State of Jammu-Kashmir - Section

Section 4 in Jammu and Kashmir State Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2013

4. Eligibility Criteria. - (a) Wind power project

- using new wind turbine generators.
(b)Small hydro project - located at the sites approved by State Nodal Agency/ State Government using new plant and machinery, and installed power plant capacity to be lower than or equal to 25 MW at single location.
(c)[ Biomass power project based on Rankine cycle technology [Substituted by Notification No. 49-JKSERC of 2016, dated 22.3.2016 (w.e.f. 17.5.2013).] - Biomass power projects using new plant and machinery based on Rankine cycle technology and using biomass fuel sources, provided use of fossil fuel is restricted only up to 15% in terms of calorific value on annual basis, till 31.03.2018.]
(d)Non-fossil fuel based co-generation project - The project shall qualify to be termed as a non-fossil fuel based co-generation project, if it is using new plant and machinery and is in accordance with the definition and also meets the qualifying requirement outlined below:
Topping cycle mode of co-generation - Any facility that uses non-fossil fuel input for the power generation and also utilizes the thermal energy generated for useful heat applications in other industrial activities simultaneously.Provided that for the co-generation facility to qualify under topping cycle mode, the sum of useful power output and one half the useful thermal output be greater than 45% of the facility's energy consumption, during season.Explanation. - For the purposes of this clause,
(a)'Useful power output' is the gross electrical output from the generator. There will be an auxiliary consumption in the cogeneration plant itself (e.g. the boiler feed pump and the FD/ID fans). In order to compute the net power output it would be necessary to subtract the auxiliary consumption from the gross output. For simplicity of calculation, the useful power output is defined as the gross electricity (kWh) output from the generator.
(b)'Useful Thermal Output' is the useful heat (steam) that is provided to the process by the cogeneration facility.
(c)'Energy Consumption' of the facility is the useful energy input that is supplied by the fuel (normally bagasse or other such biomass fuel).
(d)'topping cycle' means a cogeneration process in which thermal energy produces electricity followed by useful heat application in industrial activities.
(e)Solar PV and Solar Thermal Power Project - Based on Technologies approved by MNRE.
(f)Biomass Gasifier based Power Project - The project shall qualify to be termed as a biomass gasifier based power project, if it is using new plant and machinery and having a Grid connected system that uses 100% producer gas engine, coupled with gasifier technologies approved by MNRE.
(g)Biogas based Power Project - The project shall qualify to be termed as a biogas based power project, if it is using new plant and machinery and having grid connected system that uses 100% Biogas fired engine, coupled with Biogas technology for co-digesting agriculture residues, manure and other bio waste as may be approved by MNRE.
(h)[ Municipal Solid Waste based power project. [Added by Notification No. 49-JKSERC of 2016, dated 22.3.2016 (w.e.f. 17.5.2013).] – The project shall qualify to be termed as a Municipal Solid Waste based power project, if it is using new plant and machinery based on Rankine cycle technology and using Municipal Solid Waste as fuel sources.]
(i)[ Refuse Derived Fuel based power project. – The project shall qualify to be termed as a Refuse Derived Fuel based power project, if it is using new plant and machinery based on Rankine cycle technology and using Refuse Derived Fuel as fuel sources.] [Added by Notification No. 49-JKSERC of 2016, dated 22.3.2016 (w.e.f. 17.5.2013).]