Showing contexts for: Without cte in Ramchandra Chaurasia vs State Of Jharkhand on 23 August, 2022Matching Fragments
64), 87, 103,105,110, 90, 148 1 12, 147,149,151, 1 60 crushers c. Present Status of Stone Crusher/ Stone Mine for which request have been made for cancellation of CTO by District Level Task Force, (Mining) Sahibganj as reported in the meeting with CPCB team dated 3-4th March 2022(List annexed as Annexure VIII) d. Present Status of stone crushers which have been relocated from their existing location by District Level Task Force, (Mining) Sahibganj as reported in the meeting with CPCB team dated 3-4th March 2022(List annexed as Annexure IX) e. 33 crushers running without CTE have been dismantled.
3.2 All the crushers in the area running without valid CTE/ CTO to be treated as illegal and be demolished. Taking lesson from earlier demolition by dismantling the conveyer system& disconnection of power supply that such crusher start operating after sometime as reported, it is proposed that whenever any crusher is demolished for running without CTE, the whole foundation to be demolished & all the major machineries of the crushers (i.e. primary crusher, secondary crusher, screen, hopper, loader, DG set, etc) should be seized.
3.3 The crusher having valid CTE, but running without valid CTO should be sealed with ensuring disconnection of power supply/seize of DG set.
163.4 All the units using DG sets as power source must have valid authorization as per rule (Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016).
3.5 Taking into account the scarcity of water in the area(where villagers use Zaria Nallah water for drinking, bathing and other domestic purpose) poor conditions effective emission control system, it is proposed that stone crushers with capacity greater than 100 TPH must be provided with bag filters as emission control system for primary crusher, secondary crusher & screen in a time bound manner (preferably in 6 month).