::: Downloaded on - 15/04/2017 20:37:15 :::HCHP 2

agreement No. 238 for 2006-07 as per letter dated 30.3.2007. Certain disputes arose between the parties.

.

The Superintending Engineer Arbitration Circle, HPPWD, Solan was appointed as the sole arbitrator by the Engineer-in-Chief, HPPWD vide letter dated 13.5.2014. The Arbitrator entered into reference on of 29.5.2014. The first hearing of the matter was held on 5.8.2014 and the second hearing was held on rt 18.11.2014. The third hearing was held on 7.7.2015.

2. Accordingly, the Court is of the considered view that the Arbitrator has failed to conclude the proceedings in accordance with law and as such the appointment of Arbitrator by the Engineer-in-Chief, HPPWD is terminated.

.

3. Accordingly, Mr. Jagdish Thakur, Advocate is appointed as Arbitrator and Ms. Anita Parmar Advocate is appointed as assisting Arbitrator. The Superintending Engineer Arbitration Circle, HPPWD, of Solan is directed to handover the entire record of the proceedings to the newly appointed Arbitrator within a rt period of one week. The Arbitrator is directed to enter into reference within a period of three weeks from the date of receipt of the copy of the order as well as record.