Showing contexts for: NTPC Simhadri in K.Vignesh vs Nlc India Limited on 8 December, 2025Matching Fragments
3.Sika Thermal Power Project (335 days) 4 Site From 01.06.2015 to From 01.06.2015 1.NTPC- CTC Engineer 30.06.2017 to 30.06.2017 Simhadri discrepanc Standard Standard 01.06.2016 to y between Rehabilitators Pvt. Rehabilitators Pvt. 30.09.2016 (4 (A) & (B) Ltd., (NTPC Ltd., months) Simhadri, NTPC CTC-Rs.1,80,000/- 2.NTPC-