Skip to main content
Indian Kanoon - Search engine for Indian Law
Document Fragment View
Matching Fragments
(iv) The report has also made about the property bearing No.4/294. After giving details of the building use, assessment, fire safety norms, health norms and licence, the report is made about the inspection carried out on 28.3.2000 wherein it is stated that on the first floor Eastern part is pertaining to packing section where packing work of finished goods is carried on. Thereafter, glass cabin office is situated and it is air-conditioned. Then there is space open to sky and in the Eastern portion of the room which is situated at the end, the chemicals used for Jhari gilding work are stored and that room is used as store room in which chemicals like lacquer etc. are stored. On the second floor in the Eastern portion, machines for Silver gild are in operation. The portion thereafter is open to sky and thereafter in the Western side, heating machines, two in number, are in operation. When these machines are in working condition, the temperature of the room is slightly hot. On the Western wall exhaust fan is fitted and a chimney with galvanized sheet is also fitted. What is important is that the report makes a specific note that a third floor is situated towards the Western side after the open to sky portion of the property. Eastern portion is open and on the third floor gild machines are situated and electricity is used and during that process fume with slightly white colour is caused in a very small quantity and in a very small quantity smell is noticed. In this process chemicals like lacquer are used. Similarly, on the 4th floor towards the Western part in a room chemical gild machine is operated and in that also electricity is used and during the site inspection the windows towards East and West were found to be closed.