28. In these peculiar facts and circumstance, HWRA is directed to look into the matter and dispose of the application dated 19.06.2022 for permission pending with it expeditiously preferably within three months from the date of receipt of a copy of this order (if not already disposed of).

Compliance with EC condition of maintaining Zero Liquid Discharge

29. As per EC dated 03.04.2023 Respondent No. 1 is a Zero Liquid Discharge (ZLD) unit. Specific Condition No.(vi) in EC dated 03.04.2023 reads as under:-

"(vi) Spent Waste/stillage shall be sent to the decanter followed by the Multiple Effect Evaporator and dryer to form DDGS. DDGS to be used as cattle feed. The MEE & Drier condensate, spent lees, WTP Rejects, Boiler & Cooling tower blowdowns, washings etc., is shall be treated in the 'condensate Polishing Unit' (CPU).

STP shall be installed to treat domestic waste water. The plant shall be based on 'Zero Liquid Discharge' system and no effluent/treated water shall be discharged outside factory premises."