Showing contexts for: parallel operation charge in Heg Limited vs Madhya Pradesh Electricity Regulatory ... on 8 October, 2015Matching Fragments
(y) that the pre condition for levy of Parallel Operation Charge is the co-location of the Captive Power Plant and load. If these are at different places there is no grid support and there is no parallel operation.
(z) that the Appellant's Tawa plant is a CPP which is not co-located with the consuming facilities (load). The captive plant is at a distance of over 100 kms from the consuming facilities i.e. where the power is used. The electricity generated from Tawa plant is injected in the grid through open access and conveyed through the grid. In fact, even auxiliary power for start up of the Tawa plant is obtained from a separate connection from the grid and the charges for the same are paid separately. There is, therefore, no support taken from the grid for which parallel operation charges can be levied.