on 31.8.91 and submitted the same to us. It is perhaps sufficient to extract the concluding paragraphs of the order.

"After analysing the contentions of Kanoria Chemicals and the State Electricity Board, the State Govt. comes to the conclusion that M/s. Kanoria Chemicals and Industries Ltd. has taken benefit of establishing this unit in a backward area for the last 19 years and there is no justification in giving this benefit in continuously future also because this area has been developed in comparison to earlier years. The request of M/s. Kanoria Chemicals and Industries Ltd. that the factors shown by State Electricity Board should be limited to Rihand Hydel Power Station, is without justification since at present, they are getting supply from U.P. Grid and not from Rihand Power Station. Hence, the point of view of the State Electricity Board is justifiable.
8. After due consideration of representation dated 24.2.91 and 22.7.91 of M/s. Kanoria Chemicals and Industries Ltd. and the recommendations of the State Electricity Board dated 26.6.91, the State Govt. comes to the conclusion that M/s. Kanoria Chemicals and Industries Ltd. has failed to indicate any fact which comes under the provisions of Sec. 60(5)(a) of the Electricity (Supply) Act, 1948 and which has not been considered by the State Electricity Board while fixing the rates in March 88 has kept in mind the decision of Hon. High Court of Allahabad and 170 complied with the provisions of sec. 60(5)(a) of the Electricity (Supply) Act, 1948. Since keeping in view the factors enumerated in sec. 60(5)(a) of the Electricity (Supply) Act, 1948, the Rules were revised in March, 1988 in the following manner, hence there appears no necessity to change these rates :-
S.No.	Period				   Rate
   1.	20.5.83 to 31.3.84		   70.21 paise/unit
   2.	1.4.84 to 31.3.85		   74.93 paise/unit
   3.	1.4.85 to 31.3.86		   85.14 paise/unit
   4.	1.4.86 to 31.3.87		   88.60 paise/unit
In other words, the State and Board adhere to the rates fixed on 28.3.88.
It may be interesting to set out a comparative table of the revisions effected by the Board originally (which was quashed by the High Court) and the rates now approved :
     Period		HV-2 rate	    Revised rate
			 Paise/unit	      paise/unit
     20.5.83 to 31.3.84	    55.71		 70.21
     1984-85		    59.86		 74.93
     1985-86		    63.89		 85.14
     1986-87		    80.88		 88.60
     *1987-88		    84.64		 88.60
     *1988-89		    93.39		 88.60
* The revised rates for 1987-88 and 1988-89 are stated to be provisional but so far till today no fresh rates have been fixed in respect of these periods.
171
The resultant position is that the appellant is now facing huge demands in respect of the period since 20.5.1983 and till 31.3.1989 when the agreement expires, at rates which will be higher than the HV-2 rates which had been sought to be applied in the first instance. The appellant vehemently challenges the fixation of rates on 28.3.88 and 31.8.91.
A good part of the argument before us in these appeals, in the first instance, was addressed on the question whether the State Government was obliged to give a hearing to the consumer before revising the rates under section 60(5) and whether the factors relevant under s.60(5) can be said to have been taken into account on the ground that they had already been taken into account while fixing uniform rates under s.49. In this context, reference was made to several decisions and contentions where canvassed in regard to the nature of the process of fixation of rates of charges for supply of electricity. It is, however, unnecessary to go into all these aspects because, in pursuance of the directions of this Court dated 10.4.1991, the matter has been re-considered by the Board and the State Government and fresh rates have been fixed along with the respective dates of operation after hearing the appellant's representatives.
Broadly two principal submissions have been addressed before us at this stage on behalf of the appellants. The first is that the fixation of rates as on 31.8.1991 is not valid as the respondents have not complied with the directions given by this Court in the order dated 10.4.1991. It is argued that the respondents have neither disclosed the factors based on which the rates were revised in March 1988 nor have they indicated the monetary incidence or impact of the factors taken into account, though a specific request was made in this regard by the appellant to the Board and to the State Government. The appellant, it is said, has been gravely prejudiced and handicapped, in the absence of any such disclosure, in making any effective representation. Further in the final order dated 31.8.91, the State Government has stated that the fixation of rate by the State Government was based upon the consideration of facts and data communicated by the Board to the State Government in March 1988 but, admittedly, no facts, data or basis had been placed before this court at the time of the original writ petition on the basis of which the State Government had fixed the rates in March, 1988 compelling this Court to remand the matter for fresh consideration. Suddenly the Board, while concluding its recommendation to the State Government on 26.9.91 reminded the State Government that prior approval of the State Government for the rates had already been obtained in March 88 and persuaded the State Government to mechanically uphold the pre-determined rates. Finally, it is contended that even in this process of re- fixation of the 172 rates there was no genuine exercise to consider relevant factors in determining the rate under section 60(5)(a).
We do not think that there is any force in these contentions. By the time the matter came up before us for hearing in the first instance the State Government had already passed its order of revision dated March 28, 1988. The rates which had been recommended by the State Electricity Board and approved by the State Government were within the knowledge of the appellant. It was of course necessary and equitable that, before giving effect to these rates (if not even before they were recommended), the consumer should have had no opportunity of placing before the Electricity Board and the State Government its side of the picture. This opportunity has, however, been provided by to the appellant. The appellant has also filed its representation. After considering the representation, the Board made its recommendations to the State Government and a copy of these recommendations were also available to the appellant. The appellant also had full opportunity to meet the various points set out in the recommendations of the Board. The comments of both the Board and the appellant have been taken into account by the State Government before finally approving of the rates proposed by the Board. The grievance of the appellant seems to be that the Board has not set out anywhere the precise manner in which the rates recommended by them were arrived at and that this has considerably handicapped any effective representation being made by it to the Board and to the State Government. We do not think the proceedings are vitiated for this reason. It is true that the actual computations of the rates were not set out by the Board in its recommendations made in 1983 or 1985 or 1988 but the proper approach to the issue is not the one adopted by the petitioner. The section does not require the Board or the State Government to explain each and every step in its calculation. All that the State Government has to do is to take into consideration the factors relevant under section 60(5) and propose rates for fixation to the State Government. It is in order to ensure that these recommendations take into account all relevant factors that an opportunity has been provided to the consumer to satisfy the Board as well as the State Government that the fixation has not taken into account certain relevant factors. We, therefore, think the appellant must be held to have been given a fair opportunity under s. 60(5)(a) so long as it had an opportunity to explain to the Board and the State Government the factors individual to its case and also as to how and why the rates recommended by the Board need modification. Moreover, the issue here was in a narrow compass for the following reason. On the passing of the Amendment Act, the Board decided to substitute the contract rates by the HV-2 rates. But this was rendered infructuous because of the terms of section 60(5)(a) which, it was said, were 173 different from those of s. 49. If the factors under section 49 were alone to be taken into account then the consumers, one and all, would have been liable to pay for the electricity at the tariff rates. The claim of the appellant was that in applying these rates certain factors individual to it had not been taken into account. If one compares the two provisions, one will find that most of the elements are common to the two provisions. Both under section 49 and section 60 the authorities have to take into account the geographical position of any area, the nature of supply and purpose for which supply is required and any other relevant factor. The only difference between the two provisions is that since section 49 deals with a general fixation while section 60(5) deals with a fixation for a particular individual case, there may be some special factors to be taken into account which may or may not be germane while fixing the general tariff under section 49. Hence the only point which needed to be considered, when the matter was reexamined pursuant to our directions, was whether, having regard to the factors prevailing in the case of the appellant the rates to be fixed should be higher or lower than the HV-2 rates or whether they should be the same. It was open to the petitioner to contend, as it in fact did, that there are special features in its case which make it legitimate to fix some concessional rates as compared to other consumers. On the other hand, it is equally open to the State Electricity Board to contend that having regard to the prevalence of certain circumstances, the rates to be fixed should be higher than the tariff rates applicable generally. This is a short aspect on which both parties have made their positions clear. Apart from the general factors which have been taken into account in fixing the general tariff rates, the Board has, in making its recommendations, taken into account the purpose for which supply was required by the petitioner along with the factor of recurring losses incurred by the Board year after year and its statutory requirements to maintain a minimum surplus of 3 per cent as required under section 59 of the Supply Act, 1948. We are, therefore, satisfied that the appellant had full opportunity to place all its special features before the Board and the State Government and that all aspects have been fully considered by the authorities. The fixation of rates on 31.8.1991 is not, therefore, vitiated for the reasons urged by the appellant.
The only other aspect that requires consideration is regarding the maintainability of the rates as now fixed by the Board and the State. Three questions arise in regard to this :
(i) Can the Board fix rates higher than HV-2 rates in respect of bulk consumers like the company for whom a concessional rate had been granted on special considerations ?
174
(ii) Can the Board determine rates in 1991 and make them retrospective w.e.f. 1983?
(iii)Was there material for the Board to fix rates which they have eventually fixed?

We find that the answer to the first two questions posed only be in the affirmative. On the first issue, there are no obstacles, statutory or theoretical, standing in the way of the Board fixing rates for the company which will be higher than the rates applicable to bulk consumers. The provision in s.60(5)(a) is intended to enable the Board and State to cut off the shackles cast by an ancient contract entered into at a time when conditions were totally different. It confers an absolute and unrestricted enabling power to revise the rates in an appropriate manner and contains no restriction of the nature suggested for the appellant. In doing this, the only limitation which the statute requires the authorities to keep in mind are the factors mentioned in the section. Whether the revised rates for the consumer governed earlier by the contract should be higher or lower than, or equal to, the tariff rates would depend on a large number of considerations, in particular, the basis on which, and the point of time at which, those general rates were fixed. In principle, it is quite conceivable that, in an appropriate case, a consideration of the relevant factors may justify even a rate higher than the general tariff rates intended for the particular category of consumers. We shall examine later whether this was justified in the present case. At the moment, all we are concerned with is the legality of fixing such higher rates and we see no difficulty in this either on the language of the Statute or on other considerations.

A retrospective effect to the revision also seems to be clearly envisaged by the section. One can easily conceive a weighty reason for saying so. If the section were interpreted as conferring a power of revision only prospectively, a consumer affected can easily frustrate the effect of the provision by initiating proceedings seeking an injunction restraining the Board and State from revising the rates, on one ground or other, and thus getting the revision deferred indefinitely. Or, again, the revision of rates, even if effected promptly by the Board and State, may prove infructuous for one reason or another. Indeed, even in the present case, the Board and State were fairly prompt in taking steps. Even in January 1984, they warned the appellant that they were proposing to revise the rates and they did this too as early as in 1985. For reasons for which they cannot be blamed this proved ineffective. They revised the rates again in March 1988 and August 1991 and, till today, the validity of their action is under challenge. In this 175 state of affairs, it would be a very impractical interpretation of the section to say that the revision of rates can only be prospective.

The language of the section also supports this view. Slightly rearranging the syntax of the clause to facilitate easier understanding, what it provides is that the revised rates fixed by the Board shall be the rates to be charged by the Board for the energy supplied by it to any consumer for which the payment will be due for the first time on or after the 20th May, 1983. In other words, the rates eventually fixed will, by force of statute, apply to all supply of electricity for which the charges become payable in terms of the contract, after 20.5.1983. There are three objections suggested against this interpretation. The first is that it precludes the Board and State, where they choose to do so, from revising the rates prospectively or with effect from such dates, after 20.5.1983, which they may consider appropriate. We think this consequence does not flow from the language of the provision. The mandate is only that the rates to be charged on supplies for which payment becomes due after 20.8.83 shall be as fixed by the Board. The powers of the Board in fixing the rates- including the dates from which they will be operative-are not restricted in any manner. The Board is at complete liberty to fix different rates from different dates and that scheme of fixation will be read with the contract. Only the Board cannot revise the rates in respect of supplies for which payment under the contract, fell due before 20.5.83. The second objection, which is a follow up of the first, is that if the power u/s 60 is held exercisable more than once, the interpretation will permit successive revisions, each superseding the earlier one, a position that could lead to immense harassment. We have no doubt the power u/s 60 is exercisable more than once. All the same, the answer to the appellant's objection is that, while this could be a basis of substantial harassment if repeated revisions are automatically dated back to 20.5.83 (as argued, on the first point, for the assessee), it loses all force on our interpretation leaving it open to the Board and State to fix the dates with effect from which revisions will be effective. In view of this, one can take in that, while making a subsequent revision, the authorities will not normally tamper with an earlier revision (s) or alter the dates of effectiveness fixed for the earlier revision (s) without a valid reason to do so. If this is done, it will be open to a court to examine the basis thereof and sustain it only where the earlier fixation was based on an error or misconception or the like and called for modification. The third objection is that the Hindi version of the Amendment Act is differently worded and does not contain the words "for the first time" found in the English version. Reliance is placed on the decision of a Bench of seven judges of the Allahabad High Court in Mata Badal Pandey v. Board of Revenue, (1974) U.P.T.C. 570 to 176 the effect that, where there appears a doubt or ambiguity on a plain reading of the English words as to the true intention of the legislature and the Hindi version is conflicting or different. the Hindi text will be the key for finding the answer. We do not think the Hindi version really alters the position; actually it is the presence of the words "for the first time" in the English version that create an ambiguity. Without these words, the clause clearly provides that all supply of electricity, for which payment is to be made after 20.5.83, will be charged at the rates to be fixed by the Board. We, therefore, reject the appellant's contention and hold that the fixation by the Board of rates from 20.5.83 and, at different rates for different periods of time, is unexceptionable.

This takes us to the real and crucial question in the case as to whether rates to be fixed in the present case should, on proper consideration, be less than, equal to or higher than the general HV-2 rates. The appellant contends that it should be charged at the cost of generation plus a reasonable margin of profit or at the rate at which the supply is made to the Madhya Pradesh State Electricity Board. At any rate, it is said, the rates charged to the appellant should be less than HV-2 rates. For this it relies on: (a) the special circumstance that the appellant, at great detriment to itself, agreed to set up a caustic soda plant in a backward area at the request of the State Government and in public interest only because of a promised concession in rates of electricity supply; (b) the fact that the supply to the appellant is metered at the point of generation with the result that the transmission and distribution losses, in so far as the appellant is concerned, are borne by the appellant and not by the Board as in the case of other consumers and (c) the important fact that electricity, in the case of the appellant, is one of the only two raw materials needed for its business. On the other hand, for the Electricity Board, it is contended that the appellant should be called upon to pay higher than HV-2 rates for the following reasons :

(i) The appellant has been having substantial supplies of electricity at nominal rates of 2.5 paise and 2.75 paise per unit between 1963 and 1983.
(ii) The supply to the assessee is being made only from the State Grid and there is no reason why it should draw the supply at lower rates than others :
(iii) The Board had been incurring heavy losses over the years. This is to a considerable extent due to the spiraling demand for electricity, the Board's responsibilities under the statute to co-
177

ordinate development of the supply of energy throughout the State and the necessity to supply energy at concessional rates to certain sectors such as the agricultural sector.

(iv) The Board is also entitled, under s.59 of the 1948 Act, to take into account the necessity of building up a surplus, statutorily fixed, in the fixation of rates of supply to all or any of its consumers.

We have given careful thought to the considerations urged before us and we are of opinion that there is no material to justify any departure from the HV-2 rates in the case of the appellant. We find no force in the contentions put forward on behalf of the appellant to reduce the rates applicable to the appellant below HV-2 level. The special circumstances pleaded have lost their importance with the passage of time. It is obvious that the conditions that prevailed in 1963 are not valid and the appellant has had the benefit of concessional rates for twenty years. No doubt the benefits would have continued for five more years but for statutory intervention. But the statute permits a reconsideration of the situation as in May 1983 and it is unarguable, it seems to us, that the rate of 2.75 p. should continue even after 1983 or that the appellant should be entitled to any special concession. The consideration that electricity is a "raw material" in the assessee's business is, again, irrelevant for it can mean nothing more than that the appellant needs substantial quantities of the energy and there is no reason why it should not pay for it at the normal market rates. The point regarding take off of supply at the generating point will no doubt have some relevance on the question of rates and we shall refer to this aspect later in the context of the pleas put forward by the Board. We are, therefore, of the view that the appellant has no valid justification for staking a claim to less than the HV- 2 rates.

Equally, it seems to us, the authorities have no case for seeking to raise the rates beyond the HV-2 rates. They are supplying energy to the appellant from the grid since 1968 and they cannot justifiably seek to demand higher rates from the appellant than from the HV-2 consumers. This is sought to be justified on the basis of the huge losses that the Board has been incurring and the statutory justification for escalation in the rates keeping in view the necessity to build up a surplus. This, however, is an aspect of working which should affect all the consumers equally. May be the Board can, in appropriate circumstances, seek to make up for a part of the losses by hiking up the rates to one particular category of consumers but that would not be justified here as the transmission and distribution losses 178 in respect of the supply to the appellant are borne by it and, in the absence of some special vital reason, it would not be equitable to fix the rates of supply to the appellant above the rates applicable to other HV-2 consumers. Some reference was made to the difficulties in completely fitting the scheme of computations for determining the HV_2 rates into the scheme under the appellant's contract. It is, however, unnecessary to go into that aspect as we are only on the question of rates and holding that there is no justification for charging more than HV-2 rates from the appellant. Moreover, the appellant has been paying for the Obra supply at HV-2 rates since 1989. We have also been informed that in 1972 the appellant took a further additional supply of 8 MW and agreed to pay therefor at HV- 2B rates as applicable to other Bulk Power Consumers in the State.

In these circumstances, we have reached to the conclusion that there is no justification to charge more than HV-2 rates from the appellant. We, therefore, allow this appeal in part, quash the determinations of 1988 and 1991 and direct that the appellants should be charged from 20.5.83 to 31.3.89 at the HV-2 rates applicable to other consumers. The appeal of the appellant is partly allowed to the above extent. The Board's appeal has not yet been numbered as it is delayed by a few days. It was, however, stated that the Board wishes to withdraw its appeal because of the subsequent developments. For these reasons and also in view of our above conclusion the Board's appeal also stands dismissed. In the circumstances, we direct each party to bear its own costs.

T.N.A.				C.A. 1306/88 Partly allowed.
				      C.A. 128/92 dismissed.