Document Fragment View

Matching Fragments

9. The Chief Executive Officer, GMDA on 3.5.2002 issued a notice to the petitioner No. 2 directing to remove/demolish the unauthorized construction of the 6th and 7th floor as well as the cantilever as the same were constructed in violation of the 1985 Act as well as the building bye-laws and zoning regulation. The writ petitioner on receipt of the said notice informed Chief Executive Officer, GMDA on 6.5.2002 that they obtained the permission for construction from GMC and for construction of the 6th to 8th floor they obtained the judgment of the standing appellate committee and, therefore, there was no unauthorized construction. It was further informed that there is no violation of approved drawing regarding cantilever. The Town Planner, GMDA, thereafter on 4.10.2002 informed the petitioner No. 2 that a routine inspection of the multistoried building will be conducted by the authority and, therefore, asked him to submit copies of the building permission and approved drawing on the basis of which the construction was made and informed him that in the event of failure to co-operate with the authority as well as to submit the said building permission and approved drawing within the stipulated time and if continued to make construction of the building deviating from the building bye-laws and permission issued to him, the authority will initiate action like demolition, etc., as per the 1985 Act without any further notice.